<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".22" citation="COMAR 26.13.07.22" title_num="26" subtitle_num="13" chapter_num="07" heading="Limited Facility Permits for Thermal Destruction Facilities other than Hazardous Waste Incinerators.">
  <paragraph num="A.">
    <text>Permits Required.</text>
    <paragraph num="(1)">
      <text>A person may not thermally destroy hazardous waste in an installation other than a hazardous waste incinerator without first obtaining a Limited Facility Permit and an air quality operating permit, except that an electric generating station is not required to obtain an air quality operating permit.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The effects of these regulations with respect to persons who have submitted timely applications under §B(2) shall be stayed until the Department has either issued or denied the Limited Facility Permit, but only so long as the applicant operates in compliance with the terms and conditions of an approval issued by the Department under COMAR 26.11.09.10.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Upon issuance of the Limited Facility Permit, the terms and conditions of the Limited Facility Permit will supersede the terms and conditions of any approval issued under COMAR 26.11.09.10.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Application for a Limited Facility Permit.</text>
    <paragraph num="(1)">
      <text>A person may apply to the Department for a Limited Facility Permit on an application provided by the Department. The application shall include the following information:</text>
      <paragraph num="(a)">
        <text>The name and address of the owner of the installation in which the thermal destruction is to take place;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The location of the installation in which the thermal destruction is to take place;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>A description of the installation in which the thermal destruction is to take place including:</text>
        <paragraph num="(i)">
          <text>The maximum rated heat input,</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The burner type or types,</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>A description of the combustion chamber,</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>The fuel type usually used,</text>
        </paragraph>
        <paragraph num="(v)">
          <text>Any air pollution control devices used, and</text>
        </paragraph>
        <paragraph num="(vi)">
          <text>A description of the exhaust system including the stack height and diameter;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(d)">
        <text>The characteristics of the hazardous waste to be thermally destroyed including:</text>
        <paragraph num="(i)">
          <text>The flash point,</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The heat content, expressed in Btu per pound, and</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>The viscosity;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(e)">
        <text>The total annual quantity of the hazardous waste to be thermally destroyed and the expected firing rate, expressed in pounds/hour;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>An operations plan for the installation that will be thermally destroying the hazardous waste including:</text>
        <paragraph num="(i)">
          <text>The start-up procedure,</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>The normal operating procedure,</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>The shut-down procedure, and</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>The estimated firing time, expressed in hours per day and days per week;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(g)">
        <text>A waste analysis plan as described in COMAR 26.13.05.02D(2);</text>
      </paragraph>
      <paragraph num="(h)">
        <text>A general inspection schedule as described in COMAR 26.13.05.02F(2);</text>
      </paragraph>
      <paragraph num="(i)">
        <text>A contingency plan as described in COMAR 26.13.05.04;</text>
      </paragraph>
      <paragraph num="(j)">
        <text>A closure plan as described in COMAR 26.13.05.07C;</text>
      </paragraph>
      <paragraph num="(k)">
        <text>A closure cost estimate, evidence of financial responsibility and evidence of insurance, all as described in COMAR 26.13.05.08;</text>
      </paragraph>
      <paragraph num="(l)">
        <text>Any other information the Department may request in order to make a determination under this regulation;</text>
      </paragraph>
      <paragraph num="(m)">
        <text>The signature on the application of the applicant, if the applicant is an individual person, or of a person who is a responsible official, as described in Regulation .03A, of the organization, if the applicant is a business, governmental, or other organization entity.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>An installation subject to §A(1) that was in operation on the effective date of these regulations shall apply to the Department for a Limited Facility Permit on an application provided by the Department within 6 months of the effective date of this regulation. The application shall contain the information requested in §B(1).</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Issuance of a Limited Facility Permit.</text>
    <paragraph num="(1)">
      <text>General. Applications for a Limited Facility Permit will be reviewed and a permit issued by the Department based on the combustion efficiency and capacity of the installation to be used to destroy the waste. In determining the approvability of an application, the Department will consider the characteristics of the components in the waste and the capability of the installation to dispose of the waste in a manner that will have no adverse impact on the environment or on persons living in the area of the installation proposed to be used.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Specific Requirements. A permit may be issued if the following requirements are met:</text>
      <paragraph num="(a)">
        <text>The burner within the installation shall be of a type and size to burn the specified waste and the heat energy demand of the installation shall be constant during the time when the waste is burned or otherwise capable of maintaining the required combustion conditions;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The stack height of the installation shall be consistent with good engineering practice;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The installation shall be operated and maintained by a person directly assigned to those responsibilities;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>The discharge of components of the waste or products of combustion of the waste, including sulfur, lead, and halogenated compounds, may not cause a violation of any ambient air quality standards at COMAR 26.11.03 and COMAR 26.11.04 or cause a threat to public health;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>If PCBs are present in the waste to be destroyed, the PCB content of the waste shall be within allowable limits for the selected installation as specified by the U.S. EPA.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Permit Conditions and Procedures.</text>
    <paragraph num="(1)">
      <text>The conditions and procedures specified at Regulations .04--.14 as applicable to facility permits shall also apply to Limited Facility Permits.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The Department may establish conditions on a permit for the purpose of monitoring and controlling the efficiency of combustion of the waste, the products of combustion in the exhaust, or the composition of the waste feed.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>The Department will deny an application for a Limited Facility Permit if it determines that the requirements of §§B and D of this regulation or any other applicable requirements under this subtitle have not been satisfied.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>Permit Duration. A Limited Facility Permit under this regulation is valid for 3 years unless modified, revoked, or terminated under Regulation .11 or .20B of this chapter.</text>
  </paragraph>
</regulation>