<chapter num="24" heading="Vapor Recovery at Gasoline Dispensing Facilities" title_num="26" subtitle_num="11">
  <regulation prefix="Regulation" num=".01" heading="Definitions.">
    <paragraph num="A.">
      <text>In this chapter, the following terms have the meanings indicated.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Terms Defined.</text>
      <paragraph num="(1)">
        <text>“Approved Stage II vapor recovery system (approved system)” means:</text>
        <paragraph num="(a)">
          <text>A properly installed Stage II vapor recovery system for which CARB issued an Executive Order certifying the system using procedures in effect in California before April 1, 2001; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A system approved by the Department that involves certification procedures comparable to or similar to the certification procedures used by CARB and in effect in California before April 1, 2001.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>“CARB” means the California Air Resources Board.</text>
      </paragraph>
      <paragraph num="(2-1)">
        <text>“Certified Inspector” means an inspector that has been trained and certified in the Department's requirements for gasoline storage tanks and vapor recovery systems in accordance with COMAR 26.10.06.04.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>“Defective equipment” means the absence, disconnection, or malfunctioning of an approved system or part of an approved system, including:</text>
        <paragraph num="(a)">
          <text>A vapor return line that is crimped, flattened, blocked, or that has any hole or slit from which vapors may leak;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A nozzle bellows that has any hole through which a 1/4 inch diameter cylindrical rod will pass, or any slit 1 inch or more in length;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A nozzle faceplate or facecone that has 25 percent or more of its surface torn or missing;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A nozzle without an automatic overfill control mechanism or with an inoperable overfill control mechanism;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>A nozzle without a vapor check valve or with a malfunctioning vapor check valve;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Any underground equipment that is not vapor tight or any equipment that has obstructions prohibiting the flow of vapor; and</text>
        </paragraph>
        <paragraph num="(g)">
          <text>A missing, inoperable, or malfunctioning vapor processing unit, vacuum generating device, pressure or vacuum relief valve, vapor check valve, or any other component of an approved system.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>“Existing gasoline dispensing facility” means any gasoline dispensing facility that is not a “new gasoline dispensing facility” as defined in this regulation.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>“Facecone” means a component of a nozzle, located at the end of the flexible cone, that allows gasoline vapors to be collected.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>“Faceplate” means a component of a nozzle, located at the end of the nozzle bellows, that provides the vapor seal when gasoline is dispensed into a motor vehicle.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>“Gasoline dispensing facility” means a site with equipment that is used to transfer gasoline from one or more stationary storage tanks into motor vehicle fuel tanks.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>“Independent small business gasoline marketer” means an independent small business marketer of gasoline, as defined in §324 (Vapor Recovery for Small Business Marketers of Petroleum Products) of the Federal Clean Air Act.</text>
      </paragraph>
      <paragraph num="(8-1)">
        <text>“Major Modification” means:</text>
        <paragraph num="(a)">
          <text>Excavation below a shear valve or tank pad in order to repair or replace Stage II system or an underground storage tank;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Installation of a new dispenser system manufactured without a Stage II system; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A major system modification consisting of the replacement, repair or upgrade of at least 50 percent of a facility’s Stage II vapor recovery system.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(9)">
        <text>“Monthly gasoline throughput” means the average monthly amount of gasoline dispensed at a gasoline dispensing facility excluding any time period when the facility was shut down.</text>
      </paragraph>
      <paragraph num="(9-1)">
        <text>“Motor vehicle” means a vehicle registered with the Maryland Motor Vehicle Administration or the equivalent agency of another state.</text>
      </paragraph>
      <paragraph num="(10)">
        <text>“New gasoline dispensing facility” means a gasoline dispensing facility for which the Department issued or issues a permit to construct after November 15, 1990, except for a gasoline dispensing facility at which only the gasoline storage tanks were or are replaced.</text>
      </paragraph>
      <paragraph num="(11)">
        <text>“Nozzle” means the spout at the end of the gasoline hose used to dispense and control the flow of gasoline from a stationary gasoline storage tank into motor vehicle fuel tanks.</text>
      </paragraph>
      <paragraph num="(12)">
