<?xml version='1.0' encoding='utf-8'?>
<chapter num="02" heading="Reduction of Lead Risk in Housing" title_num="26" subtitle_num="16">
  <regulation prefix="Regulation" num=".01" heading="Scope.">
    <text>This chapter establishes requirements and standards for the maintenance and inspection of residential rental properties.</text>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Definitions.">
    <paragraph num="A.">
      <text>In this chapter, the following words have the meanings indicated.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Terms Defined.</text>
      <paragraph num="(1)">
        <text>“Accredited” means accredited by the Department of the Environment under provisions of COMAR 26.16.01.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Component.</text>
        <paragraph num="(a)">
          <text>“Component” means an architectural element of a dwelling unit, common area, or exterior surface, identified by type and location.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Component” includes, but is not limited to:</text>
          <paragraph num="(i)">
            <text>A bedroom wall;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An exterior window sill;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>A baseboard in a living room;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>A kitchen floor;</text>
          </paragraph>
          <paragraph num="(v)">
            <text>An interior window sill in a bathroom;</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>A porch floor;</text>
          </paragraph>
          <paragraph num="(vii)">
            <text>Stair treads in a common stairwell; or</text>
          </paragraph>
          <paragraph num="(viii)">
            <text>An exterior wall.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>“Component type” means a group of like components that:</text>
        <paragraph num="(a)">
          <text>Are repeated in more than one room equivalent in a dwelling unit; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Have a common substrate.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>“Encapsulant coating” means coating lead-based paint with a material which is applied as a liquid, which forms a durable, long-lasting coating for lead-based paint, and which is approved for use, on a case-by-case basis, by the Department.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>“Lead-based paint” means paint or other surface coating that contains lead in excess of the levels set forth in COMAR 26.16.01.02B(7).</text>
      </paragraph>
      <paragraph num="(6)">
        <text>“Lead-contaminated dust” means dust with a lead content equal to or greater than:</text>
        <paragraph num="(a)">
          <text>10 micrograms per square foot in dust collected from a floor;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>100 micrograms per square foot in dust collected from a window sill; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>100 micrograms per square foot in dust collected from a window well.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(7)">
        <text>“Lead-free” means, except for factory-applied coatings on metal components, containing no lead-based paint on interior or exterior surfaces.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>“Lead-free replacement window” means a window that:</text>
        <paragraph num="(a)">
          <text>Was installed after 1978; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Has been determined by an accredited lead paint inspector technician or lead paint risk assessor to contain no lead-based paint.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(9)">
        <text>“Lead-safe” means:</text>
        <paragraph num="(a)">
          <text>Constructed after 1978;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Certified as lead-safe under Regulation .04 of this chapter; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Certified as lead-free under Regulation .05 of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(10)">
        <text>“Limited lead-free” means, except for factory-applied coatings on metal components, meeting the following conditions:</text>
        <paragraph num="(a)">
          <text>All interior surfaces of the affected property contain no lead-based paint;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>All exterior painted surfaces of the affected property that were chipping, peeling, or flaking, have been restored with non-lead-based paint;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>No exterior painted surfaces of the affected property are chipping, peeling, or flaking; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>The owner of an affected property submits to the Department, every 2 years, a certification by an accredited lead paint inspection contractor stating that no exterior painted surface of the affected property is chipping, peeling, or flaking.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(11)">
        <text>“Room” means an enclosed or semi-enclosed living space, including a defined hallway, within a dwelling unit.</text>
      </paragraph>
      <paragraph num="(12)">
        <text>Room Equivalent.</text>
        <paragraph num="(a)">
          <text>“Room equivalent” means an identifiable part of a dwelling unit, common area, or exterior surface.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Room equivalent” includes, but is not limited to:</text>
          <paragraph num="(i)">
