<regulation prefix="Regulation" num=".11" citation="COMAR 26.13.05.11" title_num="26" subtitle_num="13" chapter_num="05" heading="Surface Impoundments.">
  <paragraph num="A.">
    <text>Applicability. This regulation applies to owners and operators of facilities that use surface impoundments to treat, store, or dispose of hazardous waste, except as Regulation .01 of this chapter otherwise provides.</text>
  </paragraph>
  <paragraph num="B.">
    <text>General Design Requirements.</text>
    <paragraph num="(1)">
      <text>A surface impoundment shall be designed to provide:</text>
      <paragraph num="(a)">
        <text>At least 60 centimeters (2 feet) of freeboard; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>An amount of freeboard other than 60 centimeters based on documentation acceptable to the Secretary that the specified amount of the freeboard will prevent overtopping. The amount of freeboard approved by the Secretary shall be specified in the permit.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>A surface impoundment shall be designed so that any flow of waste into the impoundment can be immediately shut off in the event of overtopping or liner failure.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>A surface impoundment shall be designed to prevent discharge into the land and ground water, and to surface water, except for discharges authorized by a State discharge permit, during the life of the impoundment by use of a containment system which complies with §D of this regulation. The Secretary shall include the design of the containment system as a term and condition of the permit.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Dikes shall be designed with sufficient structural integrity to prevent massive failure without dependence on any liner system included in the surface impoundment design.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>For a surface impoundment, except for an existing portion of a surface impoundment, a leachate detection, collection, and removal system shall be designed so that liquid will flow freely from the collection system to prevent the creation of pressure head within the collection system in excess of that necessary to cause the liquid to flow freely.</text>
    </paragraph>
    <paragraph num="(6)">
      <text>The Secretary:</text>
      <paragraph num="(a)">
        <text>May exempt the owner or operator from the requirements of §B(3)of this regulation if the Secretary finds, based on a demonstration by the owner or operator, that alternate design and operating practices, together with location characteristics, will prevent the migration of the hazardous constituents, as identified in Regulation .06-1B of this chapter, into the ground water or surface water at any future time; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Shall, in deciding whether to grant an exemption, consider:</text>
        <paragraph num="(i)">
          <text>The nature and quantity of the wastes;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The proposed alternate design and operation;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>The hydrogeologic setting of the facility, including the attenuative capacity and thickness of the liners and soils present between the impoundment and ground water or surface water; and</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>All other factors which would influence the quality and mobility of the leachate produced and the potential for it to migrate to ground water or surface water.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(7)">
      <text>Any facility or facility unit subject to this regulation shall be constructed and installed as designed.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>General Operating Requirements.</text>
    <paragraph num="(1)">
      <text>A surface impoundment shall be operated to prevent any overtopping due to wind and wave action, overfilling precipitation, or normal or abnormal operations, malfunction of level controllers, alarms, and other equipment, or human error.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>A surface impoundment shall maintain enough freeboard to prevent any overtopping of the dike by overfilling, wave action, malfunctions of level controllers, alarms, and other equipment, human error, or a storm. There shall be at least 60 centimeters (2 feet) of freeboard.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>A surface impoundment shall be operated to maintain at least the amount of freeboard specified by the Secretary in the permit.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>For a surface impoundment, except for an existing portion of a surface impoundment, a leachate detection, collection, and removal system installed to comply with §D, of this regulation, shall be operated so that leachate flows freely from the collection system and is removed as it accumulates or with sufficient frequency to prevent backwater within the collection system.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Earthen dikes shall be kept free of:</text>
      <paragraph num="(a)">
        <text>Perennial woody plants with root systems which could displace the earthen materials upon which the structural integrity of the dike is dependent; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Burrowing mammals which could remove earthen materials upon which the structural integrity of the dike is dependent or create leaks through burrows in the dike.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(6)">
      <text>Run-on shall be diverted away from a surface impoundment.</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Containment Systems.</text>
    <paragraph num="(1)">
      <text>Earthen dikes shall have a protective cover, such as grass, shale, or rock, to minimize wind and water erosion and to preserve the structural integrity of the dike.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The owner or operator of a surface impoundment, except for an existing portion of a surface impoundment or a surface impoundment covered by COMAR 26.13.06.19D(1) and (2), shall construct a liner system designed to prevent discharge into the land during the life of the surface impoundment:</text>
      <paragraph num="(a)">