        <text>“Nozzle bellows” means a flexible component of a nozzle that is compressed to establish a seal between the nozzle faceplate and filler neck of the motor vehicle fuel tank.</text>
      </paragraph>
      <paragraph num="(13)">
        <text>“Operator” means a dealer or other person who is responsible for the daily operation and maintenance of a gasoline dispensing facility and who is subject to the inspection, training, and reporting requirements of this chapter.</text>
      </paragraph>
      <paragraph num="(14)">
        <text>Owner.</text>
        <paragraph num="(a)">
          <text>“Owner” means the person who owns a gasoline dispensing facility and who is responsible for the installation requirements, initial compliance, and periodic testing of an approved system.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Owner includes a person who:</text>
          <paragraph num="(i)">
            <text>Owns an oil storage facility or UST system, or both, used for storage, use, or dispensing of regulated substances; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Owned the UST system immediately before the discontinuation of its use.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(14-1)">
        <text>“Stage I vapor balance system” means coaxial or dual piping that creates a closed system between a tank truck and a stationary storage tank and contains the vapors during the transfer of gasoline.</text>
      </paragraph>
      <paragraph num="(15)">
        <text>“Stage II vapor recovery system” means a system at a gasoline dispensing facility that is designed, installed, and used to collect, recover, or destroy gasoline vapors displaced when gasoline is dispensed from a stationary gasoline storage tank into motor vehicle fuel tanks.</text>
      </paragraph>
      <paragraph num="(16)">
        <text>“Tag out of service” means to place out of service by use of a conspicuously located tag or sign on a nozzle that prohibits the use of any nozzle associated with defective equipment.</text>
      </paragraph>
      <paragraph num="(16-1)">
        <text>“Tank System” means a storage tank or a set of manifolded storage tanks containing gasoline.</text>
      </paragraph>
      <paragraph num="(17)">
        <text>“Vapor assist system—Type 1” means a Stage II vapor recovery system that uses:</text>
        <paragraph num="(a)">
          <text>A mechanical device and the flow of gasoline to generate a vacuum, the magnitude of which is related to the volume of gasoline; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>An electromechanical device which collects gasoline vapors displaced when gasoline is dispensed from a stationary storage tank into motor vehicle fuel tanks.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(18)">
        <text>“Vapor assist system—Type 2” means a Stage II vapor recovery system that provides vacuum from a centrally located pump for all gasoline dispensers at the facility and is initiated by a trigger in the nozzle. This system is referred to as the “Healy System”.</text>
      </paragraph>
      <paragraph num="(19)">
        <text>“Vapor balance system” means a Stage II vapor recovery system that uses the pressure generated in a vehicle tank by incoming fuel and the negative pressure in the gasoline storage tank to recover vapors displaced when gasoline is dispensed from a stationary storage tank into motor vehicle fuel tanks.</text>
      </paragraph>
      <paragraph num="(20)">
        <text>“Vapor recovery system” means a Stage II vapor recovery system at a gasoline dispensing facility and a Stage I vapor recovery system on a gasoline storage tank.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".01-1" heading="Incorporation by Reference.">
    <paragraph num="A.">
      <text>In this chapter, the following CARB approved test methods are incorporated by reference.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Test Methods Incorporated.</text>
      <paragraph num="(1)">
        <text>Vapor Recovery Test Procedure TP-201.3 Determination of 2 Inch WC Static Pressure Performance of Vapor Recovery Systems of Dispensing Facilities, amended March 17, 1999.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Vapor Recovery Test Procedure TP-201.5 Determination (By Volume Meter) of Air to Liquid Volume Ratio of Vapor Recovery Systems of Dispensing Facilities, adopted April 12, 1996.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Vapor Recovery Test Procedures TP-201.4 Determination of Dynamic Pressure Performance of Vapor Recovery Systems of Dispensing Facilities, amended April 28, 2000.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Executive Order G-70-186, Exhibit 4, Vapor Return Line Vacuum Integrity Test for the Healy Model 400 ORVR System.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Executive Order G-70-165, Exhibit 4, Vapor Return Line Vacuum Integrity Test for the Healy Model 600 System.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Leak Rate and Cracking Pressure of Pressure/Vacuum Valves TP-201.1E.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Determination of Vapor Piping Connections to Underground Gasoline Storage Tanks (Tie-Tank Test) TP-201.3C (1999).</text>
      </paragraph>
      <paragraph num="(8)">
        <text>“Recommended Practices for Installation and Testing of Vapor Recovery Systems at Vehicle Refueling Sites” of the Petroleum Equipment Institute, Section 14, 2009.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Applicability, Exemptions, and Effective Date.">