            <text>A room;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A foyer;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>A staircase;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>A hallway; or</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Exterior sides of a building with the same paint history.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(13)">
        <text>“Substrate” means the material immediately beneath the painted surface.</text>
      </paragraph>
      <paragraph num="(14)">
        <text>Testing Combination.</text>
        <paragraph num="(a)">
          <text>“Testing combination” means a unique combination of room equivalent, component type, and substrate.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>“Testing combination” may include a group of components, having the same painting histories, that are structurally related and adjacent to each other.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02-1" heading="Incorporation by Reference.">
    <text>The U.S. Department of Housing and Urban Development Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing (Second Edition, July, 2012), Chapter 7: Lead-Based Paint Inspection is incorporated by reference.</text>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Certificate to Verify Satisfaction of the Risk Reduction Standard.">
    <paragraph num="A.">
      <text>The owner of a rental property shall:</text>
      <paragraph num="(1)">
        <text>Verify compliance with the risk reduction standard of Environment Article, §6-815, Annotated Code of Maryland, by an inspection for lead-contaminated dust, as specified in §B of this regulation, provided that any chipping, peeling, or flaking paint has been removed or repainted on the exterior painted surfaces of the residential building in which the rental dwelling unit is located and the interior painted surfaces of the rental dwelling unit; or by satisfaction of the requirements in §A(2) of this regulation; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Verify compliance with the risk reduction standard of Environment Article, §6-819, Annotated Code of Maryland, by a visual inspection as specified in §C of this regulation, to verify compliance with the required lead hazard reduction treatments, and an inspection for lead-contaminated dust, as specified in §B of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Inspection for Lead-Contaminated Dust.</text>
      <paragraph num="(1)">
        <text>To satisfy the test for lead-contaminated dust under Environment Article, §6-815 or 6-819, Annotated Code of Maryland, an accredited lead paint visual inspector or lead paint risk assessor may issue a certificate of satisfactory lead dust inspection following the laboratory analysis of dust samples that meet the levels in Regulation .02B(6) of this chapter.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The dust samples shall have been collected during an inspection by an accredited lead paint visual inspector or accredited lead paint risk assessor.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The visual inspector or lead paint risk assessor shall follow procedures as specified in COMAR 26.16.05.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>If the lead paint visual inspector or lead paint risk assessor identifies chipping, flaking, or peeling paint, a failing certificate shall be issued unless the property has passed a reinspection within 30 calendar days of the initial inspection.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>If no chipping, flaking, or peeling paint is identified during the visual review, the lead paint visual inspector or lead paint risk assessor shall:</text>
        <paragraph num="(a)">
          <text>Select dust sample locations which best characterize the potential for lead exposure within a dwelling unit;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Collect dust samples from the dwelling unit as follows:</text>
          <paragraph num="(i)">
            <text>From each room in which there is no window, at least one dust sample shall be collected from the floor;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>From each room in which there is at least one window that is not a lead-free replacement window, at least two dust samples shall be collected, one of which shall be collected from the window well of a window that is not lead-free and one of which shall be from a window sill or the floor;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>From each room in which all windows are lead-free replacement windows, there shall be at least one dust sample collected from either a window sill or the floor.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>The lead paint inspection contractor shall issue a certificate, either passing or failing, for every inspection performed.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>The lead paint inspection contractor shall submit a copy of the passing certificate, with a report of all inspection results, laboratory analysis, and all supporting documents to the Department and the property owner, within 10 calendar days following receipt of the laboratory analysis of the dust samples.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>The lead paint inspection contractor shall submit a copy of the failing certificate, with a report of all inspection results, laboratory analysis, and all supporting documents to the Department and the property owner, within 30 calendar days following receipt of the laboratory analysis of the dust samples unless the property or unit has passed a reinspection within 30 calendar days of the initial inspection.</text>
