<regulation prefix="Regulation" num=".11" citation="COMAR 26.10.18.11" title_num="26" subtitle_num="10" chapter_num="18" heading="Inspection Requirements for an AST System.">
  <paragraph num="A.">
    <text>Definitions.</text>
    <paragraph num="(1)">
      <text>In this regulation, the following terms have the meanings stated.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Terms Defined.</text>
      <paragraph num="(a)">
        <text>“Remaining corrosion allowance” or “RCA” means the difference between the measured shell thickness and the minimum required thickness of an AST, measured in millimeters.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>“N” means the shell corrosion rate of an AST, measured in millimeters per year.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Periodic Visual Inspections.</text>
    <paragraph num="(1)">
      <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST shall conduct periodic visual inspections in accordance with:</text>
      <paragraph num="(a)">
        <text>The inspection procedures under §B(2) or (3) of this regulation; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The recordkeeping requirements under §B(4) and (5) of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST may meet the visual inspections requirement in §B(1) of this regulation by, at a minimum:</text>
      <paragraph num="(a)">
        <text>Inspecting for the following conditions monthly:</text>
        <paragraph num="(i)">
          <text>Signs of spills, releases, or discharges from any portion of the AST system;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Water in the secondary containment dike and AST or, if a double-walled AST, the primary storage tank and interstice;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>The condition of the secondary containment dike, including drain valves;</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>Signs of shell distortion;</text>
        </paragraph>
        <paragraph num="(v)">
          <text>Signs of settlement;</text>
        </paragraph>
        <paragraph num="(vi)">
          <text>Signs of corrosion;</text>
        </paragraph>
        <paragraph num="(vii)">
          <text>The condition of the AST foundation or supports;</text>
        </paragraph>
        <paragraph num="(viii)">
          <text>The condition of the exterior coating of the AST system;</text>
        </paragraph>
        <paragraph num="(ix)">
          <text>The condition of seams, rivets, and nozzle connections;</text>
        </paragraph>
        <paragraph num="(x)">
          <text>The condition of valves, pumps, piping, and other appurtenances directly connected to the AST;</text>
        </paragraph>
        <paragraph num="(xi)">
          <text>The condition of the tank gauge or an equivalent monitoring device;</text>
        </paragraph>
        <paragraph num="(xii)">
          <text>The condition of release detection systems; and</text>
        </paragraph>
        <paragraph num="(xiii)">
          <text>The condition of overfill protection equipment;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>Inspecting containment sumps associated with an underground piping system monthly by:</text>
        <paragraph num="(i)">
          <text>Checking for evidence of a spill, release or discharge; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Removing any liquid or debris; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(c)">
        <text>Removing any water found during the monthly inspection from the secondary containment dike and AST or, if a double-bottomed AST, the primary storage tank and interstice.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST may meet the periodic visual inspections requirement in §B(1) of this regulation by conducting periodic AST inspections in accordance with:</text>
      <paragraph num="(a)">
        <text>STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks” if the AST does not exceed:</text>
        <paragraph num="(i)">
          <text>30 feet in diameter; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>40 feet in height; or</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>Tank In-service Inspection Checklist in Annex C of API Standard 653 “Tank Inspection, Repair, Alteration, and Reconstruction”.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST shall maintain the following records related to periodic visual inspections:</text>
      <paragraph num="(a)">
        <text>If the AST system was inspected in accordance with §B(2) of this regulation, a written log or electronic record that includes:</text>
        <paragraph num="(i)">
          <text>The date of the inspection;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The name and title of the individual performing the inspection;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>A description of each deficiency found;</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>The name and title of the individual notified of the deficiencies found; and</text>
        </paragraph>
        <paragraph num="(v)">
          <text>A record of how and when the deficiencies were corrected; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>If the AST system was inspected in accordance with §B(3) of this regulation, the completed monthly and annual inspection checklists in STI/SPFA SP001 “Standard for the Inspection of Aboveground Storage Tanks”.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST shall maintain the records required in §B(4) of this regulation in accordance with Regulation .13 of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST shall conduct corrosion protection system inspections in accordance with Regulation .10 of this chapter.</text>
  </paragraph>
  <paragraph num="D.">
    <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST shall:</text>
    <paragraph num="(1)">
      <text>Inspect and clean normal and emergency vents for the field-erected AST annually; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Maintain records of the vent inspection and cleaning required in §D(1) of this regulation in accordance with Regulation .13 of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>Ultrasonic Thickness Inspections. An owner, an operator, and a person in charge of an AST system with a field-erected AST shall use ultrasonic thickness measurements of the external AST shell to determine shell integrity according to the following requirements:</text>
    <paragraph num="(1)">
      <text>If the corrosion rate is unknown for a field-erected AST, complete an initial ultrasonic thickness inspection not later than 2 years after June 13, 2022;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Perform ultrasonic thickness inspections at the lesser of the following intervals:</text>
      <paragraph num="(a)">
        <text>RCA/2N years; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>15 years;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Include the following information in the inspection records for each ultrasonic thickness inspection performed on an AST:</text>
      <paragraph num="(a)">
        <text>The date of the inspection;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The name and title of individual performing the inspection; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The ultrasonic thickness measurements; and</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Maintain the records for ultrasonic thickness inspections required under §E(3) of the regulation in accordance with Regulation .13 of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>External Inspections. An owner, an operator, and a person in charge of an AST system with a field-erected AST shall have an external inspection performed on the field-erected AST according to the following requirements:</text>
    <paragraph num="(1)">
      <text>An authorized inspector conducts external inspection on the field-erected AST.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Perform external inspections at the lesser of the following intervals:</text>