    <paragraph num="A.">
      <text>This chapter applies in Baltimore City and Anne Arundel, Baltimore, Calvert, Carroll, Cecil, Charles, Frederick, Harford, Howard, Montgomery, and Prince George's counties.</text>
    </paragraph>
    <paragraph num="B.">
      <text>A gasoline dispensing facility exempted under §C of this regulation is subject only to the record-keeping and reporting requirements of Regulation .07D of this chapter.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The provisions of this chapter do not apply to:</text>
      <paragraph num="(1)">
        <text>The owner or operator of an existing gasoline dispensing facility whose average monthly gasoline throughput during calendar years 1990 and 1991 was less than 10,000 gallons;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The owner or operator of any new gasoline dispensing facility that has a total gasoline storage tank capacity of less than 2,000 gallons; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>An existing independent small business gasoline marketer whose average monthly gasoline throughput during calendar years 1990 and 1991 was less than 50,000 gallons.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>If a person purchases a gasoline dispensing facility equipped with an approved system, the new owner or operator shall continue to operate the approved system unless the average monthly gasoline throughput during any calendar year after the purchase is less than 10,000 gallons.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="General Requirements.">
    <paragraph num="A.">
      <text>New Gasoline Dispensing Facilities. An owner or operator of a new gasoline dispensing facility may not operate the gasoline dispensing facility unless it is equipped and operated with an approved system.</text>
    </paragraph>
    <paragraph num="A-1.">
      <text>Newly Constructed Gasoline Dispensing Facilities. Notwithstanding §A of this regulation, an owner or operator of a gasoline dispensing facility constructed on or after the effective date of this regulation may operate the gasoline dispensing facility without installing and operating a Stage II vapor recovery system.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Existing Gasoline Dispensing Facilities. Except as provided in §§A-1 and C of this regulation and Regulation .03-1A of this chapter, an owner or operator of an existing gasoline dispensing facility may not operate that gasoline dispensing facility after the following dates, unless it is equipped and operated with an approved system:</text>
      <paragraph num="(1)">
        <text>November 15, 1993, if the monthly gasoline throughput during calendar years 1990 and 1991 was 100,000 gallons or more; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>November 15, 1994, if the monthly gasoline throughput during calendar years 1990 and 1991 was less than 100,000 gallons.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Existing Independent Small Business Gasoline Marketers. After the dates listed below, an existing independent small business gasoline marketer may not operate a gasoline dispensing facility unless it is equipped and operated with an approved system:</text>
      <paragraph num="(1)">
        <text>November 15, 1994, for an independent small business gasoline marketer with one or two facilities; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>November 15, 1995, for an independent small business gasoline marketer with three or more facilities, if at least 1/3 of the facilities are equipped and operated with an approved system by November 15, 1993 and at least 2/3 of the facilities are equipped and operated with an approved system by November 15, 1994.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>If an owner of an existing gasoline dispensing facility subject to this chapter replaces a gasoline storage tank after November 15, 1990, the owner shall install all underground piping required by this chapter and perform a leak and liquid blockage test.</text>
    </paragraph>
    <paragraph num="E.">
      <text>After the applicable dates established in §§A—C of this regulation, an operator may not use or allow the use of defective equipment associated with the transfer of gasoline from a stationary gasoline storage tank to motor vehicle fuel tanks.</text>
    </paragraph>
    <paragraph num="F.">
      <text>The operator may not install or use a replacement part in an approved system unless that part has been certified by CARB or approved by the Department for the approved system.</text>
    </paragraph>
    <paragraph num="G.">
      <text>The owner shall ensure that all underground piping is installed in accordance with the Department's requirements related to underground storage tanks, which are set forth in COMAR 26.10.03.</text>
    </paragraph>
    <paragraph num="H.">
      <text>Gasoline storage tanks serving a gasoline dispensing facility that is subject to this chapter shall be equipped with a properly designed and installed pressure and vacuum valve with minimum pressure and vacuum settings as specified in the CARB Executive Order for that system.</text>
    </paragraph>
    <paragraph num="I.">
      <text>If an approved system is certified under more than one Executive Order, the most recent Executive Order shall apply.</text>
    </paragraph>
    <paragraph num="J.">