        <text>With:</text>
        <paragraph num="(i)">
          <text>A highly impermeable liner system in contact with the waste which will prevent the discharge of the waste or leachate into the liner or liners during the life of the surface impoundment based on the liner or liners' thickness, the saturated permeability of the liner or liners, and the pressure head of waste or leachate to which the liner or liners will be exposed; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>A leachate detection, collection, and removal system beneath the liner or liners in contact with the waste to detect, contain, collect, and remove any discharge from the liner system in contact with the waste; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>Above the water table, which may be controlled to comply with this requirement, to ensure the detection of any discharge of waste or leachate through the liner system in contact with the waste, prevent the discharge of ground water to the leachate detection, collection, and removal system, and to preserve the structural integrity of the liner or liners.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>A highly impermeable liner beneath the drainage layer (for example, the bottom liner) is a necessary part of a leachate detection, collection, and removal system.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>The owner or operator of each new surface impoundment, each new surface impoundment unit at an existing facility, each replacement of an existing surface impoundment unit, and each lateral expansion of an existing surface impoundment unit shall install a liner system consisting of two or more liners and a leachate collection and removal system between the liners, subject to the following:</text>
      <paragraph num="(a)">
        <text>The liners and leachate collection system shall protect human health and the environment;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The requirements of this section shall apply with respect to all waste received after the issuance of the permit;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The liner system shall include:</text>
        <paragraph num="(i)">
          <text>A top liner designed, operated, and constructed of materials to prevent the migration of any constituent into the liner during the period the facility remains in operation, including any post-closure monitoring period; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>A composite lower liner that meets the requirements of §D(4)(d) of this regulation;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(d)">
        <text>The composite lower liner required by §D(4)(c)(ii) of this regulation shall meet the following requirements:</text>
        <paragraph num="(i)">
          <text>Be designed, operated, and constructed to prevent the migration of any constituent through the liner during the period of facility operation and post-closure care;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Consist of at least two components;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Include an upper component that is designed and constructed of materials to prevent the migration of hazardous constituents into this component during the active life of the facility and the post-closure care period; and</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>Include a lower component that is designed and constructed of materials to minimize the migration of hazardous constituents if a breach in the upper component were to occur, with the lower component being constructed of at least a 3-foot thick layer of recompacted clay or other natural material with a hydraulic conductivity of no more than 1 x 10(-7th power) centimeter per second.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>Section D(4) of this regulation does not apply if the owner or operator demonstrates to the Secretary and the Secretary finds for the surface impoundment, that alternative design and operating practices, together with location characteristics, will:</text>
      <paragraph num="(a)">
        <text>Prevent the migration of any hazardous constituent into the ground water or surface water at least as effectively as the liners and leachate collection systems required by §D(4) of this regulation; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Allow detection of leaks of hazardous constituents through the top liner at least as effectively as the system described in §D-1(1)—(3) of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(6)">
      <text>The double liner requirement set forth in §D(4), of this regulation, may be waived by the Secretary for any monofill, if the monofill contains only hazardous wastes from foundry furnace emission controls or metal casting molding sand, and the wastes do not contain constituents which would render the wastes hazardous for reasons other than the toxicity characteristic in COMAR 26.13.02, and one of the following applies:</text>
      <paragraph num="(a)">
        <text>All of the following:</text>
        <paragraph num="(i)">
          <text>The monofill has at least one liner, as defined in §D(7) of this regulation, for which there is no evidence that the liner is leaking;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The monofill is located more than 1/4 mile from an underground source of drinking water as that term is defined in 40 CFR §144.3; and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>The monofill is in compliance with generally applicable ground water monitoring requirements for facilities with permits under COMAR 26.13.07; or</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>The owner or operator demonstrates that the monofill is located, designed, and operated to assure that there will be no migration of any hazardous constituent into ground water or surface water at any future time.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(7)">
      <text>For the purposes of this section, the term “liner” means a liner designed, constructed, installed, and operated to prevent hazardous waste from passing into the liner at any time during the active life of the facility, or a liner designed, constructed, installed, and operated to prevent hazardous waste from migrating beyond the liner to adjacent subsurface soil, ground water, or surface water at any time during active life of the facility.</text>
