<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".05-1" citation="COMAR 26.13.03.05-1" title_num="26" subtitle_num="13" chapter_num="03" heading="Closure Requirements — Hazardous Waste Accumulation Areas and Waste Management Units.">
  <paragraph num="A.">
    <text>Purpose and Scope. This regulation:</text>
    <paragraph num="(1)">
      <text>Establishes requirements with which a hazardous waste generator must comply in connection with the permanent removal from service, for the purposes of hazardous waste management, of:</text>
      <paragraph num="(a)">
        <text>An area in which hazardous waste was accumulated in a manner that was subject to the requirements of this chapter, other than accumulation in a satellite accumulation area;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>A waste management unit, such as a tank, used to manage hazardous waste in an accumulation area described in §A(1)(a) of this regulation; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>A site or facility that had an area or waste management unit of the type described in §A(1)(a) or (b) of this regulation;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Establishes a general closure performance standard that a hazardous waste generator must meet for all hazardous waste accumulation areas and hazardous waste management units identified in §A(1) of this regulation;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Identifies specific requirements that must be met in implementing closure, including requirements:</text>
      <paragraph num="(a)">
        <text>That apply to all types of accumulation units; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Specific to particular types of accumulation units; and</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Identifies:</text>
      <paragraph num="(a)">
        <text>Record keeping requirements with respect to closure; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Closure notification requirements that apply to a generator who qualified as a federally-defined large quantity generator for significant periods of time.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Closure Requirements.</text>
    <paragraph num="(1)">
      <text>Applicability. The general closure performance standard and other requirements of this section:</text>
      <paragraph num="(a)">
        <text>Apply to an area or waste management unit in which hazardous waste was managed, as described in §A(1)(a) of this regulation; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Apply to a site or facility that had an area or waste management unit identified in §A(1)(a) of this regulation and at which the generator:</text>
        <paragraph num="(i)">
          <text>Will no longer be generating or accumulating hazardous waste; or</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Is ceasing operations entirely;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(c)">
        <text>May be deferred for an accumulation area or unit if the generator anticipates that the area or unit may again be used to accumulate hazardous waste, if the:</text>
        <paragraph num="(i)">
          <text>Notification requirements of Regulation .05-2 of this chapter are met; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Closure performance standard and other requirements of this section are met before the facility is closed.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>General Closure Performance Standard. A generator shall ensure that, if a hazardous waste accumulation area, a hazardous waste management unit, or a facility or site at which hazardous waste was generated or accumulated is closed by being permanently removed from service for the purposes of hazardous waste management:</text>
      <paragraph num="(a)">
        <text>The closure is conducted in a manner that minimizes the need for further maintenance by controlling, minimizing, or eliminating, to the extent necessary to protect human health and the environment, the post-closure escape of hazardous waste, hazardous constituents, leachate, contaminated runoff, or hazardous waste decomposition products to the ground, to ground water, to surface water, or to the atmosphere; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Any hazardous waste that is generated in closing the generator’s facility or a portion of the facility is managed in accordance with all applicable requirements of:</text>
        <paragraph num="(i)">
          <text>This chapter, including, for hazardous waste that is being accumulated in a unit that is being closed, accumulation time limits of Regulation .03-4C of this chapter;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Chapters .04 and .06 of this subtitle; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>40 CFR Part 268.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Additional Unit-specific Closure Requirements for Container, Tank System, and Containment Building Accumulation Units. For the closure of a hazardous waste accumulation unit in which hazardous waste was managed in a container, a tank system, or a containment building:</text>
      <paragraph num="(a)">
        <text>The generator shall ensure that closure of the unit provides, to the extent necessary to meet the general closure performance standard of §B(2) of this regulation, for the removal or decontamination of:</text>
        <paragraph num="(i)">
          <text>All contaminated equipment, structures, and soil, and any remaining hazardous waste residues from waste accumulation units, including containment system components such as pads or liners;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Contaminated soils, subsoils, bases, and structures; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Structures and equipment contaminated with waste; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>If the generator is unable to practicably remove or decontaminate contaminated soils or wastes as required by §B(3)(a) of this regulation, then the waste accumulation unit is considered to be a landfill for the purposes of closure, post-closure, and financial responsibility, and the generator shall:</text>
        <paragraph num="(i)">
          <text>Close the waste accumulation unit and perform post-closure care in accordance with the closure and post-closure requirements of COMAR 26.13.05.14J, which apply to landfills;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Meet all of the requirements for landfills specified in COMAR 26.13.05.07 and 26.13.05.08; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Submit a complete and sufficient application to the Department for a CHS post-closure permit in accordance with a deadline to be specified by the Department.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Unit Specific Closure Requirements for Drip Pads. At the closure of a drip pad waste accumulation unit, as defined in COMAR 26.13.01.03B, the generator shall:</text>
      <paragraph num="(a)">
        <text>Comply with the closure requirements of COMAR 26.13.05.17-4A—C; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>If required to close the facility and provide post-closure care as a landfill, in accordance with COMAR 26.13.05.17—4B, submit a complete and sufficient application to the Department for a CHS post-closure permit in accordance with a deadline to be specified by the Department.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>Closure Plan. A generator who is closing a waste accumulation area, waste accumulation unit, or facility under this regulation shall:</text>
      <paragraph num="(a)">
        <text>Perform the closure in accordance with a written closure plan;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Ensure that the closure plan includes:</text>
        <paragraph num="(i)">
          <text>A description of how the requirements of §B(2)—(4) of this regulation will be met in performing the closure, taking into account the nature of facility operations and the history of any spills or releases of hazardous wastes;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>A detailed description of the steps needed to remove or decontaminate all hazardous waste residues and contaminated containment system components, equipment, structures, and soils during closure, including, but not limited to, procedures for cleaning equipment and removing contaminated soils, methods for testing surrounding soils, and criteria for determining the extent of decontamination required to satisfy the closure performance standard; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>A detailed description of other activities necessary during the closure to ensure that closure activities satisfy the closure performance standard, including, but not limited to, groundwater monitoring, and run-on and runoff control; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(c)">
        <text>For each implemented closure action:</text>
        <paragraph num="(i)">
          <text>Maintain, as part of the generator’s facility operating record, a copy of the written closure plan that was followed in implementing the closure;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Make a copy of the written closure plan available to the Department on request; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Retain a copy of the written closure plan for a period of 3 years following the date of final closure of the facility.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </paragraph>
</regulation>