      </paragraph>
      <paragraph num="(9)">
        <text>If the property owner has elected to meet the risk reduction standard by passing the test for lead-contaminated dust, the Department may inspect the property for chipping, flaking, or peeling paint and collect, in the performance of a spot check or other investigation authorized by Environment Article, §6-851 or 6-852, Annotated Code of Maryland, dust samples for laboratory analysis to confirm that the risk reduction standard has been satisfied.</text>
      </paragraph>
      <paragraph num="(10)">
        <text>If the property fails to meet the risk reduction standard for the dust test upon an inspection or re-inspection, the property owner may perform the HEPA vacuum and detergent wash required by COMAR 26.16.01.11 in the room from which the failed dust sample was collected and retest that room in accordance with §B(5) of this regulation.</text>
      </paragraph>
      <paragraph num="(11)">
        <text>The lead paint inspection contractor shall provide 24-hour advance notice to the Department that a dust test will be performed.</text>
      </paragraph>
      <paragraph num="(12)">
        <text>The property owner shall obtain, record, and maintain the following information regarding any contractors, supervisors, or workers that performed or supervised a lead hazard reduction treatment on the property owner's property:</text>
        <paragraph num="(a)">
          <text>Names and accreditation numbers for all contractors and supervisors; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Names of all workers.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(13)">
        <text>Upon request by the Department, a property owner shall provide the Department with copies of the records required in §B(12) of this regulation.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Visual Inspection.</text>
      <paragraph num="(1)">
        <text>An accredited lead paint visual inspector or lead paint risk assessor may conduct a visual inspection to certify compliance with the risk reduction standard of Environment Article, §6-819, Annotated Code of Maryland.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>An accredited lead paint inspection contractor shall issue a certificate of compliance with the risk reduction standard based on:</text>
        <paragraph num="(a)">
          <text>A visual inspection of all interior and exterior surfaces of the dwelling unit that establishes performance of all applicable lead hazard reduction treatments required by Environment Article, §6-819, Annotated Code of Maryland; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Receipt of a statement with original signature, signed by the accredited supervisor overseeing performance of the lead hazard reduction treatments, that all lead hazard reduction treatments were conducted in accordance with the requirements of Environment Article, §6-819, as applicable, and COMAR 26.16.01.11.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The visual inspector or lead paint risk assessor shall follow all procedures specified in COMAR 26.16.05.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The lead paint inspection contractor shall attach to the certificate of compliance:</text>
        <paragraph num="(a)">
          <text>A report of all observations regarding the maintenance and cleaning status of the unit recorded during the inspection; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The statement required in §C(2)(b) of this regulation, signed by the responsible supervisor.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>The property owner shall obtain, record, and maintain the following information regarding any contractors, supervisors, or workers that performed or supervised any lead hazard reduction treatment:</text>
        <paragraph num="(a)">
          <text>Names and accreditation numbers of all contractors and supervisors;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Names of all other workers.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>Upon request by the Department, a property owner shall provide the Department with copies of the records required in §C(5) of this regulation.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>The lead paint inspection contractor shall submit a copy of the certificate of compliance, with a completed copy of the inspection report, to the Department within 10 calendar days following receipt of the laboratory analysis of the dust samples.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Lead Certificate Inventory Sheet.</text>
      <paragraph num="(1)">
        <text>All lead paint inspection contractors shall maintain a list of all certificates they have received from the Department, on a form prescribed by the Department.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Upon request by the Department, an inspector shall provide the Department with a copy of the completed lead certificate inventory sheet required by §D(1) of this regulation.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Certification of Lead-Safe Housing.">
    <paragraph num="A.">
      <text>An accredited lead paint inspection contractor may issue a certificate of lead-safe housing following an inspection that:</text>
      <paragraph num="(1)">
        <text>Establishes compliance with the risk reduction standard as specified in Environment Article, §6-815, Annotated Code of Maryland;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Incorporates the lead dust sample location methods set forth in §B(3) of this regulation; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Verifies that all windows are either lead-free or have been treated so that all friction surfaces are lead-free.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Inspection for Lead-Contaminated Dust for Certification of Lead-Safe Housing.</text>