    </paragraph>
    <paragraph num="(8)">
      <text>In the case of any surface impoundment which has been exempted from the requirements of §D(4) of this regulation on the basis of a liner designed, constructed, installed, and operated to prevent hazardous waste from passing beyond the liner, at the closure of the impoundment, the owner or operator shall remove or decontaminate all waste residues, all contaminated liner material, and contaminated soil to the extent practicable. If all contaminated soil is not removed or decontaminated, the owner or operator of the impoundment shall comply with appropriate post-closure requirements, including but not limited to ground water monitoring and corrective action.</text>
    </paragraph>
    <paragraph num="(9)">
      <text>A containment system shall have a containment life equal to or greater than the life of the surface impoundment. (See “Landfill and Surface Impoundment Performance Evaluation”, EPA, SW/869, September 1980 for methods to evaluate the containment life and effectiveness of a containment system.)</text>
    </paragraph>
    <paragraph num="(10)">
      <text>Liner systems shall be:</text>
      <paragraph num="(a)">
        <text>Constructed of materials which have appropriate chemical properties and strength and of sufficient thickness to prevent failure due to pressure head, physical contact with the waste or leachate to which they are exposed, climatic conditions, and the stress of the installation and daily operations;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Constructed on a foundation capable of providing support to the liner or liners and resistance to the pressure head above the liner or liners to prevent failure of the liner or liners due to settlement, compression, or uplift; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Installed to cover all surrounding earth likely to be in contact with the waste or leachate.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(11)">
      <text>The sides and bottom of the impoundment shall be constructed of a material which prohibits the discharge of contaminants to ground water unless specifically authorized by a State discharge permit.</text>
    </paragraph>
  </paragraph>
  <paragraph num="D-1.">
    <text>Leachate Collection and Removal System.</text>
    <paragraph num="(1)">
      <text>Scope.</text>
      <paragraph num="(a)">
        <text>This section establishes requirements for a leachate collection and removal system that is required to be installed between liners in accordance with §D(4) of this regulation.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The requirements of this section also apply to a leachate collection and removal system that is immediately above the bottom composite liner in a containment system that includes multiple leachate collection and removal systems.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>A leachate collection and removal system identified in §D-1(1) of this regulation is:</text>
      <paragraph num="(a)">
        <text>Also a leak detection system; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Required to be capable of detecting, collecting, and removing leaks.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Except as provided in §D-1(4) of this regulation, the facility owner or operator shall ensure that the leachate collection and removal system is designed, constructed, and operated in accordance with the provisions of 40 CFR §264.221(c)(2)(i)—(v), (3), and (4).</text>
    </paragraph>
    <paragraph num="(4)">
      <text>The Secretary may approve alternative design and operating practices to those specified in §D-1(3) of this regulation if the owner or operator demonstrates to the Secretary that the proposed alternate design and alternate operating practices, along with location characteristics, will:</text>
      <paragraph num="(a)">
        <text>Prevent the migration of any hazardous constituent into the ground water or surface water at least as effectively as the liners and leachate collection and removal system specified in §D-1(3) of this regulation; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Allow detection of leaks of hazardous constituents through the top liner at least as effectively as the design and operating practices specified in §D-1(3) of this regulation.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="D-2.">
    <text>Action Leakage Rate.</text>
    <paragraph num="(1)">
      <text>This section establishes requirements concerning the maximum design flow rate that the leak detection system required by §§D(4) and D-1 of this regulation can remove without the fluid head on the bottom liner exceeding 1 foot.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>For the purposes of this section, “action leakage rate” means the maximum design flow rate described in §D-2(1) of this regulation.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>The owner or operator shall provide the Department with the information that the Department considers necessary for the specification of a valid action leakage rate that incorporates an adequate margin of safety to allow for uncertainties, as specified in §D-2(4) of this regulation.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>For a surface impoundment subject to §D of this regulation, the Department shall specify an action leakage rate that:</text>
      <paragraph num="(a)">
        <text>Includes an adequate safety margin, considering:</text>
        <paragraph num="(i)">
          <text>Uncertainties in the design, construction, operation, and location of the leak detection system;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The characteristics of the waste and leachate;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>The likelihood that other sources may contribute to liquids in the leak detection system, and the amounts of these liquids; and</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>Proposed response actions; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>If exceeded, obligates the owner or operator to respond as specified in §D-3 of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>To determine if the action leakage rate has been exceeded, the owner or operator shall:</text>
