Plain Text Law

Title 26 — Subtitle 17. Water Management

Chapter 01. Erosion and Sediment Control

Regulation .01 Definitions.Copy Citation

A.
In this chapter, the following terms have the meanings indicated. Terms not defined below shall have the meanings given to them in the relevant statutes, or if not defined in statutes, the meanings attributed by common use. The terms “Administration”, “person”, “pollution”, “responsible personnel”, “waters of the State”, are defined in Environment Article, §4-104 or 5-101, Annotated Code of Maryland. The meanings for these specific terms are provided as a convenience, but persons affected by the Administration's regulations should be aware that these meanings are subject to amendment by the General Assembly.
B.
Terms Defined.
(1)
“Administration” means the Water Management Administration.
(2)
“Agricultural land management practices” means those methods and procedures used in the cultivation of land in order to further crop and livestock production, and conservation of related soil and water resources. Logging and timber removal operations may not be considered a part of this definition.
(3)
“Approval authority” means the soil conservation district, municipal corporation, specified agency, Commission, or the Administration that is authorized by or pursuant to Environment Article, §4-105, Annotated Code of Maryland, to review and approve erosion and sediment control plans for the given jurisdiction.
(4)
“Clear” means any activity which removes the vegetative cover while leaving the root mat intact.
(5)
“Commission” means the Washington Suburban Sanitary Commission.
(6)
“Department” means the Department of the Environment.
(7)
“Erosion” means the process by which the land surface is worn away by the action of wind, water, ice, or gravity.
(8)
“Erosion and sediment control plan” means an erosion and sediment control strategy or plan designed to minimize erosion and prevent off-site sedimentation, in accordance with the requirements of the approval authority and the handbook “ 2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control,” which is incorporated by reference in Regulation .11 of this chapter.
(9)
“Erosion and Sediment Control Program” means any program administered by a State unit, county, municipality, or the Commission under an erosion and sediment control ordinance or regulations approved by the Administration, which provides for erosion and sediment control plan review, permit issuance, site inspection, and enforcement activity in accordance with the requirements of these regulations.
(10)
“Federal project” means any project that requires an erosion and sediment control plan in accordance with Regulation .05 of this chapter undertaken by a federal unit .
(11)
“Federal unit” means any federal agency that intends to or does clear, grade, transport, or otherwise disturb the land or soil surface in the course of its activities.
(12)
“Grade” means to cause the disturbance of the earth. This includes but is not limited to any excavating, filling, stockpiling of earth materials, grubbing, or root mat or top soil disturbance.
(13)
“Grading unit” means the maximum contiguous area allowed to be graded at a given time.
(14)
“Highly erodible soils” means those soils with a slope greater than 15 percent or those soils with a soil erodability factor, K, greater than 0.35 and with slopes greater than 5 percent.
(15)
“Owner/developer” means a person undertaking, or for whose benefit, activities covered by the Sediment Control Subtitle, or regulations promulgated under it, are carried on. General contractors or subcontractors, or both, without a proprietary interest in a project are not included within this definition.
(16)
“Person” includes the federal government, the State, any county, municipal corporation, or other political subdivision of the State, or any of their units, or an individual, receiver, trustee, guardian, executor, administrator, fiduciary, or representative of any kind, or any partnership, firm, association, public or private corporation, or any of their affiliates, or any other entity.
(17)
“Pollution” means the contamination or other alteration of the physical, chemical, or biological properties of any waters of the State, including change in temperature, taste, color, turbidity, or odor of the waters, or the discharge or deposit of any organic matter, harmful organisms, liquid, gaseous, solid, radioactive, or other substance into any waters of the State that will render the waters harmful, detrimental, or injurious to:
(a)
Public health, safety or welfare;
(b)
Domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses; or
(c)
Livestock, wild animals, birds, fish, or other aquatic life.
(18)
“Professional architect” means an architect duly registered by the State to practice architecture in accordance with the provisions of Business Occupations and Professions Article, Title 3, Annotated Code of Maryland.
(19)
“Professional engineer” means an engineer duly registered by the State to practice engineering in accordance with the provisions of Business Occupations and Professions Article, Title 14, Annotated Code of Maryland.
(20)
“Professional forester” means a forester duly registered by the State to practice forestry in accordance with the provisions of Business Occupations and Professions Article, Title 7, Annotated Code of Maryland.
(21)
“Professional landscape architect” means a landscape architect duly registered by the State to practice landscape architecture in accordance with the provisions of Business Occupations and Professions Article, Title 9, Annotated Code of Maryland.
(22)
“Professional land surveyor” means a land surveyor duly registered by the State to practice land surveying in accordance with the provisions of Business Occupations and Professions Article, Title 15, Annotated Code of Maryland.
(23)
“Responsible personnel” means any foreman, superintendent, or project engineer who is in charge of on-site clearing and grading operations or the implementation and maintenance of an erosion and sediment control plan.
(24)
“Secretary” means the Secretary of the Environment or designee.
(25)
“Sediment” means soils or other surficial materials transported or deposited by the action of wind, water, ice, gravity, or artificial means.
(26)
“Sediment Control Subtitle” means Environment Article, Title 4, Subtitle 1, Annotated Code of Maryland.
(27)
“State project” means any project that requires an erosion and sediment control plan in accordance with Regulation .05 of this chapter undertaken by a State unit.
(28)
“State unit” means any State agency that intends to or does clear, grade, transport, or otherwise disturb the land or soil surface in the course of its activities.
(29)
“Training program” means an Administration approved educational program for training responsible personnel to:
(a)
Properly implement and maintain erosion and sediment controls associated with grading; and
(b)
Better understand the necessity of minimizing the pollution of the waters of the State that may result from grading.
(30)
“Waters of the State” includes:
(a)
Both surface and underground waters within the boundaries of the State subject to its jurisdiction, including that portion of the Atlantic Ocean within the boundaries of the State, the Chesapeake Bay and its tributaries, and all ponds, lakes, rivers, streams, storm drain systems, public ditches, tax ditches, and public drainage systems within the State, other than those designated and used to collect, convey, or dispose of sanitary sewage; and
(b)
The flood plain of free-flowing waters determined by the Department on the basis of the 100-year flood frequency.

Regulation .02 General Provisions.Copy Citation

A.
The Administration shall be responsible for the implementation and supervision of the erosion and sediment control program established by the Sediment Control Subtitle. This responsibility includes but is not limited to:
(1)
Establishment of policies, procedures, standards, and criteria relating to erosion and sediment control;
(2)
The review and approval of:
(a)
County erosion and sediment control ordinances;
(b)
Municipal erosion and sediment control ordinances;
(c)
The Commission’s erosion and sediment control regulations;
(d)
Erosion and sediment control programs;
(e)
Erosion and sediment control plans for State projects and federal projects;
(f)
Other erosion and sediment control plans, as necessary; and
(g)
Training programs;
(3)
Inspection and enforcement in accordance with this chapter; and
(4)
Determinations on the delegation of enforcement authority in accordance with Regulation .03 of this chapter.
B.
The Administration shall establish matters of policy, procedures, standards, criteria, approvals, and enforcement related to the Sediment Control Subtitle. The practices adopted and used by the soil conservation districts, the Commission, the counties, the municipalities, and State units are to be consistent with the guidelines and regulations adopted by the Administration.
C.
Review and Evaluation.
(1)
The Administration shall periodically conduct a comprehensive review and evaluation to ensure the acceptability of all erosion and sediment control programs operating under the Sediment Control Subtitle and this chapter.
(2)
In conducting the review and evaluation of erosion and sediment control programs, the Administration will use the following guidelines for determining the acceptability of the program:
(a)
An effective erosion and sediment control ordinance or an effective set of erosion and sediment control regulations, which has been approved by the Administration, is in effect;
(b)
The review and approval of erosion and sediment control plans in accordance with the “2011 Maryland Standards and Specification for Soil Erosion and Sediment Control”;
(c)
Approved erosion and sediment control plans that provide:
(i)
Effective erosion and sediment control strategies; and
(ii)
The information necessary to enable the proper installation and maintenance of these strategies; and
(d)
In delegated jurisdictions, inspection and enforcement procedures that ensure:
(i)
Compliance with the approved erosion and sediment control plan; and
(ii)
Timely response to citizen complaints.
(3)
Upon completion of this review and evaluation, the Administration shall submit the findings of the review and evaluation to the appropriate authority.
D.
A building or grading permit may not be issued by a county or municipality prior to erosion and sediment control plan approval unless specifically exempted by the ordinance, the regulation, or this chapter.