      <paragraph num="(1)">
        <text>The dust samples for an inspection of lead-contaminated dust for certification of lead-safe housing shall be collected during an inspection by an accredited lead paint visual inspector or accredited lead paint risk assessor.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The accredited lead paint visual inspector or risk assessor shall follow the lead dust sample collection techniques set forth in COMAR 26.16.05.09.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Selection of Surfaces for Dust Samples. The lead paint visual inspector or risk assessor shall:</text>
        <paragraph num="(a)">
          <text>Select dust sample locations which best characterize the potential for lead exposure within a dwelling unit, to include activity areas for children;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Collect at least one dust sample from each room in a dwelling unit as follows:</text>
          <paragraph num="(i)">
            <text>From each room in which there is no window, at least one sample shall be collected from the floor;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>From each room in which there is at least one window, at least three samples shall be taken, including one each from a window well, a window sill, and the floor.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Within 10 calendar days following receipt of all required laboratory analyses for dust samples collected during an inspection, the inspection contractor shall submit a copy of the certificate, with a report of all inspection results, to the Department.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Certification of Housing as Lead-Free.">
    <paragraph num="A.">
      <text>An accredited lead paint inspection contractor may issue a certificate of lead-free housing after an inspection that verifies that all painted interior and exterior surfaces of an affected property meet Regulation .02B(7) of this chapter.</text>
    </paragraph>
    <paragraph num="B.">
      <text>An accredited lead paint inspection contractor may issue a certificate of limited lead-free housing after an inspection that verifies that all painted interior and exterior surfaces of an affected property meet the provisions of Regulation .02B(10) of this chapter.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Term Defined. In §D of this regulation, “common area” means stairways, hallways, entrance areas, recreation areas, laundry areas, and garages or other similar areas within a multifamily rental dwelling that are common to individual dwelling units and are accessible to tenants.</text>
    </paragraph>
    <paragraph num="D.">
      <text>An affected property that is a multiunit building or multibuilding complex having ten or more dwelling units may be certified to be lead-free based on testing of less than all dwelling units, common areas, and exterior surfaces if:</text>
      <paragraph num="(1)">
        <text>The building or complex is demonstrated to be of uniform construction or painting history;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Selection of dwelling units, common areas, and exterior surfaces to be tested is based on an accepted technique for generating and assigning random numbers to produce an unbiased sample;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The determination of the minimum number of dwelling units, common areas, and exterior surfaces to be tested is in accordance with Table 7.3: Number of Units to be Tested in Multi-family Building or Developments, found in the U.S. Department of Housing and Urban Development Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing (Second Edition, July, 2012), Chapter 7: Lead-Based Paint Inspection;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The following procedures are performed for the selected dwelling units, common areas, and exterior surfaces in the building or complex:</text>
        <paragraph num="(a)">
          <text>Identify all testing combinations in each room equivalent;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Obtain at least one XRF reading or paint sample analysis for each testing combination in each room equivalent;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Obtain at least one XRF reading or paint sample analysis for each wall in each room equivalent;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Record each XRF reading or paint sample analysis for each testing combination in a format approved by the Department;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Classify each testing combination as positive or negative for the presence of lead-based paint;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Aggregate data according to component type in a format approved by the Department; and</text>
        </paragraph>
        <paragraph num="(g)">
          <text>Do one of the following:</text>
          <paragraph num="(i)">
            <text>Test at least 40 testing combinations of a given component type;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>For multiunit buildings or multibuilding complexes with less than 40 components of a given component type, test all of that component type; or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Treat a component type as positive for the presence of lead based paint in the entire multiunit building or multibuilding complex;</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>The following conditions are met for each component type:</text>
