<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".12" citation="COMAR 26.10.18.12" title_num="26" subtitle_num="10" chapter_num="18" heading="Out-of-Service and Permanent Closure.">
  <paragraph num="A.">
    <text>Out-of-Service. An owner, an operator, and a person in charge of an AST system with a field-erected AST shall complete each of the following steps to place the AST system out-of-service:</text>
    <paragraph num="(1)">
      <text>Notify the Department in writing 30 days before placing the AST system out-of-service;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Remove all oil from the AST system;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Isolate all piping connected to the AST;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Remove all waste materials from the AST system, including storage tank-bottom sludge, and dispose of these materials in compliance with applicable federal, State, and local laws;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Purge all petroleum vapors and maintain the AST system vapor free;</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Secure the AST system to prevent unauthorized entrance or tampering;</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Protect the AST system from flotation;</text>
    </paragraph>
    <paragraph num="(8)">
      <text>Continue the operation and maintenance of corrosion protection on the AST system in accordance with Regulation .09 of this chapter;</text>
    </paragraph>
    <paragraph num="(9)">
      <text>Lock the fill port; and</text>
    </paragraph>
    <paragraph num="(10)">
      <text>Label the AST using lettering at least 3 inches high, in a readily visible location on the AST, with the following information:</text>
      <paragraph num="(a)">
        <text>Date the AST system was placed out-of-service;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Name of product last stored; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The words “OUT-OF-SERVICE” or “EMPTY”.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Return to In-Service. An owner, an operator, and a person in charge of an out-of-service AST system with a field-erected AST shall complete the following steps prior to placing the AST system in-service:</text>
    <paragraph num="(1)">
      <text>Notify the Department in writing 30 days before placing the AST system in-service;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>If an external or internal inspection required under Regulation .11 of this chapter was due to occur while the AST system was out of service, conduct the external or internal inspection of the AST system in accordance with the inspection procedures in Regulation .11F or H of this chapter.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Test all connected piping and appurtenances to ensure a spill, release, or discharge will not occur; and</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Maintain a copy of all corrosion protection system and formal inspection and testing reports, including the findings of inspections and tests and repairs performed, and provide a copy to the Department upon request.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Permanent Closure. An owner, an operator, and a person in charge of an AST system with a field-erected AST shall permanently close the AST system in accordance with the following requirements:</text>
    <paragraph num="(1)">
      <text>At least 30 days before permanently closing the AST system:</text>
      <paragraph num="(a)">
        <text>Notify the Department in writing of the planned AST system permanent closure; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Submit to the Department for approval a proposed sampling plan for a site assessment to determine if there is evidence of a spill, release, or discharge where contamination is most likely to be present, including sampling of, at a minimum, the following areas of the AST site:</text>
        <paragraph num="(i)">
          <text>Within and immediately outside of the secondary containment dike, if present;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Within the footprint of the removed AST; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Beneath underground piping associated with the removed AST;</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Place the AST system out-of-service in accordance with §A of this regulation;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Disconnect and remove all aboveground piping associated with the AST system;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Disconnect and remove all underground piping associated with the AST system:</text>
      <paragraph num="(a)">
        <text>Under the continuous on-site presence and direction of a certified UST system technician or remover; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>In accordance with the procedures in COMAR 26.10.10.02D;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>Remove the AST and associated piping from the site; and</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Within 45 days of completing the permanent closure and approved site assessment, submit a closure report to the Department detailing:</text>
      <paragraph num="(a)">
        <text>The AST closure activities; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The results of the sampling event, including a map identifying sample locations, laboratory results, summary of findings, and conclusions.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Change-in-Service. An owner, an operator, and a person in charge of an AST system with a field-erected AST placing the AST system out-of-service in order to store a non-oil product shall:</text>
    <paragraph num="(1)">
      <text>Notify the Department in writing at least 30 days before placing the AST system out-of-service; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Place the AST system out-of-service in accordance with the requirements of the Department.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>Upon completing an out-of-service activity specified §§A—D of this regulation, an owner, an operator, and a person in charge of an AST system with a field-erected AST shall:</text>
    <paragraph num="(1)">
      <text>Within 30 days, amend the AST system registration with the Department in accordance with COMAR 26.10.01.10; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>If the oil storage facility or oil handling facility is required under COMAR 26.10.01.09 to be operated under an Individual Oil Operation Permit, submit a request to modify the Individual Oil Operations Permit in accordance with COMAR 26.10.01.12.</text>
    </paragraph>
  </paragraph>