      <text>Stage I Vapor Recovery. An owner or operator of a gasoline tank truck or an owner or operator of a gasoline dispensing facility subject to this regulation may not cause or permit gasoline to be loaded into a stationary tank unless the loading system is equipped with a Stage I vapor balance system that is properly installed, maintained, and operated.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03-1" heading="Decommissioning of the Stage II Vapor Recovery System.">
    <paragraph num="A.">
      <text>Notwithstanding Regulation .03A of this chapter, an owner or operator of a gasoline dispensing facility or system of gasoline dispensing facilities that installed approved Stage II vapor recovery systems:</text>
      <paragraph num="(1)">
        <text>May decommission Stage II vapor recovery systems in accordance with §B of this regulation after October 1, 2016; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>May decommission Stage II vapor recovery systems in accordance with §B of this regulation where a gasoline dispensing facility undergoes a major modification after the effective date of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>An owner or operator of a gasoline dispensing facility that decommissions a Stage II vapor recovery system shall perform the decommissioning of the Stage II vapor recovery system in accordance with the “Recommended Practices for Installation and Testing of Vapor Recovery Systems at Vehicle Refueling Sites” of the Petroleum Equipment Institute, Section 14, 2009 and COMAR 26.10.10.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Testing Requirements.">
    <paragraph num="A.">
      <text>Testing Requirements for Stage II Stations. Except as provided in §§E and F of this regulation, an owner or operator of a gasoline dispensing facility subject to this chapter which operates Stage II Vapor Recovery systems shall perform the following CARB-approved tests.</text>
      <paragraph num="(1)">
        <text>A leak test in accordance with the Vapor Recovery Test Procedure TP-201.3 referenced in Regulation .01-1B(1) of this chapter;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>An air to liquid volume ratio test in accordance with the Vapor Recovery Test Procedure TP-201.5 referenced in Regulation .01-1B(2) of this chapter.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A dynamic pressure performance test in accordance with the Vapor Recovery Test Procedure TP-201.4 referenced in Regulation .01-1B(3) of this chapter;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>A vapor return line vacuum integrity test for the Healy Model 400 ORVR System in accordance with Executive Order G-70-186, Exhibit 4 referenced in Regulation .01-1B(4) of this chapter; and</text>
      </paragraph>
      <paragraph num="(5)">
        <text>A vapor return line vacuum integrity test for the Healy Model 600 System in accordance with Executive Order G-70-165 Exhibit 4 referenced in Regulation .01-1B(5) of this chapter.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>A leak rate and cracking pressure test in accordance with TP-201.1E referenced in Regulation .01-1B(6).</text>
      </paragraph>
      <paragraph num="(7)">
        <text>A tie tank test in accordance with TP-201.3C as referenced in Regulation .01-1B(7).</text>
      </paragraph>
    </paragraph>
    <paragraph num="A-1.">
      <text>Testing Requirements for Decommissioned Stations and New Stations Installed after the effective date of this regulation that did not Install Stage II. Except as provided in §§E and F of this regulation, an owner or operator of a gasoline dispensing facility subject to this chapter who does not operate a Stage II Vapor Recovery system shall perform the testing requirements of §A(1), (6), and (7) of this regulation as specified in §C(2) of this regulation and repeat annually.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The leak and liquid blockage tests required in §A of this regulation shall be performed on each approved system before the gasoline dispensing facility is initially used to refuel motor vehicles, or by the applicable dates in Regulation .03 of this chapter, whichever occurs later.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Stage II Vapor Recovery System.</text>
      <paragraph num="(1)">
        <text>An owner of a Stage II vapor recovery system subject to this chapter shall repeat the required tests:</text>
        <paragraph num="(a)">
          <text>In accordance with the test schedule in §C(2) of this regulation; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Upon replacement of 75 percent or more of an approved system.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Test Schedule.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>If a gasoline dispensing facility fails any test required by this chapter, the owner shall notify the Department of the failure in writing within 5 working days after the test and before retesting.</text>
    </paragraph>
    <paragraph num="E.">
      <text>Alternative test methods approved by CARB may be used in place of the test methods specified in §A of this regulation, if the alternative test methods are approved by the U.S. Environmental Protection Agency (EPA) as a revision to the State Implementation Plan, which is Maryland's plan for meeting the National Ambient Air Quality Standards.</text>
    </paragraph>
    <paragraph num="F.">