        <paragraph num="(a)">
          <text>If 5 percent or greater of a component type test positive for lead-based paint:</text>
          <paragraph num="(i)">
            <text>Remove lead-based paint from all components of that component type; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Test all of that component type and remove lead-based paint from each component that tests positive for lead-based paint; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>If less than 5 percent of a component type test positive for lead-based paint:</text>
          <paragraph num="(i)">
            <text>Remove lead-based paint from all components of that component type; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Conduct a second random sample of that component type in previously untested dwelling units, common areas, or exterior surfaces, and if less than 2.5 percent of the combined test results are negative for lead-based paint, remove lead-based paint from every component type that tests positive for lead-based paint.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>A property owner may confirm any positive XRF reading by laboratory analysis of a paint sample, reporting the result in milligrams per square centimeter.</text>
    </paragraph>
    <paragraph num="F.">
      <text>An affected property that is a multiunit building or multibuilding complex having ten or more dwelling units may be certified to be limited lead-free based on testing of less than all dwelling units if the:</text>
      <paragraph num="(1)">
        <text>Interior surfaces comply with §D of this regulation; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Exterior surfaces comply with Regulation .02B(10)(b)—(d) of this chapter.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Factory-Applied Coatings.</text>
      <paragraph num="(1)">
        <text>An affected property in which lead-based paint is detected only in factory-applied coatings of metal components may be certified to be lead-free.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The inspector technician or risk assessor shall indicate the presence of factory-applied lead-based paint on metal components in the inspection report.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>An accredited lead paint inspector technician or an accredited lead paint risk assessor shall conduct the inspection for lead content in paint.</text>
    </paragraph>
    <paragraph num="I.">
      <text>Determination of lead content in paint for each tested interior and exterior surface of an affected property shall be based on either laboratory analysis of paint for lead or analysis by a portable XRF in accordance with COMAR 26.16.01.02B(7).</text>
    </paragraph>
    <paragraph num="J.">
      <text>The conduct of the inspection for lead content in paint shall follow procedures included in the lead paint inspection contractor's approved protocol, as required by COMAR 26.16.01.09.</text>
    </paragraph>
    <paragraph num="K.">
      <text>Surfaces of an affected property are lead-free when:</text>
      <paragraph num="(1)">
        <text>Each painted surface is determined to be lead-free based upon either laboratory analysis or XRF analysis of paint for lead; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Lead paint has been fully removed and lead paint removal is verified by a visual inspection by an accredited inspector or risk assessor before the surface is repainted or covered, and applicable requirements of COMAR 26.02.07 are met.</text>
      </paragraph>
    </paragraph>
    <paragraph num="L.">
      <text>Within 10 days of issuing a certificate, the inspection contractor shall submit to the Department a copy of the certificate with a summary report of inspection results to include:</text>
      <paragraph num="(1)">
        <text>The number of XRF testing locations recorded, and a summary of XRF testing results;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The number of paint samples submitted for laboratory analysis and a summary of laboratory results, including confirmation of inconclusive XRF results;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A list of exterior components from which paint has been removed under §K of this regulation;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>For a multiunit building or complex in which the units were randomly sampled under this regulation, the following information in a format approved by the Department:</text>
        <paragraph num="(a)">
          <text>A list of all tested dwelling units and other interior surfaces; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>An itemized list of all rental dwelling units that are subject to either the lead-free or limited lead-free certificate; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>A statement that reads “This certification of housing as lead-free is based on testing for lead paint to satisfy the requirements of Environment Article, §6-804, Annotated Code of Maryland. This is not a warranty that the building is free of lead hazards.”</text>
      </paragraph>
    </paragraph>
    <paragraph num="M.">
      <text>The inspection contractor shall maintain a full report recording all inspection results for an affected property certified to be lead-free under this regulation for a period of 5 years following issuance of the certificate, and shall provide a copy of this report to the Department upon request by the Department.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Issuance of Failing Certificate.">
