<regulation prefix="Regulation" num=".16" citation="COMAR 26.11.19.16" title_num="26" subtitle_num="11" chapter_num="19" heading="Control of VOC Equipment Leaks.">
  <paragraph num="A.">
    <text>Definitions. In this regulation, the following terms have the meanings indicated:</text>
    <paragraph num="(1)">
      <text>“Component” means equipment which has the potential to leak VOC, including process equipment, storage tanks, pumps, compressors, valves, flanges and other pipeline fittings, pressure relief valves, process drains, and open-ended pipes.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>“Leak” means an unintended liquid or vapor release of VOC from a component into the ambient air or into a building.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Applicability. A person subject to any VOC emission standard or limitation established in this chapter and not otherwise subject to more specific VOC leak requirements of another regulation is subject to the requirements of this regulation.</text>
  </paragraph>
  <paragraph num="C.">
    <text>General Requirements. A person subject to this regulation shall comply with all of the following requirements:</text>
    <paragraph num="(1)">
      <text>Visually inspect all components on the premises for leaks at least once each calendar month.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Tag any leak immediately so that the tag is clearly visible. The tag shall be made of a material that will withstand any weather or corrosive conditions to which it may be normally exposed. The tag shall bear an identification number, the date the leak was discovered, and the name of the person who discovered the leak. The tag shall remain in place until the leak has been repaired.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Take immediate action to repair all observed VOC leaks that can be repaired within 48 hours.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Repair all other leaking components not later than 15 days after the leak is discovered. If a replacement part is needed, the part shall be ordered within 3 days after discovery of the leak, and the leak shall be repaired within 48 hours after receiving the part.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Maintain a supply of components or component parts that are recognized by the source to wear or corrode, or that otherwise need to be routinely replaced, such as seals, gaskets, packing, and pipe fittings.</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Maintain a log that includes the name of the person conducting the inspection and the date on which leak inspections are made, the findings of the inspection, and a list of leaks by tag identification number. The log shall be made available to the Department upon request. Leak records shall be maintained for a period of not less than 2 years from the date of their occurrence.</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Exceptions. Components that cannot be repaired as required in this regulation because they are inaccessible, or that cannot be repaired during operation of the source, shall be identified in the log and included within the source's maintenance schedule for repair during the next source shutdown.</text>
  </paragraph>
</regulation>