      <text>Test methods and the frequency of testing required by this regulation may be modified for vapor assist systems, if the test methods and testing frequency are approved by the Department and the EPA.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Inspection Requirements.">
    <paragraph num="A.">
      <text>An operator subject to this chapter shall ensure that each approved system is inspected at least once each day of operation to verify that it is working properly.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Except as provided in §C of this regulation, the Department shall consider an operator of a gasoline dispensing facility to be in violation of Regulation .03E of this chapter during any period of time that the facility is operated while there is defective equipment at the facility.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The operator is not in violation of Regulation .03E of this chapter during any period of time for which the operator establishes, to the satisfaction of the Department, that nozzles associated with defective equipment were tagged out of service and that no nozzle associated with the defective equipment was actually used.</text>
    </paragraph>
    <paragraph num="D.">
      <text>For defective equipment that was identified by the Department, the operator shall inform the Department by telephone within 72 hours after the repair or replacement of the defective equipment.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05-1" heading="Inspections by a Certified Inspector.">
    <paragraph num="A.">
      <text>Operator Requirements.</text>
      <paragraph num="(1)">
        <text>A person that operates a gasoline dispensing facility or a gasoline storage tank with a vapor recovery system shall ensure that a certified inspector performs an inspection of each vapor recovery system.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Each vapor recovery system shall be inspected by a certified inspector in accordance with the schedules set forth in COMAR 26.10.03.10.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Inspection Requirements.</text>
      <paragraph num="(1)">
        <text>The certified inspector shall inspect each vapor recovery system to confirm that:</text>
        <paragraph num="(a)">
          <text>All the necessary equipment has been installed;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The equipment is functioning properly; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>There is no defective equipment in use.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The certified inspector shall review the facility files to confirm that:</text>
        <paragraph num="(a)">
          <text>All testing required by this chapter has been completed;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The operator has performed daily inspections of the Stage II equipment;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The records required by this chapter are complete and maintained onsite; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>All other requirements of this chapter are being met.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The certified inspector shall complete an inspection form provided by the Department and submit the completed form to the Department within 30 days after completing the inspection.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Training Requirements for Operation and Maintenance of Approved Systems.">
    <paragraph num="A.">
      <text>General. An operator shall ensure that:</text>
      <paragraph num="(1)">
        <text>At least one employee at each facility subject to this regulation is trained in accordance with the requirements of §B of this regulation; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The trained employee assists in the training of each of the other employees at that facility who are involved in the operation or maintenance of the approved system.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Approved Training Course Contents and Duration.</text>
      <paragraph num="(1)">
        <text>An approved training course shall contain, at a minimum, a discussion of the following:</text>
        <paragraph num="(a)">
          <text>Purposes and effects of Stage II vapor recovery;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Stage II vapor recovery equipment design, function, operation, and maintenance;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Daily inspection requirements and development and maintenance of records and files; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Equipment warranties and spare parts.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The approved training course shall be of a duration sufficient to properly train persons in the requirements of this chapter.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Record-Keeping and Reporting Requirements.">
    <paragraph num="A.">
      <text>An operator subject to this chapter shall create and maintain a record file at the facility.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The record file shall contain copies of all test reports, permits, violation notices, correspondence with the Department, equipment maintenance records, training records, and other information pertinent to the requirements of this chapter. Verification of training shall be maintained in the facility file. Equipment maintenance records required under this chapter shall be maintained for at least 2 years. All other records shall be maintained for at least 5 years.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The equipment maintenance records shall include:</text>