Regulation .03 Delegation of Enforcement Authority.Copy Citation

A.
A county, a municipality or the Commission may seek delegation of enforcement authority from the Secretary to enforce compliance with the provisions of the following:
(1)
This chapter;
(2)
An approved erosion control ordinance;
(3)
Approved erosion and sediment control regulations; and
(4)
Approved erosion and sediment control plans.
B.
Delegation.
(1)
The Secretary shall grant delegation of enforcement authority to a county, a municipality, or the Commission which seeks delegation and is found capable of enforcing compliance with the provisions of Regulation .09 of this chapter.
(2)
A county, a municipality, or the Commission seeking or renewing delegation of enforcement authority shall submit a written request to the Secretary on or before October 1 immediately preceding the State fiscal year for which delegation or renewal of delegation is sought.
(3)
The Secretary shall make a determination in writing regarding a delegation request on or before January 1 immediately preceding the State fiscal year for which delegation is sought.
(4)
If delegation is granted, it is effective July 1 of that calendar year and for not more than 2 years, unless renewed by the Secretary.
(5)
The Secretary may suspend delegation if a program falls below the standard of effectiveness established in Regulation .09 of this chapter. During a period of suspension, the Department shall enforce compliance in the jurisdiction.

Regulation .04 Erosion and Sediment Control Ordinances.Copy Citation

A.
Each county and municipality shall adopt an erosion and sediment control ordinance in compliance with the intent and requirements of the Sediment Control Subtitle and the “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control”. Within 6 months of the adoption of this Subtitle, counties and municipalities shall submit ordinances and amendments to the Administration for review. Counties and municipalities shall adopt an approved ordinance within 1 year of this Subtitle’s adoption. Municipalities may adopt the erosion and sediment control ordinance of their respective county.
B.
The Commission shall adopt erosion and sediment control regulations covering utility operations in Prince George’s and Montgomery counties that are in compliance with the intent and requirements of the Sediment Control Subtitle and the “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control”. Within 6 months of the adoption of this subtitle, the Commission shall develop erosion and sediment control regulations in consultation with and subject to the review and approval of the Administration, the Prince George’s Soil Conservation District, and the Montgomery Soil Conservation District as appropriate. The Commission shall adopt approved regulations within one year of this Subtitle’s adoption. The Commission’s erosion and sediment control regulations shall ensure that in addition to meeting the requirements of §C of this regulation, the following shall be included:
(1)
An erosion and sediment control plan must be approved by the Commission before the issuance of a permit; and
(2)
The Commission shall have the primary responsibility for inspection and enforcement of utility construction, if delegation of enforcement authority is granted to the Commission.
C.
In determining the acceptability of an erosion and sediment control ordinance or regulations, the Administration shall consider, but not limit itself to, the following:
(1)
Scope of activities requiring grading and building permits and erosion and sediment control plans;
(2)
Permit and plan requirements including application procedure, plan design requirements, and time limitations;
(3)
Procedures to ensure that a required erosion and sediment control plan is approved by the appropriate approval authority prior to the issuance of a building or grading permit;
(4)
Specific inspection and enforcement procedures and options available to ensure compliance with an approved erosion and sediment control plan, if the Administration has granted delegation of enforcement authority;
(5)
Right of entry for inspection and enforcement activities associated with an approved erosion and sediment control plan; and
(6)
Stabilization requirements in accordance with the provisions of Regulation .07 of this chapter, which are to be binding regardless of whether an approved erosion and sediment control plan has been issued.
D.
After reviewing a county’s or municipality’s erosion and sediment control ordinance or amendments, or the Commission’s erosion and sediment control regulations or amendments, the Administration shall notify the county, municipality, or Commission in writing of the acceptability of the ordinance or the regulations.

Regulation .05 Activities for Which Approved Erosion and Sediment Control Plans Are Required.Copy Citation

A.
Any grading activity requires an erosion and sediment control plan approved by the appropriate approval authority, except for:
(1)
Agricultural land management practices and agricultural best management practices, including those regulated under COMAR 26.17.03; and
(2)
Grading activities that disturb less than 5,000 square feet of land area and disturb less than 100 cubic yards of earth.
B.
A project that involves any combination of private lands, county lands, State lands, or federal lands, such as a utility right-of-way, requires the approval of the approval authority affiliated with the entity undertaking the activity or for whose benefit the activity is being undertaken. Ownership of the land or lands upon which the activity is occurring is not to be the sole factor in determining the approval authority.
C.
Any approval authority may make a written request to the Administration for a joint review of an erosion and sediment control plan.
D.
Any activity pursuant to and in compliance with Environment Article, Title 15, Annotated Code of Maryland, is exempt from the grading unit restriction.
E.
Any activity pursuant to sanitary landfills and in compliance with Environment Article, §9-204, Annotated Code of Maryland, and COMAR 26.04.07.02B(27) is exempt from the grading unit restriction.

Regulation .06 Training and Certification Program.Copy Citation

A.
Certification of Responsible Personnel.
(1)
The Administration shall require certification of responsible personnel as established by the Sediment Control Subtitle and in accordance with this regulation.
(2)
Certification is obtained by completing an Administration-approved training program.
(3)
Certification is valid for 3 years and is automatically renewed unless the Administration notifies the certificate holder that additional training is required.
B.
Interim Certification of Responsible Personnel.
(1)
After July 1, 1983, responsible personnel may receive interim certification prior to the completion of a training program by submitting a request to the Administration.
(2)
Interim certification will be valid until the scheduled date of attendance at a training program.
C.
Training Programs.
(1)
The Administration may approve training programs other than those developed by the Administration. Unless otherwise approved by the Administration, an acceptable training program shall include the following:
(a)
Ecological and resource values of the waters of the State;
(b)
The benefits of proper and effective erosion and sediment control implementation and maintenance;
(c)
The purpose and provisions of State and local erosion and sediment control laws, ordinances, and regulations;
(d)
A description of sediment as a pollutant;
(e)
The process of:
(i)
Erosion;
(ii)
Sediment transport; and
(iii)
Sediment deposition;
(f)
Proper implementation of erosion and sediment control;
(g)
Recognition and correction of improperly implemented erosion and sediment controls;
(h)
Proper maintenance of erosion and sediment controls; and
(i)
Responsibilities of supervisory and enforcement personnel.
(2)
An instructor of a training program shall have a knowledge of the principles of:
(a)
Erosion;
(b)
Sediment transport;
(c)
Sediment deposition;
(d)
Erosion and sediment control technology;
(e)
Erosion and sediment control implementation;
(f)
Erosion and sediment control maintenance;
(g)
Local government erosion and sediment control ordinances; and
(h)
The Sediment Control Subtitle and this chapter.
(3)
An instructor of a training program shall submit the following information to the Administration:
(a)
Names, addresses, and telephone numbers of responsible personnel who complete a training program;
(b)
Card certification numbers issued to responsible personnel; and
(c)
Employer’s name and address.
(4)
Responsible personnel who complete an Administration-approved training program receive a Certificate of Training card with a certification number.

Regulation .07 Application for Approval of Erosion and Sediment Control Plans.Copy Citation