      <paragraph num="(a)">
        <text>Convert the weekly or monthly flow rate from the monitoring data obtained in accordance with §F(5) of this regulation to an average daily flow rate in gallons per acre per day for each sump; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Unless the Department approves a different calculation:</text>
        <paragraph num="(i)">
          <text>Each week, during the active life and closure period for the unit, calculate the average daily flow rate for each sump; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>For a unit closed in accordance with §G(2) of this regulation, calculate, each month, the average daily flow rate during the post-closure care period if monthly monitoring is required under §F(5) of this regulation.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="D-3.">
    <text>Response Action Plan.</text>
    <paragraph num="(1)">
      <text>Before managing waste in a surface impoundment that is subject to §D(4) of this regulation, the owner or operator shall:</text>
      <paragraph num="(a)">
        <text>Develop a response action plan that meets the requirements of §D-3(2) of this regulation; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Obtain the approval of the Department for the response action plan.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>The owner or operator shall ensure that the response action plan:</text>
      <paragraph num="(a)">
        <text>At a minimum describes the actions specified in 40 CFR §264.223(b), except that, in complying with 40 CFR §264.223(b), the owner or operator shall substitute “the Department” for “the Regional Administrator” and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Incorporates the procedures specified in 40 CFR §264.223(c).</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>If the action leakage rate specified under §D-2 of this regulation is exceeded, then the owner or operator shall respond as specified in the approved response action plan.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>Waste Analysis and Trial Test. In addition to the waste analyses required by Regulation .02D, whenever a surface impoundment is to be used to chemically treat a hazardous waste which is substantially different from waste previously treated in that impoundment, or chemically treat hazardous waste with a substantially different process than any previously used in that impoundment, the owner or operator shall, before treating the different waste or using the different process:</text>
    <paragraph num="(1)">
      <text>Conduct waste analyses and trial treatment tests (for example, bench scale or pilot plant scale tests); or</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Obtain written documented information on similar treatment of similar waste under similar operation conditions to show that this treatment will comply with Regulation .02H(2) of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>Inspections and Testing.</text>
    <paragraph num="(1)">
      <text>Liners.</text>
      <paragraph num="(a)">
        <text>During construction or installation, for purposes of this section, liners (except for existing portions of surface impoundments exempt from liner installation) shall include all cover systems, membranes, sheets, and/or coatings.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>During construction and installation, liner systems shall be inspected for uniformity, damage, and imperfections such as holes, cracks, thin spots, and foreign materials.</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Earth material liner systems shall be tested for compaction density, moisture content, and permeability after placement.</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Immediately after construction or installation of a liner:</text>
        <paragraph num="(i)">
          <text>Manufactured liner materials such as membranes, sheets, and coatings shall be inspected to ensure tight seams and joints and the absence of tears or blisters; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Soil-based and admixed liners and covers shall be inspected for imperfections, including lenses, cracks, channels, root holes, or other structural non-uniformities that may cause an increase in the permeability of the liner or cover.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>The owner or operator shall inspect:</text>
      <paragraph num="(a)">
        <text>A surface impoundment which contains free liquids at least once each operating day to ensure compliance with §C(1)—(3), of this regulation, and to detect any leaks or other failures of the impoundment; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Each surface impoundment, including dikes, berms, and vegetation surrounding the dike, at least once a week and after storms to:</text>
        <paragraph num="(i)">
          <text>Detect any evidence of or potential for leaks from the impoundment;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Detect severe erosion or other signs of deterioration in dikes or other containment devices;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Detect deterioration, malfunctions, or improper operation of overtopping control systems; and</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>Ensure compliance with §C(4) of this regulation.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>The structural integrity of any dike, including that portion of that dike which provides any freeboard, shall be certified against massive failure by a qualified engineer before the issuance or reissuance of a permit, or if the impoundment is not in service before being placed in service and after construction or before being returned to service. In certifying the structural integrity of the dike it shall be established that the dike will withstand the following:</text>
      <paragraph num="(a)">
