<regulation prefix="Regulation" num=".03" citation="COMAR 26.11.30.03" title_num="26" subtitle_num="11" chapter_num="30" heading="Definitions.">
  <paragraph num="A.">
    <text>In this chapter, the following terms have the meanings indicated.</text>
  </paragraph>
  <paragraph num="B.">
    <text>Terms Defined.</text>
    <paragraph num="(1)">
      <text>“Cement kiln” means an installation, including any associated pre-heater or pre-calciner devices, that produces clinker by heating limestone and other materials to produce Portland cement.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>“Cement manufacturing installation” means process equipment used for subsequent production of Portland cement.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>“Clinker cooler” means an installation into which clinker product leaving the kiln is placed to be cooled by air supplied by a forced air draft or natural draft supply system.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>“Long dry kiln” means a cement kiln that does not have a pre-calciner and in which dry starting raw materials are fed into the kiln.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>“PM continuous parametric monitoring system” (CPMS) means a continuous emission monitoring system used to establish a parameter range for the purposes of demonstrating compliance.</text>
    </paragraph>
    <paragraph num="(6)">
      <text>“Pre-calciner kiln” means a cement kiln that contains a pre-calciner at the bottom of the pre-heater tower before the materials enter the kiln.</text>
    </paragraph>
    <paragraph num="(7)">
      <text>“30-day rolling average” means the arithmetic average of all valid hourly NOx emission rates of the previous 720 valid hours on a rolling basis.</text>
    </paragraph>
    <paragraph num="(8)">
      <text>“30 process operating day” means:</text>
      <paragraph num="(a)">
        <text>The first day after the compliance date following completion of the field testing and data collection that demonstrates that the CPMS or CEMS has satisfied the relevant CPMS performance evaluation or CEMS performance specification acceptance criteria; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>For purposes of this chapter, the performance test period is complete at the end of the 30th consecutive operating day.</text>
      </paragraph>
    </paragraph>
  </paragraph>
</regulation>