A.
When an approved erosion and sediment control plan is required, an applicant shall make a submittal to the approval authority in accordance with procedures established by the jurisdiction and this chapter, and shall be subject to any fees established under Environment Article, §4-103(c), Annotated Code of Maryland.
B.
At a minimum, a submittal must include:
(1)
A letter of transmittal or application;
(2)
Name, address, and telephone number of:
(a)
The owner of the property where the grading is proposed;
(b)
The developer; and
(c)
The applicant;
(3)
A vicinity map indicating north arrow, scale, and other information necessary to easily locate the property;
(4)
The location of natural resource areas and sensitive areas such as wetlands, floodplains, highly erodible soils, steep slopes, and any other areas required on a concept plan as described in COMAR 26.17.02;
(5)
A general description of the predominant soil types on the site, as described by the appropriate soil survey information available through the soil conservation district from the USDA Natural Resources Soil Conservation Service;
(6)
An erosion and sediment control plan including the following, unless otherwise noted in this chapter:
(a)
Limits of disturbance, including proposed grading units;
(b)
The existing and proposed topography;
(c)
The proposed grading and earth disturbance including:
(i)
Surface area involved;
(ii)
Volume of spoil material; and
(iii)
Volume of borrow material;
(d)
Storm drainage provisions, including:
(i)
Velocities and quantities of flow at outfalls; and
(ii)
Site conditions around points of all surface water discharge from the site;
(e)
Erosion and sediment control provisions to minimize on-site erosion and prevent off-site sedimentation including:
(i)
Provisions to limit disturbance;
(ii)
Details of grading practices including phasing of grading units;
(iii)
Design details for non-structural and structural controls; and
(iv)
Provisions to preserve top soil;
(f)
Details of temporary and permanent stabilization measures including:
(i)
The following statement on the plan: “Following initial soil disturbance or redisturbance, permanent or temporary stabilization is required within three calendar days as to the surface of all perimeter controls, dikes, swales, ditches, perimeter slopes, and all slopes steeper than 3 horizontal to 1 vertical (3:1); and seven calendar days as to all other disturbed areas on the project site except for those areas under active grading.”;
(ii)
Identification of areas requiring accelerated stabilization;
(iii)
Maintenance requirements to ensure that stabilized areas continuously meet the requirements of the “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control”; and
(iv)
Identification of interior areas of surface mines exempted from stabilization requirements to prevent contamination of the recoverable resource by the stabilization material;
(g)
Sequence of construction describing the relationship between the implementation and maintenance of erosion and sediment control practices, including permanent and temporary stabilization, grading units, and the various stages or phases of earth disturbance and construction. At a minimum, a sequence of construction is to include a schedule and time frame for the following activities:
(i)
Clearing and grubbing as necessary for the installation of perimeter controls;
(ii)
Construction and stabilization of perimeter controls;
(iii)
Remaining clearing and grubbing within installed perimeter controls;
(iv)
Road grading;
(v)
Grading for the remainder of the site;
(vi)
Utility installation and connections to existing structures;
(vii)
Final grading, landscaping, and stabilization; and
(viii)
Removal of controls and stabilization of resulting disturbances;
(h)
A statement placed on the plan indicating the owner/developer shall notify the appropriate enforcement authority at the following stages of construction:
(i)
Prior to the start of earth disturbance;
(ii)
Upon completion of the installation of perimeter erosion and sediment controls, but before proceeding with any other earth disturbance or grading; and
(iii)
Prior to the start of another phase of construction or opening of another grading unit; and
(iv)
Prior to the removal of sediment controls; and
(i)
An Owner/Developer Certification stating:
(i)
All clearing, grading, construction, and development will be done pursuant to this plan; and
(ii)
Responsible personnel involved in the construction project will have a Certificate of Training before beginning the project. This Certificate of Training for responsible personnel requirement may be waived by the approval authority on any project involving four or fewer residential units; and
(7)
Any additional information or data deemed appropriate by the approval authority.
C.
The approval authority may require that erosion and sediment control plans receive certification by a professional engineer, land surveyor, landscape architect, architect, or forester (for a forest harvest operation only) registered in the State that they have been designed in accordance with the appropriate approved erosion and sediment control ordinance or regulation, standards, and criteria.
D.
Standard Erosion and Sediment Control Plans.
(1)
An approval authority may adopt a standard erosion and sediment control plan for minor grading, earth disturbance, and construction activities, such as a single-family residence, small commercial and other similar building sites, minor maintenance grading, and minor utility construction.
(2)
A standard erosion and sediment control plan must be consistent with the appropriate county or municipal erosion and sediment control ordinance, the Commission’s erosion and sediment control regulations, and this chapter.
(3)
The Administration shall review and approve a standard plan prior to adoption.
(4)
The following is to be considered during the Administration’s review and approval:
(a)
Volume of grading allowed;
(b)
Disturbed surface area allowed;
(c)
Staging of the clearing and grading operation;
(d)
Depth or height of cut and fill allowed;
(e)
Maximum degree of steepness of any existing slopes;
(f)
Maximum degree of steepness of final graded slopes;
(g)
Proposed manner of handling storm water runoff;
(h)
Proposed manner and timing of temporary and permanent stabilization;
(i)
Proposed erosion and sediment control principles, methods, and practices to be employed; and
(j)
Proposed applications and restricted use of the standard plan, including restrictions on its use in developing subdivisions or contiguous or adjacent areas.
(5)
The Administration shall conduct the review of the standard plan in a timely manner and notify the approval authority in writing of the Administration’s findings.

Regulation .08 Approval or Denial of Erosion and Sediment Control Plans.Copy Citation

A.
Review of Plans.
(1)
The approval authority shall review and approve an erosion and sediment control plan in accordance with the criteria contained in the “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control.”
(2)
The approval authority shall assess the adequacy of the proposed erosion and sediment control measures to minimize erosion and keep sediment on site.
(3)
When appropriate, an on-site evaluation shall be conducted as part of the review process in order to provide proper consideration of existing conditions and proposed control measures.
B.
The approval authority reserves the right to deny approval or impose conditions necessary to prevent:
(1)
A nuisance or dangerous condition;
(2)
Sediment pollution; or
(3)
Adverse impacts to public safety and welfare.
C.
The approval authority may withhold approval when it determines that:
(1)
An owner/developer has not complied with the provisions of an outstanding order; or
(2)
There is a violation of the terms of an existing:
(a)
Grading permit;
(b)
Building permit; or
(c)
Erosion and sediment control plan or related approval, permit, or license.
D.
In jurisdictions that are not delegated, the approval authority shall forward one copy of each approved plan to the Administration upon plan approval.
E.
For plans approved by the Administration:
(1)
Approved plans will be stamped approved;
(2)
The Administration shall send a letter of approval to the owner/developer; and
(3)
A copy of the approved plan will be kept by the Administration.
F.
Expiration of Approved Erosion and Sediment Control Plans.
(1)
Approved erosion and sediment control plans remain valid for 3 years from the date of approval, except surface mines and landfill plans, which remain valid for 5 years from the date of approval.
(2)
Erosion and sediment control plan approvals may be extended or renewed by the approval authority.
G.
Grandfathering of approved plans.
(1)
This chapter applies to all projects that do not have final approval for erosion and sediment control plans by January 9, 2013.
(2)
A plan that has received final approval by January 9, 2013 may be reapproved under its existing conditions if grading activities have begun on the site by January 9, 2015, with the exception of stabilization requirements.
(3)
Stabilization practices on all projects must be in compliance with the requirements of this chapter by January 9, 2013, regardless of when an erosion and sediment control plan was approved.

Regulation .09 Inspection and Enforcement.Copy Citation

A.
The Administration shall be responsible for the inspection and enforcement of all grading that requires an approved erosion and sediment control plan as designated within this chapter.
B.
When the Administration has delegated enforcement authority to a county, a municipality, or the Commission, the county, municipality or Commission shall have the primary responsibility for inspection and enforcement as designated by an approved erosion and sediment control ordinance or erosion and sediment control regulations.
C.
An approved erosion and sediment control plan for an active site is to be on-site and available to the appropriate enforcement authority and the Administration.
D.
The appropriate enforcement authority shall inspect sites with an approved erosion and sediment control plan for compliance with the approved plan.
E.
When conducting an inspection, the appropriate enforcement authority shall:
(1)
Ensure that an approved erosion and sediment control plan and permits are on the site as required;
(2)
Conduct a complete inspection of the site unless otherwise indicated;
(3)
Prepare a written inspection report that includes:
(a)
The date and location of this site inspection;
(b)
Whether the approved plan has been properly implemented and maintained;
(c)
Practice deficiencies or erosion and sediment control plan deficiencies;
(d)
If a violation exists, the type of enforcement action taken; and
(e)
If applicable, a description of minor or major modifications as described in this regulation; and
(4)
Notify the on-site personnel and the owner/developer in writing when violations are observed, describing the:
(a)
Nature of the violation;
(b)
Required corrective action; and
(c)
Time period in which to have the violation corrected.
F.
Complaints.
(1)
The appropriate enforcement authority shall accept and investigate complaints regarding erosion and sediment control concerns from any interested party and:
(a)
Conduct an initial investigation within 3 working days of receipt of the complaint;
(b)
Notify the complainant of the initial investigation and findings within 7 days of receipt of the complaint; and
(c)
Take appropriate action when violations are discovered during the course of the complaint investigation.
(2)
The Administration may investigate complaints received and take appropriate action or refer complaints received to the appropriate enforcement authority.
(3)
The Administration shall notify the appropriate enforcement authority in a timely manner when investigating a complaint in a delegated jurisdiction.
G.
A county, a municipality, or the Commission may request enforcement assistance from the Administration on any site.
H.
Plan Modifications.
(1)
Modifications to an approved erosion and sediment control plan may be requested by the owner/developer or required by the appropriate approval or enforcement authority.
(2)
Modifications must be made in accordance with the erosion and sediment control criteria contained in the “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control” and the criteria for major and minor modifications.
(3)
Major Modifications.
(a)
Major modifications include revisions to sediment control practices involving concentrated flow or impoundments, such as a sediment basin or trap. Major modifications also include significant changes to the sequence of construction or to the phasing of grading units.
(b)
Major modifications must be approved by the approval authority prior to implementation.
(4)
Minor Modifications
(a)
The approval authority may, in conjunction with the appropriate enforcement authority, develop a list of minor modifications.
(b)
The Administration shall review and approve all minor modification lists.
(c)
The appropriate enforcement authority may allow the implementation of minor modifications as field revisions.
(d)
The appropriate enforcement authority shall, in writing, approve field revisions prior to their implementation.
I.
Enforcement.
(1)
The appropriate enforcement authority shall, through the authority of an erosion and sediment control ordinance or regulations, this chapter, and the Sediment Control Subtitle, use enforcement action when erosion and sediment control violations occur.
(2)
Enforcement actions may include, but are not limited to:
(a)
Issuance of a corrective action order;
(b)
Issuance of a stop work order, the extent of which is determined by the appropriate enforcement authority;
(c)
Issuance of a penalty or fine as allowed; and
(d)
Referral for legal action.
(3)
In addition to any other sanctions, a person in violation of any provision of the Sediment Control Subtitle or this chapter is subject to civil action or criminal prosecution as deemed necessary.
(4)
Any step in the enforcement process may be taken at any time, depending upon the severity of the violation.
(5)
The appropriate enforcement authority shall stop work on a site where grading is occurring without a required erosion and sediment control plan.
J.
Suspension of Approval.
(1)
The approval authority may suspend approval of an erosion and sediment control plan.
(2)
When an erosion and sediment control plan is suspended:
(a)
Stabilization is required of all disturbed areas on the project site; and
(b)
Grading, building, and other permits related to the project will also be suspended.