      <paragraph num="(1)">
        <text>The date on which defective equipment was found, a description of each defect, a description of the corrective action and the date on which the defect was corrected, and the probable cause of the defect;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>If parts are replaced, the location within the approved system of the part, the part number, and assurance that the replacement part does not degrade the efficiency of the system; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Inspection reports and any other information relating to maintenance or care of the approved system.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>An owner or operator of a gasoline dispensing facility exempted according to Regulation .02C of this chapter shall create and maintain records on gasoline throughput and tank sizes and make the records available to the Department on request.</text>
    </paragraph>
    <paragraph num="E.">
      <text>The following reporting requirements apply to any test required under this chapter:</text>
      <paragraph num="(1)">
        <text>The Department shall be notified 5 days before a test is to be conducted;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A test protocol shall be available at the test site during testing;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Copies of all test results shall be forwarded to the Department within 30 days of the test; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Test failures shall be reported to the Department in writing within 5 days following the date of the failure.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".08" heading="Instructional Signs.">
    <paragraph num="A.">
      <text>An operator who is subject to this chapter shall place instructional signs in conspicuous locations at each gasoline dispenser.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The instructional signs shall include:</text>
      <paragraph num="(1)">
        <text>Instructions, with illustrations, on how to insert the nozzle, dispense gasoline, and how to remove the nozzle;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A warning against attempts to continue refueling after automatic shut-off of the gasoline (that is, topping off); and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Department's toll-free telephone number which may be used for complaints or comments concerning the use of Stage II vapor recovery systems.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".09" heading="Sanctions.">
    <paragraph num="A.">
      <text>A person who violates any provision of this chapter is subject to the sanctions set forth in Environment Article, Title 2, Annotated Code of Maryland. Each day of violation constitutes a separate violation. These sanctions in the Annotated Code of Maryland include:</text>
      <paragraph num="(1)">
        <text>Injunctive relief under Environment Article, §2-609;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Judicial penalties up to $25,000 per violation under Environment Article, §2-610;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Administrative penalties up to $2,500 per violation, limited to $50,000 per administrative action, under Environment Article, §2-610.1; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Criminal penalties for knowing violations under Environment Article, §2-609.1.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>After this chapter is approved by EPA as an amendment to the State Implementation Plan, a person who violates any provision of this chapter may be subject to federal enforcement action.</text>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Environment Article, §§1-101, 1-404, 2-101—2-103, 2-301—2-303, 10-102, and 10-103, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: February 15, 1993 (20:3 Md. R. 260)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01B amended effective June 20, 1994 (21:12 Md. R. 1064); May 8, 1995 (22:9 Md. R. 647); April 15, 2002 (29:7 Md. R. 623); January 29, 2007 (34:2 Md. R. 139); November 23, 2015 (42:23 Md. R. 1435)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-1 adopted effective April 15, 2002 (29:7 Md. R. 623)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .01-1B amended effective November 23, 2015 (42:23 Md. R. 1435)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02 amended effective April 15, 2002 (29:7 Md. R. 623)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02E, F repealed effective November 23, 2015 (42:23 Md. R. 1435)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03 amended effective April 15, 2002 (29:7 Md. R. 623); November 23, 2015 (42:23 Md. R. 1435)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03-1 adopted effective November 23, 2015 (42:23 Md. R. 1435)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .04 amended effective April 15, 2002 (29:7 Md. R. 623); February 28, 2005 (32:4 Md. R. 411); November 23, 2015 (42:23 Md. R. 1435)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .05-1 adopted effective January 29, 2007 (34:2 Md. R. 139)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07 amended effective April 15, 2002 (29:7 Md. R. 623)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07E amended effective February 28, 2005 (32:4 Md. R. 411); November 23, 2015 (42:23 Md. R. 1435)</annotation>
  </annotations>
</chapter>