        <text>The stress of the pressure head of liquids placed into the impoundment;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The weakening effect of earth materials being scoured due to leakage from the impoundment through and under the dike without relying on any liner system; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The weakening effect of earth materials being scoured due to leakage from the impoundment through and under the dike assuming leaks develop in the liner system.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>The requirements of §F(3) of this regulation, shall be followed, at a minimum, at 6-month intervals after the initial certification.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>The owner or operator shall:</text>
      <paragraph num="(a)">
        <text>Comply with the requirements of 40 CFR §264.226(d) concerning the recording of information about removal of liquids from the leak detection sump; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>In complying with 40 CFR §264.226(d), substitute “Secretary” for “Regional Administrator”.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="G.">
    <text>Closure and Post-Closure Care.</text>
    <paragraph num="(1)">
      <text>At closure, the owner or operator shall:</text>
      <paragraph num="(a)">
        <text>Remove or decontaminate all waste residues, contaminated containment system components (liner, etc.), contaminated subsoils, and structures and equipment contaminated with waste and leachate, and manage them as hazardous waste unless COMAR 26.13.02.03D applies, or he shall do §G(1)(b)—(e), of this regulation, if all hazardous waste is not removed or decontaminated;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Eliminate free liquids by removing liquid wastes or solidifying the remaining wastes and waste residues;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Stabilize remaining wastes to a bearing capacity sufficient to support final cover;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Cover the surface impoundment with a final cover designed and constructed to at a minimum:</text>
        <paragraph num="(i)">
          <text>Provide long-term minimization of the migration of liquids through the closed impoundment;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Function with minimum maintenance;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Promote drainage and minimize erosion or abrasion of the final cover;</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>Accommodate settling and subsidence so that the cover's integrity is maintained; and</text>
        </paragraph>
        <paragraph num="(v)">
          <text>Have a permeability less than or equal to the permeability of any bottom liner system or natural subsoils present; and any other requirements established by the Secretary; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(e)">
        <text>Apply for a permit pursuant to Regulation .14 and COMAR 26.13.07.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>If some waste residues or contaminated materials are left in place at final closure, the owner or operator shall comply with all post-closure requirements contained in Regulation .07 including maintenance and monitoring throughout the post-closure care period. The owner or operator shall:</text>
      <paragraph num="(a)">
        <text>Maintain the integrity and effectiveness of the final cover, including making repairs to the cap as necessary to correct the effects of settling, subsidence, erosion, or other events;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Maintain and monitor the leak detection system, where such a system is present between double liner systems;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Maintain and monitor the ground water monitoring system and comply with all applicable requirements of Regulations .06—.06-7 of this chapter;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Prevent run-on and run-off from eroding or otherwise damaging the final cover.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>If an owner or operator plans to close a surface impoundment in accordance with §G(1)(a), of this regulation, and the impoundment does not comply with the liner requirements of §D(2)—(5) of this regulation, then:</text>
      <paragraph num="(a)">
        <text>The closure plan for the impoundment under Regulation .07C shall include both a plan for complying with §G(1)(a), of this regulation, and a contingency plan for complying with §G(1)(b)—(e), of this regulation, if not all contaminated subsoils can be practicably removed at closure.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The owner or operator shall prepare a contingency post-closure plan under Regulation .07H of this chapter, for complying with §G(2), of this regulation, if not all contaminated subsoils can be practicably removed at closure.</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The cost estimates calculated under Regulation .08 for closure and post-closure care of an impoundment subject to this paragraph shall include the cost of complying with the contingent closure plan and the contingent post-closure plan, but are not required to include the cost of expected closure under §G(1)(a) of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>During the post-closure care period, if liquids leak into a leak detection system the owner or operator shall notify the Secretary of the leak within 24 hours after detecting the leak. The Secretary shall modify the permit to require compliance with the requirements of Regulations .06—.06-7 of this chapter.</text>
    </paragraph>
  </paragraph>
  <paragraph num="H.">
    <text>Containment System Repairs; Contingency Plans.</text>
    <paragraph num="(1)">
      <text>Whenever there is any indication of a possible failure of the containment system, the system shall be inspected in accordance with the provisions of the containment system evaluation and repair plan required by this section. Indications of possible failure of the containment system include at least an unplanned and non-sudden drop in the liquid level in the impoundment, liquid detected in the leachate detection system, evidence of leakage or the potential for leakage in the dike, erosion of the dike, apparent or potential deterioration of the liner or liners based on observation or test samples of the liner materials, any mishandling of wastes placed in the impoundment, and foreign objects in the impoundment.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Whenever there is a positive indication of failure of the containment system, the impoundment shall be removed from service. Indications of positive failure of the containment system include an unplanned sudden drop in the liquid level in the impoundment, waste detected in the leachate detection system, active leakage through the dike, or a breach (for example, a hole, tear, crack, or separation) in the liner system.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>If the surface impoundment must be removed from service as required by §H(2), of this regulation, the owner or operator shall:</text>