Regulation .10 Responsibility of Applicant.Copy Citation

The issuance of an approval by the approval authority does not relieve the applicant of the continuing responsibility to effectively abate sediment pollution and comply with all other applicable local and State laws.

Regulation .11 Sediment Control Design Standards and Specifications.Copy Citation

A.
The handbook titled “2011 Maryland Standards and Specifications for Soil Erosion and Sediment Control” as amended by Supplement 1 is hereby incorporated by reference by the Administration, and shall serve as the official guide for erosion and sediment control principles, methods, and practices.
B.
Notwithstanding any other requirement in this chapter, the Administration may require the use of any standard and specification or best management practice it deems warranted to address an erosion and sediment control violation.

Chapter 02. Stormwater Management

Regulation .01 Purpose and Scope.Copy Citation

A.
The primary goals of the State and local stormwater management programs are to maintain after development, as nearly as possible, the predevelopment runoff characteristics, and to reduce stream channel erosion, pollution, siltation and sedimentation, and local flooding by implementing environmental site design to the maximum extent practicable and using appropriate structural best management practices only when necessary.
B.
These regulations for stormwater management apply to the development or redevelopment of land for residential, commercial, industrial, or institutional use, but do not apply to agricultural land management practices. This chapter specifies the minimum content of county and municipal ordinances, responsibilities of the Administration regarding the review of the county and municipal stormwater management programs, and approval of State-constructed projects for stormwater management by the Department of the Environment.
C.
This chapter applies to all new development and redevelopment projects that do not have final approval for erosion and sediment control and stormwater management plans by May 4, 2010.
D.
The provisions of these regulations may not be construed to affect the requirements for a project located in an Intensely Developed Area of the Chesapeake and Atlantic Coastal Bays Critical Area to comply with the 10 percent Pollution Reduction Requirement under COMAR 27.01.02.03D(3).

Regulation .01-1 Incorporation by Reference.Copy Citation

A.
In this chapter, the following documents are incorporated by reference.
B.
Documents Incorporated.
(1)
The 2000 Maryland Stormwater Design Manual, Volumes I & II (Maryland Department of the Environment, April 2000), Supplement 1, is incorporated by reference by the Administration and shall serve as the official guide for stormwater management principles, methods, and practices.
(2)
USDA Natural Resources Conservation Service Maryland Conservation Practice Standard Pond Code 378 (January 2000).
(3)
40 CFR §122.26(b)(14)(i)—(xi).

Regulation .01-2 Grandfather Provisions.Copy Citation

A.
In this regulation, the following terms have the meanings indicated:
(1)
Administrative Waiver.
(a)
“Administrative waiver” means a decision by the approving agency pursuant to this regulation to allow the construction of a development to be governed by the stormwater management ordinance in effect as of May 4, 2009, in the local jurisdiction where the project will be located.
(b)
“Administrative waiver” is distinct from a waiver granted pursuant to Regulation .05C of this chapter.
(2)
Approval.
(a)
“Approval” means a documented action by a county or municipality following a review to determine and acknowledge the sufficiency of submitted material to meet the requirements of a specified stage in a local development review process.
(b)
“Approval” does not mean an acknowledgement by the approving agency that submitted material has been received for review.
(3)
Final Project Approval.
(a)
“Final project approval” means approval of the final stormwater management plan and erosion and sediment control plan required to construct a project's stormwater management facilities.
(b)
“Final project approval” includes securing bonding or financing for final development plans if either is required as a prerequisite for approval.
(4)
“Preliminary project approval” means an approval as part of a local preliminary development or planning review process that includes, at a minimum:
(a)
The number of planned dwelling units or lots;
(b)
The proposed project density;
(c)
The proposed size and location of all land uses for the project;
(d)
A plan that identifies:
(i)
The proposed drainage patterns;
(ii)
The location of all points of discharge from the site; and
(iii)
The type, location, and size of all stormwater management measures based on site-specific stormwater management requirement computations; and
(e)
Any other information required by the approving agency including, but not limited to:
(i)
The proposed alignment, location, and construction type and standard for all roads, access ways, and areas of vehicular traffic;
(ii)
A demonstration that the methods by which the development will be supplied with water and wastewater service are adequate; and
(iii)
The size, type, and general location of all proposed wastewater and water system infrastructure.
B.
An approving agency may grant an administrative waiver to a development that received a preliminary project approval prior to May 4, 2010. Administrative waivers expire according to §C of this regulation and may be extended according to §D of this regulation.
C.
Expiration of Administrative Waivers.
(1)
Except as provided for in §D of this regulation, an administrative waiver shall expire on:
(a)
May 4, 2013, if the development does not receive final project approval prior to that date; or
(b)
May 4, 2017, if the development receives final project approval prior to May 4, 2013.
(2)
All construction authorized pursuant to an administrative waiver must be completed by May 4, 2017, or, if the waiver is extended as provided in §D of this regulation, by the expiration date of the waiver extension.
D.
Extension of Administrative Waivers.
(1)
Except as provided in §D(2) of this regulation, an administrative waiver shall not be extended.
(2)
An administrative waiver may only be extended if, by May 4, 2010, the development:
(a)
Has received a preliminary project approval; and
(b)
Was subject to a Development Rights and Responsibilities Agreement, a Tax Increment Financing approval, or an Annexation Agreement.
(3)
Administrative waivers extended according to §D(2) of this regulation shall expire when the Development Rights and Responsibilities Agreement, the Tax Increment Financing approval, or the Annexation Agreement expires.