    <paragraph num="A.">
      <text>If an inspection demonstrates that a unit has not been brought into compliance with the applicable standards under Environment Article, §6-804, 6-815, or 6-819, Annotated Code of Maryland, the unit is considered to have failed the inspection and a failing certificate shall be issued.</text>
    </paragraph>
    <paragraph num="B.">
      <text>If a unit fails inspection, the lead paint inspection contractor shall submit a copy of the failing certificate to the Department within 30 calendar days following the inspection or receipt of the laboratory analysis of dust samples.</text>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Encapsulant Coating of Lead-Based Paint.">
    <paragraph num="A.">
      <text>Application of an encapsulant coating used to meet risk reduction standards under Environment Article, §6-819(a)(2), Annotated Code of Maryland, shall conform to the standards of this regulation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>An encapsulant coating using fiberglass mats shall:</text>
      <paragraph num="(1)">
        <text>Fully cover the surface which contains lead-based paint; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Be secured at all edges.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>The use of encapsulant coating with any product which does not include a fiberglass mat may be approved by the Department on a case-by-case basis.</text>
    </paragraph>
    <paragraph num="D.">
      <text>Continued Inspection and Maintenance Requirements.</text>
      <paragraph num="(1)">
        <text>The owner shall conduct and document a visual inspection of each encapsulant coated surface within 1 year following the issuance of the certificate, and annually after that, to determine the presence of any defect in the encapsulant coating materials.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The owner shall promptly repair any defect in the encapsulant coating materials which is reported to the owner or which is observed during the owner's inspection.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".08" heading="Invalid Certificate.">
    <paragraph num="A.">
      <text>A certificate is invalid if the inspector or risk assessor is not accredited at the time it is issued.</text>
    </paragraph>
    <paragraph num="B.">
      <text>A certificate issued by an accredited inspector or risk assessor following procedures set forth in the lead paint inspection contractor's approved protocols, as required by COMAR 26.16.01.09, may be invalidated by the Department if:</text>
      <paragraph num="(1)">
        <text>The accreditation of the lead paint inspection contractor had expired before the issuance of the certificate; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Application for renewal was not submitted to the Department in a timely manner.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Environment Article, §§1-404, 6-801—6-852, and 6-1001—6-1005, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date:</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01—.07 adopted as an emergency provision effective February 24, 1996 (22:24 Md. R. 1884)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01—.07 adopted effective August 12, 1996 (23:16 Md. R. 1177)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02B amended effective February 22, 1999 (26:4 Md. R. 274); February 17, 2003 (30:3 Md. R. 182); September 29, 2003 (30:19 Md. R. 1335); July 1, 2020 (476:13 Md. R. 643)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02-1 adopted effective February 17, 2003 (30:3 Md. R. 182)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .02-1 amended effective July 1, 2020 (476:13 Md. R. 643)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03 amended effective May 19, 2008 (35:10 Md. R. 974)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03 amended as an emergency provision effective January 1, 2012 (38:27 Md. R. 1762); amended permanently effective April 30, 2012 (39:8 Md. R. 536)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03A amended effective February 17, 2003 (30:3 Md. R. 182)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .03B, C amended effective December 20, 2004 (31:25 Md. R. 1792)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .04 amended effective February 23, 2009 (36:4 Md. R. 356)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .04B amended effective December 20, 2004 (31:25 Md. R. 1792); May 19, 2008 (35:10 Md. R. 974)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .05 amended effective September 29, 2003 (30:19 Md. R. 1335)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .05D amended effective July 1, 2020 (476:13 Md. R. 643)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .05F amended effective February 22, 1999 (26:4 Md. R. 274)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .05L adopted effective May 19, 2008 (35:10 Md. R. 974)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .06 adopted effective May 19, 2008 (35:10 Md. R. 974)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .07A amended as an emergency provision effective January 1, 2012 (38:27 Md. R. 1762); amended permanently effective April 30, 2012 (39:8 Md. R. 536)</annotation>
    <annotation type="History" subtype="Administrative History">Regulation .08 adopted effective December 20, 2004 (31:25 Md. R. 1792)</annotation>
  </annotations>
</chapter>