      <paragraph num="(a)">
        <text>RCA/4N years; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>5 years;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Inspect the following components of a field-erected AST during an external inspection:</text>
      <paragraph num="(a)">
        <text>The AST foundation;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The shell and roof of the AST, including shell and roof appurtenances;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The AST accessways;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>The AST grounding system;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>The wall and roof of an AST having an insulated covering;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Connected aboveground piping; and</text>
      </paragraph>
      <paragraph num="(g)">
        <text>The secondary containment dike;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>At a minimum, the authorized inspector conducting an external inspection of the field-erected AST shall complete the Tank In-service Inspection Checklist in Annex C of API Standard 653 “Tank Inspection, Repair, Alteration, and Reconstruction”;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Submit a copy of the final external inspection report to the Department within 60 days of completing the external inspection; and</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Maintain records of completed external inspections in accordance with Regulation .13 of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="G.">
    <text>Risk-based Inspection Program.</text>
    <paragraph num="(1)">
      <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST may implement a risk-based inspection program to develop an inspection plan for conducting internal inspections on the field-constructed AST.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>If implementing a risk-based inspection program, an owner, an operator, and a person in charge of an AST system with a field-erected AST shall:</text>
      <paragraph num="(a)">
        <text>Establish and implement the risk-based inspection program in accordance with API Recommended Practice 580 “Risk-based Inspection”;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Prior to implementation, have the risk-based inspection program, including the risk-based inspection assessment and inspection plan, reviewed and approved by an authorized inspector and a storage tank engineer.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>An owner, an operator, and a person in charge of an AST system with a field-erected AST shall maintain records related to the risk-based inspection program, including copies of the risk-based inspection assessment, inspection plan, and authorized inspector and storage tank engineer approvals, in accordance with the recordkeeping requirements in Regulation .13 of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="H.">
    <text>Internal Inspections. An owner, an operator, and a person in charge of an AST system with a field-erected AST shall have an internal inspection of a field-erected AST performed on the field-erected AST according to the following requirements:</text>
    <paragraph num="(1)">
      <text>An authorized inspector shall complete an internal inspection of a field-erected AST;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Complete an initial internal inspection on a new field-erected AST not later than:</text>
      <paragraph num="(a)">
        <text>10 years from the date the AST first contained oil; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>A maximum inspection interval established in accordance with API Standard 653 “Tank Inspection, Repair, Alteration, and Reconstruction” if the following conditions are met:</text>
        <paragraph num="(i)">
          <text>The maximum interval is determined under a risk-based inspection program; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The AST has one or more of the leak prevention, detection, corrosion mitigation, or containment safeguards listed in Table 6.1–Tank Safeguard in API Standard 653 “Tank Inspection, Repair, Alteration, and Reconstruction”;</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Complete an initial internal inspection on an existing field-erected AST that contains oil not later than 2 years after June 13, 2022;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Complete subsequent internal inspections on a new or existing field-erected AST not later than:</text>
      <paragraph num="(a)">
        <text>20 years after the date the initial internal inspection required in §H(2) or (3) of this regulation was completed; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>A maximum inspection interval determined in accordance with the corrosion rate procedures and the additional risk-based inspection requirements in API Standard 653 “Tank Inspection, Repair, Alteration, and Reconstruction”;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>An internal inspection of a field-erected AST includes:</text>
      <paragraph num="(a)">
        <text>An evaluation of, at a minimum, 75 percent of the storage tank bottom plates using magnetic flux leakage scanning;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>An evaluation of 100 percent of floor plate welds and shell-to-floor welds using one or more of the following testing methods:</text>
        <paragraph num="(i)">
          <text>Vacuum box;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Magnetic particle; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Liquid penetrant;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(c)">
        <text>Verification of a storage tank bottom’s integrity to ensure the storage tank bottom is not severely corroded or there is evidence of a spill, release, or discharge;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>The collection of data necessary to assess the minimum storage tank bottom and shell thickness, including evaluating data from previous inspections;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Identification and evaluation of any storage tank bottom settlement; and</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Assessment of all external and internal aspects of an AST while the storage tank is out-of-service, including an examination and test of the following AST components:</text>
        <paragraph num="(i)">
          <text>Storage tank exterior and interior;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Storage tank bottom, including the liquid side and soil side;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Shell seams, plates, and overflows;</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>The fixed roof interior, including the surface, support structure, and appurtenances;</text>
        </paragraph>
        <paragraph num="(v)">
          <text>A floating roof, including the deck, pontoons, cutouts and supports, seal assemblies, and appurtenances;</text>
        </paragraph>
        <paragraph num="(vi)">
          <text>Common AST appurtenances; and</text>
        </paragraph>
        <paragraph num="(vii)">
          <text>Access structures;</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(6)">
      <text>At a minimum, an authorized inspector conducting an internal inspection of an AST shall complete the Tank Out-of-service Inspection Checklist in Annex C of API Standard 653 “Tank Inspection, Repair, Alteration, and Reconstruction” in addition to other forms used;</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Submit a copy of the final internal inspection report to the Department within 60 days of completing the internal inspection; and</text>
    </paragraph>
    <paragraph num="(8)">
      <text>Maintain records of each internal inspection conducted for on a field-erected AST in accordance with Regulation .13 of this chapter.</text>