Regulation .02 Definitions.Copy Citation

A.
The following definitions describe the meaning of terms used in this chapter and the 2000 Maryland Stormwater Design Manual, Volumes I & II. The definitions will be valid unless the context in which they are used clearly requires a different meaning. Terms not defined below shall have the meanings given to them in the relevant statutes or, if not defined in statutes, the meanings attributed by common use. The definitions for these terms are provided below as a convenience, but persons affected by the Department's regulations should be aware that these definitions are subject to amendment by the General Assembly.
B.
In this chapter, the following terms have the meanings indicated.
(1)
“Administration” means the Water Management Administration.
(2)
“Agricultural land management practices” means those methods and procedures used in the cultivation of land in order to further crop and livestock production and conservation of related soil and water resources.
(3)
“Approving agency” means the entity responsible for review and approval of stormwater management plans.
(4)
“Aquifer” means a porous water-bearing geologic formation generally restricted to materials capable of yielding an appreciable supply of water.
(5)
“Best management practice (BMP)” means a structural device or nonstructural practice designed to temporarily store or treat stormwater runoff in order to mitigate flooding, reduce pollution, and provide other amenities.
(6)
“Channel protection storage volume” means the volume used to design structural management practices to control stream channel erosion. Methods for calculating the channel protection storage volume are specified in the 2000 Maryland Stormwater Design Manual, Volumes I & II.
(7)
“Concept plan” means the first of three required plan approvals that includes the information necessary to allow an initial evaluation of a proposed project.
(8)
“Department” means the Department of the Environment.
(9)
“Design Manual” means the 2000 Maryland Stormwater Design Manual, Volumes I & II, that serves as the official guide for stormwater management principles, methods, and practices.
(10)
“Detention structure” means a permanent structure for the temporary storage of runoff which is designed so as not to create a permanent pool of water.
(11)
“Develop land” means to change the runoff characteristics of a parcel of land in conjunction with residential, commercial, industrial, or institutional construction or alteration.
(12)
“Direct discharge” means the concentrated release of stormwater to tidal waters or vegetated tidal wetlands from new development or redevelopment projects in the Critical Area.
(13)
“Direct runoff” means the flow of rainwater, snowmelt, or spring flow over the land surface toward stream channels.
(14)
“Drainage area” means that area contributing runoff to a single point measured in a horizontal plane, which is enclosed by a ridge line.
(15)
Environmental Site Design.
(a)
“Environmental site design (ESD)” means using small-scale stormwater management practices, nonstructural techniques, and better site planning to mimic natural hydrologic runoff characteristics and minimize the impact of land development on water resources.
(b)
“Environmental site design (ESD)” design methods are specified in the Design Manual.
(16)
“Extended detention” means a stormwater design feature that provides gradual release of a volume of water in order to increase settling of pollutants and protect downstream channels from frequent storm events. Methods for designing extended detention BMPs are specified in the Design Manual.
(17)
“Extreme flood volume” means the storage volume required to control those infrequent but large storm events in which overbank flows reach or exceed the boundaries of the 100-year floodplain.
(18)
“Final stormwater management plan” means the last of three required plan approvals that includes the information necessary to allow all approvals and permits to be issued by the appropriate authority.
(19)
“Flow attenuation” means prolonging the flow time of runoff to reduce the peak discharge.
(20)
“Impervious area” means any surface that does not allow stormwater to infiltrate into the ground.
(21)
“Infiltration” means the passage or movement of water into the soil surface.
(22)
“Maximum extent practicable (MEP)” means designing stormwater management systems so that all reasonable opportunities for using ESD planning techniques and treatment practices are exhausted and, only where absolutely necessary, a structural BMP is implemented.
(23)
“Off-site stormwater management” means the design and construction of a facility necessary to control stormwater from more than one development.
(24)
“On-site stormwater management” means the design and construction of systems necessary to control stormwater within an immediate development.
(25)
“Overbank flood protection volume” means the volume controlled by structural practices to prevent an increase in the frequency of out-of-bank flooding generated by development. Methods for calculating the overbank flood protection volume are specified in the Design Manual.
(26)
“Person” means the federal government, the State, any county, municipal corporation, or other political subdivision of the State, or any of their units, or an individual, receiver, trustee, guardian, executor, administrator, fiduciary, or representative of any kind, or any partnership, firm, association, public or private corporation, or any other entity.
(27)
“Planning techniques” means a combination of strategies employed early in project design to reduce impact from development and to incorporate natural features into a stormwater management plan.
(28)
“Recharge volume” means that portion of the water quality volume used to maintain ground water recharge rates at development sites. Methods for calculating the recharge volume are specified in the Design Manual.
(29)
“Redevelopment” means any construction, alteration, or improvement performed on sites where existing land use is commercial, industrial, institutional, or multifamily residential and the existing site impervious area exceeds 40 percent.
(30)
“Retention structure” means a permanent structure that provides for the storage of runoff by means of a permanent pool of water.
(31)
“Retrofitting” means the construction of a structural BMP in a previously developed area, the modification of an existing structural BMP, or the implementation of a nonstructural practice to improve water quality over current conditions.
(32)
“Sediment” means soils or other surficial materials transported or deposited by the action of wind, water, ice, or gravity as a product of erosion.
(33)
“Site” means any tract, lot, parcel of land, or combination of tracts, lots, parcels of land that are in one ownership, or are contiguous and in diverse ownership where development is to be performed as part of a unit, subdivision, or project.
(34)
“Site development plan” means the second of three required plan approvals that includes the information necessary to allow a detailed evaluation of a proposed project.
(35)
“Stormwater” means water that originates from a precipitation event.
(36)
“Stormwater management” means, for:
(a)
Quantitative control, a system of vegetative and structural measures that control the increased volume and rate of surface runoff caused by man-made changes to the land; and
(b)
Qualitative control, a system of vegetative, structural, and other measures that reduce or eliminate pollutants that might otherwise be carried by surface runoff.
(37)
“Stormwater Management Subtitle” means Environment Article, Title 4, Subtitle 2, Annotated Code of Maryland and cumulative supplement.
(38)
“Stormwater management system” means natural areas, ESD practices, stormwater management measures, and any other structure through which stormwater flows, infiltrates, or discharges from a site.
(39)
“Water quality volume” means the volume needed to capture and treat 90 percent of the average annual runoff volume at a development site. Methods for calculating the water quality volume are specified in the Design Manual.
(40)
“Watershed” means the total drainage area contributing runoff to a single point.

Regulation .03 General Provisions.Copy Citation

A.
The Administration is responsible for implementing and supervising the stormwater management program which is established by the Stormwater Management Subtitle. This responsibility shall include, but is not limited to:
(1)
Establishing policies, procedures, standards, model ordinances, and criteria relating to stormwater management;
(2)
Reviewing and approving:
(a)
County stormwater management ordinances,
(b)
Municipal stormwater management ordinances,
(c)
Stormwater management program implementation and operation, and
(d)
Stormwater management plans for State and federal construction projects which shall be subject to the requirements of this chapter;
(3)
Inspecting and enforcing stormwater management on all State and federal construction projects which shall be subject to the requirements of this chapter;
(4)
Inspection and enforcement in conjunction with local governmental authorities;
(5)
Developing guidelines and regulations;
(6)
Assisting local jurisdictions with improving and maintaining their technical capabilities regarding:
(a)
Hydrologic and hydraulic analyses,
(b)
Utilization of State adopted standards and specifications for stormwater management, and
(c)
Stormwater management plan review;
(7)
Training assistance to local jurisdictions for construction and maintenance inspections of stormwater management systems;
(8)
Developing public educational programs; and
(9)
Evaluating the effectiveness of stormwater control measures in eliminating adverse stream quality impacts.
B.
Matters of policy, procedures, standards, criteria, approvals, inspection, and enforcement relating to the Stormwater Management Subtitle shall be established by the Administration subject to the jurisdiction of the Secretary of the Environment. The stormwater management programs which are adopted by the counties and municipalities shall include stormwater management criteria consistent with the standards, procedures, and regulations of the Administration. A variation of requirements by a county or municipality on a specific watershed may not be valid unless approved by the Administration. All State and federal development in the watershed shall be reviewed subject to the same variations and requirements by the Administration.
C.
Inspection and Review.
(1)
Initially, and at least once every 3 years after that, the Administration shall inspect and review the stormwater management programs of the counties and municipalities and evaluate the effectiveness of the programs.
(2)
To be found acceptable, a stormwater management program shall have:
(a)
An Administration-approved stormwater management ordinance in effect;
(b)
Stormwater management planning and approval processes that provide:
(i)
Stormwater management for every land development subject to this chapter;
(ii)
The implementation of ESD to the MEP; and
(iii)
The ability and the information necessary to review adequately proposed installation and maintenance measures for stormwater management;
(c)
Inspection and enforcement procedures that ensure the proper construction and maintenance of approved stormwater management measures.
(3)
Upon completion of its review and evaluation, the Administration shall submit the findings within 30 days to the appropriate governing authority. The Administration shall also publish the results of the periodic reviews in one document and conduct a public informational meeting concerning the reviews.
D.
If a county or municipality is found not to have an acceptable stormwater management program, the Department may:
(1)
Issue an order requiring that necessary corrective action be taken within a reasonably prescribed time; or
(2)
Impose other sanctions as authorized by law.
E.
In order to assure that Administration-approved programs reflect the policies established in the Design Manual, each county or municipality shall submit proposed revisions to its ordinance to the Administration by November 11, 2009. Each county and municipality shall adopt a revised ordinance by May 4, 2010, in order to require that all new development and redevelopment projects implement the policies and practices established in the Design Manual. Descriptions of other program elements shall be submitted as requested by the Administration.

Regulation .04 Stormwater Management Ordinances.Copy Citation

A.
Each county and municipality shall adopt ordinances necessary to implement a stormwater management program. Subsequently, counties and municipalities shall submit any proposed amendments to the Administration for review and approval. By joint action with the county, a municipality may adopt the stormwater management ordinance of its respective county.
B.
Each local ordinance shall provide for:
(1)
A comprehensive stormwater management plan review and approval process that:
(a)
Considers all aspects of project planning, design, and construction from initial conception through final approval;
(b)
Requires the submission, review, and approval of interim plans at an increasing level of detail for specific stages of project development;
(c)
Provides for coordinated input for all plans from all appropriate agencies including, but not limited to, soil conservation districts and departments of planning, zoning, public works, and environmental protection; and
(d)
Requires implementation of ESD to the MEP;
(2)
Exemptions and waivers;
(3)
Criteria and procedures for stormwater management;
(4)
Proper implementation of stormwater management in accordance with the approved plan;
(5)
Maintenance responsibilities and requirements including periodic inspection; and
(6)
Penalties for noncompliance with the ordinances including suspension of construction activities when appropriate.

