<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".06" citation="COMAR 26.16.05.06" title_num="26" subtitle_num="16" chapter_num="05" heading="Lead-Based Paint Inspections.">
  <paragraph num="A.">
    <text>Lead-based paint inspections for single-family housing or multiple-unit housing shall be performed in accordance with COMAR 26.16.02.05.</text>
  </paragraph>
  <paragraph num="B.">
    <text>XRF Sampling.</text>
    <paragraph num="(1)">
      <text>XRF calibration checks shall be performed in accordance with the manufacturer's specifications and most recent performance characteristics sheet (PCS).</text>
    </paragraph>
    <paragraph num="(2)">
      <text>XRF analyzers shall be checked according to the manufacturer's specifications.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Calibration check readings shall be:</text>
      <paragraph num="(a)">
        <text>Recorded on the calibration check test results form prescribed by the Department; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Stored in the instrument's memory and printed out or transferred to a computer.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>The MDE 330 Form E shall be used to record a summary of the inspection.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Paint Chip Sampling.</text>
    <paragraph num="(1)">
      <text>Paint chip sampling for the purpose of issuing a lead-free inspection certificate may not be performed in occupied units except when verifying XRF inconclusive samples according to the PCS.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Paint chip samples collected in occupied units to verify XRF inconclusive samples shall be collected from the location the XRF reading was obtained.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Areas where paint chip samples were collected shall be repainted with nonlead-based paint or the equivalent.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>The inspection company shall notify the property owner and tenants of units where lead-free paint chip sampling is performed of the results not later than 10 days following the results being received by the inspection company.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Paint chip sampling shall be performed using the following tools:</text>
      <paragraph num="(a)">
        <text>Sharp stainless steel paint scraper or equivalent;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>A wipe which is a disposable towelette moistened with a wetting agent that meets specifications of the American Society for Testing Materials International (ASTM) Specification E 1792, for cleaning paint scraper or equivalent;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Nonsterilized polyethylene centrifuge tube or other sealable rigid container;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Nonsterilized nonpowdered latex or similar gloves; and</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Field sampling and laboratory submittal forms.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(6)">
      <text>Paint chip samples shall be collected in accordance with the following requirements:</text>
      <paragraph num="(a)">
        <text>The paint chip sample area shall be in accordance with the (ASTM) standard E 1792;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Persons collecting paint chip samples shall wear new disposable gloves for each sample;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The surface directly below the area to be sampled shall be covered with 4-millimeter-thick plastic sheeting or equivalent to ensure that any paint dust or debris generated during the sample collection is collected for disposal;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Paint chip sampling shall be performed by moving the paint scraper over a painted surface using enough pressure to remove all paint layers down to the substrate;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>The paint chip sample material shall be collected in a screw top centrifuge tube or other sealable rigid container;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>The 4-millimeter-thick plastic sheeting shall be removed from below the sample area;</text>
      </paragraph>
      <paragraph num="(g)">
        <text>Following the collection of the sample, the sample location and surface directly below the sample location shall be cleaned using wet wipes, or equivalent;</text>
      </paragraph>
      <paragraph num="(h)">
        <text>The sample location and number shall be recorded on the sample collection container and field sampling paperwork;</text>
      </paragraph>
      <paragraph num="(i)">
        <text>Chain of custody form shall be completed and provided to the courier;</text>
      </paragraph>
      <paragraph num="(j)">
        <text>All paint chip samples shall be analyzed by a laboratory approved by the National Lead Laboratory Accreditation Program (NLLAP); and</text>
      </paragraph>
      <paragraph num="(k)">
        <text>Lead-based paint inspection results shall be reported on forms prescribed by the Department.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Lead-free paint inspection for multi-unit buildings may be certified lead-free by XRF or paint chip sampling performed in accordance with COMAR 26.16.02.05D.</text>
  </paragraph>
</regulation>