      <paragraph num="(a)">
        <text>Immediately shut off flow of or stop the addition of waters into the impoundment;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Immediately contain any leakage which occurred or is occurring;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Immediately cause the leak to be stopped;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>If the leak cannot be stopped by any other means, empty the impoundment;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Take any other necessary steps to stop or prevent catastrophic failure; and</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Notify the Secretary of the problems within 24 hours after detecting the problem.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>As part of the contingency plan required in Regulation .04, of this chapter, the owner or operator shall specify:</text>
      <paragraph num="(a)">
        <text>A procedure for complying with the requirements of §H(3) of this regulation;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>A containment system evaluation and repair plan describing testing and monitoring techniques, procedures to be followed to evaluate the integrity of the containment system in the event of possible failure, a schedule of actions to be taken in the event of a possible failure, and a description of the repair techniques to be used in the event of leakage due to containment system failure or deterioration which does not require the impoundment to be removed from service.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>A surface impoundment that has been removed from service in accordance with the requirements of this section may not be restored to service unless the portion of the impoundment which was failing is repaired and the following steps are taken:</text>
      <paragraph num="(a)">
        <text>If the impoundment was removed from service as the result of actual or imminent dike failure, the dike's structural integrity shall be recertified in accordance with §F(3) of this regulation;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>If the impoundment was removed from service as the result of a sudden drop in the liquid level, then:</text>
        <paragraph num="(i)">
          <text>For any existing portion of the impoundment, a liner shall be installed in compliance with §D(5), of this regulation;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>For any other portion of the impoundment, the repaired liner system shall be certified by a qualified engineer as meeting the design specifications approved in the permit.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(6)">
      <text>A surface impoundment that has been removed from service in accordance with §H(2), of this regulation, and that is not being repaired shall be closed in accordance with §G of this regulation.</text>
    </paragraph>
  </paragraph>
  <paragraph num="I.">
    <text>Special Requirements for Ignitable or Reactive Waste. A person may not place ignitable or reactive waste in a surface impoundment, unless the waste and impoundment satisfy all applicable requirements of 40 CFR Part 268, and the:</text>
    <paragraph num="(1)">
      <text>Waste is treated, rendered, or mixed before or immediately after placement in the impoundment so that the resulting waste, mixture, or dissolution of material no longer meets the definition of ignitable or reactive wastes under COMAR 26.13.02.11 or .13, and Regulation .02H of this chapter is complied with; or</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Surface impoundment is used solely for emergencies.</text>
    </paragraph>
  </paragraph>
  <paragraph num="J.">
    <text>Special Requirements for Incompatible Waste. Incompatible wastes, or incompatible wastes and materials (see Regulation .24 of this chapter, for examples), may not be placed in the same surface impoundment, unless Regulation .02H(2) of this chapter, is complied with.</text>
  </paragraph>
  <paragraph num="K.">
    <text>Special Requirements for Hazardous Wastes F020, F021, F022, F023, F026, and F027.</text>
    <paragraph num="(1)">
      <text>Hazardous Wastes F020, F021, F022, F023, F026, and F027 may not be placed in a surface impoundment unless the owner or operator operates the surface impoundment in accordance with a management plan for these wastes that is approved by the Secretary under the standards set out in this section, and in accordance with all other applicable requirements of this chapter. The factors to be considered are:</text>
      <paragraph num="(a)">
        <text>The volume, physical, and chemical characteristics of the wastes including their potential to migrate through soil or to volatilize or escape into the atmosphere;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The attenuative properties of underlying and surrounding soils or other materials;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The mobilizing properties of other materials co-disposed with these wastes; and</text>
      </paragraph>
      <paragraph num="(d)">
        <text>The effectiveness of additional treatment, design, or monitoring techniques.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>The Secretary may determine that additional design, operating, and monitoring requirements are necessary for surface impoundments managing hazardous wastes F020, F021, F022, F023, F026, and F027 in order to reduce the possibility of migration of these wastes to ground water, surface water, or air so as to protect human health and the environment.</text>
    </paragraph>
  </paragraph>
</regulation>