Regulation .05 When Stormwater Management is Required.Copy Citation

A.
Unless the particular activity is exempted by this regulation, a person may not develop any land without an approved final stormwater management plan from the approving agency. A grading or building permit may not be issued for a property unless a final stormwater management plan has been approved that is consistent with:
(1)
The Stormwater Management Subtitle;
(2)
This chapter;
(3)
The county or municipal ordinance.
(4)
The Design Manual for new development; and
(5)
Policies established by the local approving agency for redevelopment.
B.
The following activities are exempt from the provisions of this chapter:
(1)
Additions or modifications to existing single family detached residential structures if they comply with §B(2) of this regulation;
(2)
Any developments that do not disturb over 5,000 square feet of land area; and
(3)
Land development activities which the Administration determines will be regulated under specific State laws which provide for managing stormwater runoff.
C.
Waivers.
(1)
County and municipal ordinances may contain waiver policies for individual developments if the ordinances are approved by the Administration. The Administration will approve county and municipal ordinances and waiver policies if:
(a)
They reasonably ensure that a development will not adversely impact stream quality;
(b)
Waiver decisions are made on a case-by-case basis; and
(c)
The cumulative effects of the waiver policy are evaluated.
(2)
Except as provided in §C(3) and (5) of this regulation, stormwater management quantitative control waivers shall be granted only to those projects within areas where watershed management plans have been developed consistent with §E of this regulation.
(3)
Except as provided in §C(5) of this regulation, if watershed management plans consistent with §E of this regulation have not been developed, stormwater management quantitative control waivers may be granted to projects:
(a)
That have direct discharges to tidally influenced receiving waters;
(b)
That are in-fill development located in a Priority Funding Area where the economic feasibility of the project is tied to the planned density, and where implementation of the 2009 regulatory requirements would result in a loss of the planned development density provided that:
(i)
Public water and sewer and stormwater conveyance exist;
(ii)
The quantitative waiver is applied to the project for the impervious cover that previously existed on the site only;
(iii)
ESD to the MEP is used to meet the full water quality treatment requirements for the entire development; and
(iv)
ESD to the MEP is used to provide full quantity control for all new impervious surfaces; or
(c)
When the approving agency determines that circumstances exist that prevent the reasonable implementation of quantity control practices.
(4)
Except as provided in §C(5) of this regulation, stormwater management qualitative control waivers apply only to:
(a)
In-fill development projects where stormwater management implementation is not feasible;
(b)
Redevelopment projects if the requirements of §D of this regulation are satisfied; or
(c)
Sites where the approving agency determines that circumstances exist that prevent the reasonable implementation of quality control practices.
(5)
Stormwater management quantitative and qualitative control waivers may be granted for phased development projects if a system designed to meet the 2000 regulatory requirements and local ordinances for multiple phases has been constructed by May 4, 2010. If the 2009 regulatory requirements cannot be met for future phases constructed after May 4, 2010, all reasonable efforts to incorporate ESD in future phases must be demonstrated.
D.
Redevelopment.
(1)
An approving agency shall require that stormwater management be addressed for redevelopment. Unless otherwise specified by watershed management plans developed according to §E of this regulation, all redevelopment project designs shall do one of the following:
(a)
Reduce existing impervious area within the limit of disturbance by at least 50 percent according to the Design Manual;
(b)
Implement ESD to the MEP to provide water quality treatment for at least 50 percent of the existing impervious area within the limit of disturbance; or
(c)
Use a combination of both §D(1)(a) and (b) of this regulation for at least 50 percent of the existing site impervious area.
(2)
Alternative stormwater management measures may be used to meet the requirements in §D(1) of this regulation if the developer satisfactorily demonstrates to the approving agency that impervious area reduction and ESD have been implemented to the MEP. Alternative stormwater management measures include, but are not limited to:
(a)
An on-site structural BMP;
(b)
An off-site structural BMP to provide water quality treatment for an area equal to or greater than 50 percent of the existing impervious area; or
(c)
A combination of impervious area reduction, ESD implementation, and an on-site or off-site structural BMP for an area equal to or greater than 50 percent of the existing site impervious area within the limit of disturbance.
(3)
An approving agency may develop separate policies for providing water quality treatment for redevelopment projects if the requirements of §D(1) and (2) of this regulation cannot be met. Any separate redevelopment policy shall be reviewed and approved by the Administration and may include, but not be limited to:
(a)
A combination of ESD and an on-site or off-site structural BMP;
(b)
Retrofitting including existing BMP upgrades, filtering practices, and off-site ESD implementation;
(c)
Participation in a stream restoration project;
(d)
Pollution trading with another entity;
(e)
Design criteria based on watershed management plans developed according to §E of this regulation;
(f)
Payment of a fee-in-lieu; or
(g)
A partial waiver of the treatment requirements if ESD is not practicable.
(4)
The determination of what alternative stormwater management measures will be available may be made by the approving agency at the appropriate point in the development review process. Counties and municipalities shall consider the prioritization of alternative measures in §D(3) of this regulation after it has been determined that it is not practicable to meet the 2009 regulatory requirements using ESD. In deciding what alternative measures may be required, an approving agency may consider factors including, but not limited to:
(a)
Whether the project is in an area targeted for development incentives such as a Priority Funding Area, a designated Transit Oriented Development area, or a designated Base Realignment and Closure Revitalization and Incentive Zone;
(b)
Whether the project is necessary to accommodate growth consistent with comprehensive plans; or
(c)
Whether bonding and financing have already been secured based on an approved development plan.
(5)
Stormwater management shall be addressed according to the new development requirements in the Design Manual for any net increase in impervious area.
(6)
The recharge, channel protection storage volume, and overbank flood protection volume requirements specified in the Design Manual do not apply to redevelopment projects unless specified by the approving agency.
(7)
On-site or off-site channel protection storage volume requirements as specified in the Design Manual may be imposed if watershed management plans developed according to §E of this regulation indicate that downstream flooding or erosion need to be addressed.
(8)
Variations of this redevelopment policy shall be approved by the Administration.
E.
An approving agency may develop quantitative waiver and redevelopment provisions for stormwater management that differ from the requirements of this chapter. These provisions shall be developed only as part of an overall watershed management plan. Watershed management plans developed for the purposes of implementing different stormwater management policies for waivers and redevelopment shall:
(1)
Include detailed hydrologic and hydraulic analyses to determine hydrograph timing;
(2)
Evaluate both quantity and quality management;
(3)
Include cumulative impact assessment of watershed development;
(4)
Identify existing flooding and receiving stream channel conditions;
(5)
Be conducted at a scale determined by the approving agency; and
(6)
Specify where on-site or off-site quantitative and qualitative stormwater management practices are to be implemented.

Regulation .06 Minimum Control Requirements.Copy Citation

A.
County and Municipal Requirements.
(1)
The minimum control requirements established in this section and the Design Manual shall be contained in each county and municipal ordinance as they apply to the applicable parts of the State. The minimum control requirements for each county and municipality are provided in §A(2) and (3) of this regulation.
(2)
All counties and their incorporated municipalities shall require that the planning techniques, nonstructural and structural practices, and design methods specified in the Design Manual be used to implement ESD to the MEP. Stormwater management plans for development projects subject to this chapter shall be designed using the ESD sizing criteria, recharge volume, water quality volume, and channel protection storage volume criteria according to the Design Manual. The MEP standard is met when channel stability and 100 percent of the average annual predevelopment groundwater recharge are maintained, nonpoint source pollution is minimized, and structural stormwater management practices are used only if determined to be absolutely necessary.
(3)
Control of the 2-year frequency storm event, 10-year frequency storm event, or both is required according to the Design Manual if any county or municipality determines that additional stormwater management is necessary because historical flooding problems exist and downstream floodplain development and conveyance system design cannot be controlled.
(4)
An approving agency may require more than the minimum control requirements specified in this regulation if hydrologic or topographic conditions warrant or if flooding, stream channel erosion, or water quality problems exist downstream from a proposed project.
B.
Alternate minimum control requirements may be adopted subject to Administration approval. The Administration shall require a demonstration that alternative requirements will implement ESD to the MEP and control flood damages, accelerated stream erosion, water quality, and sedimentation, including, if necessary, address comprehensive watershed studies.
C.
Development in watersheds designated as interjurisdictional flood hazard watersheds within this chapter may not increase the downstream peak discharge for the 100-year frequency storm event and shall comply with flood management plans as approved by the Department in accordance with the Flood Hazard Management Act of 1976 (Environment Article, Title 5, Subtitle 8, Annotated Code of Maryland).

Regulation .07 Interjurisdictional Flood Hazard Watersheds.Copy Citation

A.
The watersheds specified in this regulation are interjurisdictional in nature and have documented flood damages to residential, commercial, industrial, or institutional structures. Development in the interjurisdictional flood hazard watershed may not increase the downstream peak discharge for the 100-year frequency storm event. Additionally, development shall comply with flood management plans as approved by the Department in accordance with the Flood Hazard Management Act of 1976 (Environment Article, Title 5, Subtitle 8, Annotated Code of Maryland). The following watersheds and all their tributaries are designated as interjurisdictional flood hazard watersheds:
(1)
Carroll Creek in Frederick City and Frederick County;
(2)
Gwynns Falls in Baltimore City and Baltimore County; and
(3)
Jones Falls in Baltimore City and Baltimore County.
B.
The Administration shall periodically review watersheds to be included as interjurisdictional flood hazard watersheds for the purposes of this chapter. Any additional interjurisdictional watershed to be designated will be considered with respect to the:
(1)
Economic losses due to flood damages;
(2)
Expected upstream development;
(3)
Frequency of flooding;
(4)
Number and value of structures flooded; and
(5)
Threat to life.

Regulation .08 Stormwater Management Measures.Copy Citation

A.
The ESD planning techniques and practices and structural stormwater management measures established in this regulation and the Design Manual shall be contained in all county and municipal ordinances. Each ordinance shall require that a developer demonstrate that ESD has been implemented to the MEP and, only where absolutely necessary, is a structural BMP used in developing a stormwater management plan.
B.
ESD Planning Techniques and Practices.
(1)
The following planning techniques shall be applied according to the Design Manual to satisfy the minimum control requirements established in Regulation .06 of this chapter:
(a)
Preserving and protecting natural resources;
(b)
Conserving natural drainage patterns;
(c)
Minimizing impervious area;
(d)
Reducing runoff volume;
(e)
Using ESD practices to maintain 100 percent of the average annual predevelopment groundwater recharge volume for the site;
(f)
Using green roofs, permeable pavement, reinforced turf, and other alternative surfaces;
(g)
Limiting soil disturbance, mass grading, and compaction;
(h)
Clustering development; and
(i)
Any practices approved by the Administration.
(2)
The following ESD treatment practices shall be designed according to the Design Manual to satisfy the minimum control requirements established in Regulation .06 of this chapter:
(a)
Disconnection of rooftop runoff;
(b)
Disconnection of nonrooftop runoff;
(c)
Sheetflow to conservation areas;
(d)
Rainwater harvesting;
(e)
Submerged gravel wetlands;
(f)
Landscape infiltration;
(g)
Infiltration berms;
(h)
Dry wells;
(i)
Micro-bioretention;
(j)
Rain gardens;
(k)
Swales;
(l)
Enhanced filters; and
(m)
Any practices approved by the Administration.
(3)
The use of the ESD planning techniques and treatment practices specified in this section may not conflict with existing State law or local ordinances, regulations, or policies. Counties and municipalities shall modify planning and zoning ordinances and public works codes to eliminate any impediments to implementing ESD to the MEP according to the Design Manual.
C.
Structural Stormwater Management Measures.
(1)
The following structural stormwater management practices shall be designed according to the Design Manual to satisfy the applicable minimum control requirements established in Regulation .06 of this chapter:
(a)
Stormwater management ponds;
(b)
Stormwater management wetlands;
(c)
Stormwater management infiltration;
(d)
Stormwater management filtering systems; and
(e)
Stormwater management open channel systems.
(2)
The performance criteria specified in the Design Manual with regard to general feasibility, conveyance, pretreatment, treatment and geometry, environment and landscaping, and maintenance shall be considered when selecting structural stormwater management practices.
(3)
Structural stormwater management practices shall be selected to accommodate the unique hydrologic or geologic regions of the State.
D.
Standard Plans.
(1)
Compliance with any of the following Standard Plans is considered to satisfy the minimum control requirements established in Regulation .06A(2) of this chapter.
(2)
Standard Plans. The following documents are incorporated by reference:
(a)
Standard Stormwater Management Plan for Agricultural Structures (SSDS — SP01);
(b)
Standard Stormwater Management Plan for Poultry House Development on Maryland’s Eastern Shore (SSDS — SP02); and
(c)
Standard Stormwater Management Plan for Single Lot Residential Construction (SSDS — SP03).
(3)
Compliance with an approved Soil Conservation and Water Quality Plan (SCWQP) is considered to satisfy the minimum control requirements established in Regulation .06A(2) of this chapter if the development:
(a)
Is an agricultural structure, or associated access roads and parking areas;
(b)
Complies with USDA Natural Resources Conservation Service Maryland Conservation Practice Standard Stormwater Runoff Control Code 570 (March 2013);
(c)
Is not located within the Chesapeake and Atlantic Coastal Bays Critical Area; and
(d)
Is not subject to the requirements of:
(i)
COMAR 26.08.04.09A;
(ii)
COMAR 26.08.04.09N; or
(iii)
COMAR 26.17.04.05.
(4)
An approving agency may require more than the minimum control measures. An approving agency may require that an engineered stormwater management plan be submitted if:
(a)
Otherwise required by statute or regulation;
(b)
The plan fails to meet ESD to the MEP;
(c)
Hydrologic or topographic conditions warrant; or
(d)
Flooding, stream channel erosion, or water quality problems exist downstream from a proposed project.
E.
County and municipal ordinances shall specify that the ESD planning techniques and treatment practices and structural stormwater management measures used to satisfy the minimum control requirements in Regulation .06 of this chapter are documented and remain unaltered by subsequent property owners. Approval from the appropriate approving agency should be obtained before any stormwater management practice is altered.
F.
Alternative ESD planning techniques and treatment practices and structural stormwater management measures may be used for new development runoff control if they meet the performance criteria established in the Design Manual and are approved by the Administration. Practices used for redevelopment projects shall be approved by the appropriate approving agency.
G.
For purposes of modifying the minimum control requirements or design criteria, the owner/developer shall submit to the approving agency an analysis of the impacts of stormwater flows downstream in the watershed. The analysis shall include hydrologic and hydraulic calculations necessary to determine the impact of hydrograph timing modifications of the proposed development upon a dam, highway, structure, or natural point of restricted streamflow, established with the concurrence of the approving agency, downstream of the first downstream tributary whose drainage area equals or exceeds the contributing area to the project or stormwater management facility.

Regulation .09 Stormwater Management Plans.Copy Citation

A.
The design of stormwater management plans shall be prepared by any individual whose qualifications are acceptable to the approving agency. The approving agency may require that the design be prepared by either a professional engineer, professional land surveyor, or landscape architect licensed in the State, as necessary to protect the public or the environment. If a stormwater BMP requires either a dam safety permit from the Department or small pond approval by the appropriate soil conservation district, the approving agency shall require that the design be prepared by a professional engineer licensed in the State.
B.
Stormwater management and development plans shall be consistent with adopted and approved watershed management plans or flood management plans as approved by the Department in accordance with the Flood Hazard Management Act of 1976 (Environment Article, Title 5, Subtitle 8, Annotated Code of Maryland).
C.
An operation and maintenance plan shall be required as a condition of stormwater management plan approval.
D.
If a stormwater management plan involves direction of some or all runoff off of the site, it is the responsibility of the developer to obtain from adjacent property owners any easements or other necessary property interests concerning flowage of water. Approval of a stormwater management plan does not create or affect any right to direct runoff onto adjacent property without that property owner's permission.
E.
Contents and Submission of Stormwater Management Plans.
(1)
The owner/developer is responsible for submitting phased stormwater management plans for development projects according to the comprehensive review and approval process specified in Regulation .04 of this chapter, the Design Manual, and county and municipal stormwater management ordinances. Plans shall be submitted for the concept, site development, and final stormwater management construction phases of project design. Comments from the appropriate approval authority shall be addressed and approval received at each phase of project design before subsequent submissions.
(2)
The owner/developer shall submit a concept plan that provides sufficient information for an initial assessment of the proposed project and whether stormwater management can be provided according to this chapter and the Design Manual. Plans submitted for concept approval shall include, but are not limited to:
(a)
A map at a scale specified by the appropriate approval authority showing site location, existing natural features, water and other sensitive resources, topography, and natural drainage patterns;
(b)
The anticipated location of all proposed impervious areas, buildings, roadways, parking, sidewalks, utilities, and other site improvements;
(c)
The location of the proposed limit of disturbance, erodible soils, steep slopes, and areas to be protected during construction;
(d)
Preliminary estimates of stormwater management requirements, the selection and location of ESD practices to be used, and the location of all points of discharge from the site;
(e)
A narrative that supports the concept design and describes how ESD will be implemented to the MEP; and
(f)
Any other information required by the approving Agency.
(3)
Following concept plan approval by the appropriate authority, the owner or developer shall submit site development plans that reflect comments received during the previous review phase. Plans submitted for site development approval shall be of sufficient detail to allow site development to be reviewed and include but not be limited to:
(a)
All information provided during the concept plan review phase;
(b)
Final site layout, exact impervious area locations and acreages, proposed topography, delineated drainage areas at all points of discharge from the site, and stormwater volume computations for ESD practices and quantity control structures;
(c)
A proposed erosion and sediment control plan that contains the construction sequence, any phasing necessary to limit earth disturbances and impacts to natural resources, and an overlay plan showing the types and locations of ESD and erosion and sediment control practices to be used;
(d)
A narrative that supports the site development design, describes how ESD will be used to meet the minimum control requirements, and justifies any proposed structural stormwater management measure; and
(e)
Any other information required by the approving Agency.
(4)
Following site development approval by the appropriate authority, the owner/developer shall submit final erosion and sediment control and stormwater management plans that reflect the comments received during the previous review phase. Plans submitted for final approval shall be of sufficient detail to allow all approvals and permits to be issued according to the following:
(a)
Final erosion and sediment control plans shall be submitted according to COMAR 26.17.01.05; and
(b)
Final stormwater management plans shall be submitted for approval in the form of construction drawings and be accompanied by a report that includes sufficient information to evaluate the effectiveness of the proposed runoff control design.
(5)
Reports submitted for final stormwater management plan approval shall include, but are not limited to:
(a)
Geotechnical investigations including soil maps, borings, site-specific recommendations, and any additional information necessary for the final stormwater management design;
(b)
Drainage area maps depicting predevelopment and postdevelopment runoff flow path segmentation and land use;
(c)
Hydrologic computations of the applicable ESD and unified sizing criteria according to the Design Manual for all points of discharge from the site;
(d)
Hydraulic and structural computations for all ESD practices and structural stormwater management measures to be used;
(e)
A narrative that supports the final stormwater management design; and
(f)
Any other information required by the approving agency.
(6)
Construction drawings submitted for final stormwater management plan approval shall include, but are not limited to:
(a)
A vicinity map;
(b)
Existing and proposed topography and proposed drainage areas, including areas necessary to determine downstream analysis for the proposed stormwater management facilities;
(c)
Any proposed improvements including the location of buildings or other structures, impervious surfaces, storm drainage facilities, and all grading;
(d)
The location of existing and proposed structures;
(e)
Any easements and rights-of-way;
(f)
The delineation, if applicable, of the 100-year floodplain and any on-site wetlands;
(g)
Structural and construction details including representative cross sections for all components of the proposed drainage system or systems and stormwater management facilities;
(h)
All necessary construction specifications;
(i)
A sequence of construction;
(j)
Data for total site area, disturbed area, new impervious area, and total impervious area;
(k)
A table showing the ESD and unified sizing criteria volumes required in the Design Manual;
(l)
A table of materials to be used for stormwater management facility planting;
(m)
All soil boring logs and locations;
(n)
An inspection and maintenance schedule;
(o)
Certification by the owner/developer that all stormwater management construction will be done according to this plan;
(p)
An as-built certification signature block to be executed after project completion; and
(q)
Any other information required by the approving agency.
F.
Standard plans specified in Regulation .08D of this chapter are considered an acceptable stormwater management plan for satisfying the requirements of §E of this regulation.

Regulation .10 Construction Inspection and Enforcement.Copy Citation

A.
Before Beginning Construction.
(1)
All county and municipal ordinances shall require:
(a)
Advance notification of the beginning of construction by the owner/developer;
(b)
Documented regular inspections during construction of stormwater management systems;
(c)
Certification by a professional engineer licensed in the State documenting that structural practices have been constructed according to approved plans; and
(d)
Effective enforcement procedures to ensure compliance with approved stormwater management plans.
(2)
The owner/developer shall notify the appropriate approving agency at least 48 hours before beginning any work in conjunction with stormwater management system construction.
(3)
Inspections shall be conducted by county or municipal staff or certified by a professional engineer licensed in the State. The periodic inspections shall be documented and reports maintained by the county or municipality. Written reports shall be prepared for every inspection and include:
(a)
The date and location of the inspection;
(b)
Whether construction was in compliance with the approved stormwater management plan;
(c)
Any variations from the approved construction specifications; and
(d)
Any violations that exist.
(4)
The owner/developer and on-site personnel shall be notified in writing when violations are observed. Written notification shall describe the nature of the violation and the required corrective action.
(5)
Work may not proceed until the work previously completed is approved by the appropriate inspection authority.
B.
Regular inspections shall be made and documented for each ESD planning technique and practice at the stages of construction specified in the Design Manual. At a minimum, all ESD and other nonstructural practices shall be inspected upon completion of final grading, the establishment of permanent stabilization, and before issuance of use and occupancy approval.
C.
At a minimum, regular inspections shall be made and documented at the following specified stages of construction:
(1)
For ponds:
(a)
Upon completion of excavation to sub-foundation and, when required, installation of structural supports or reinforcement for structures, including but not limited to:
(i)
Core trenches for structural embankments,
(ii)
Inlet and outlet structures, anti-seep collars or diaphragms, and watertight connectors on pipes, and
(iii)
Trenches for enclosed storm drainage facilities;
(b)
During placement of structural fill, concrete, and installation of piping and catch basins;
(c)
During backfill of foundations and trenches;
(d)
During embankment construction; and
(e)
Upon completion of final grading and establishment of permanent stabilization;
(2)
Wetlands—at the stages specified for pond construction in §B(1) of this regulation, during and after wetland reservoir area planting, and during the second growing season to verify a vegetation survival rate of at least 50 percent;
(3)
For infiltration trenches:
(a)
During excavation to subgrade;
(b)
During placement and backfill of under drain systems and observation wells;
(c)
During placement of geotextiles and all filter media;
(d)
During construction of appurtenant conveyance systems such as diversion structures, pre-filters and filters, inlets, outlets, orifices, and flow distribution structures; and
(e)
Upon completion of final grading and establishment of permanent stabilization;
(4)
For infiltration basins—at the stages specified for pond construction in §B(1) of this regulation and during placement and backfill of under drain systems;
(5)
For filtering systems:
(a)
During excavation to subgrade;
(b)
During placement and backfill of under drain systems;
(c)
During placement of geotextiles and all filter media;
(d)
During construction of appurtenant conveyance systems such as flow diversion structures, pre-filters and filters, inlets, outlets, orifices, and flow distribution structures; and
(e)
Upon completion of final grading and establishment of permanent stabilization; and
(6)
For open channel systems:
(a)
During excavation to subgrade;
(b)
During placement and backfill of under drain systems for dry swales;
(c)
During installation or diaphragms, check dams, or weirs; and
(d)
Upon completion of final grading and establishment of permanent stabilization.
D.
The county or municipality responsible for inspection and enforcement of approved stormwater management plans may, for enforcement purposes, use any one or a combination of the following actions:
(1)
A notice of violation shall be issued specifying the need for the violation to be corrected if stormwater management plan noncompliance is identified;
(2)
A stop work order shall be issued for the site by the county or municipality if a violation persists;
(3)
Bonds or securities may be withheld or the case may be referred for legal action if reasonable efforts to correct the violation have not been undertaken; or
(4)
In addition to any other sanctions, a civil action or criminal prosecution may be brought against any person in violation of the Stormwater Management Subtitle or this chapter.
E.
Any step in the enforcement process may be taken at any time, depending on the severity of the violation.
F.
Once construction is complete, as-built plan certification shall be submitted by either a professional engineer or professional land surveyor licensed in the State to ensure that ESD planning techniques, treatment practices, and structural stormwater management measures and conveyance systems comply with the specifications contained in approved plans. At a minimum, as-built certification shall include a set of drawings comparing the approved stormwater management plan with what was constructed. Other information shall be submitted as required by the approving agency.
G.
Each county or municipality shall submit notice of construction completion to the Administration on a form supplied by the Administration for each stormwater management practice within 45 days of construction completion. If BMPs requiring soil conservation district approval are constructed, notice of construction completion shall also be submitted to the appropriate soil conservation district.

Regulation .11 Maintenance.Copy Citation

A.
Maintenance requirements established in this regulation shall be contained in all county and municipal ordinances and shall provide for inspection and maintenance. The owner shall perform or cause to be performed preventive maintenance of all completed ESD treatment practices and structural stormwater management measures to ensure proper functioning. The responsible agency of the county or municipality shall ensure preventive maintenance through inspection of all stormwater management systems. The inspection shall occur during the first year of operation and then at least once every 3 years after that.
B.
Inspection reports shall be maintained by the county or municipality on all stormwater management systems and shall include the following:
(1)
The date of inspection;
(2)
Name of inspector;
(3)
The condition of:
(a)
Vegetation or filter media;
(b)
Fences or other safety devices;
(c)
Spillways, valves, or other control structures;
(d)
Embankments, slopes, and safety benches;
(e)
Reservoir or treatment areas;
(f)
Inlet and outlet channels or structures;
(g)
Underground drainage;
(h)
Sediment and debris accumulation in storage and forebay areas;
(i)
Any nonstructural practices to the extent practicable; and
(j)
Any other item that could affect the proper function of the stormwater management system;
(4)
Description of needed maintenance.
C.
County and municipal ordinances shall provide procedures to ensure that deficiencies indicated by inspections are rectified. The procedures shall include the following:
(1)
Notification to the owner of deficiency including a time frame for repairs;
(2)
Subsequent inspection to ensure completion of repairs; and
(3)
Effective enforcement procedures if repairs are not undertaken or are not done properly.

Chapter 03. Agricultural Sediment Pollution Control

Regulation .01 Purpose.Copy Citation

This chapter sets forth certain requirements for persons engaged in agricultural land management practices, with respect to sediment pollution control. Logging and timber removal operations regulated under COMAR 26.17.01 are not regulated under this chapter.

Regulation .02 Definitions.Copy Citation

A.
In this chapter, the following terms have the meanings indicated. Terms not defined below have the meanings given them in the relevant statutes or, if not defined in statutes, the meanings attributed by common use.
B.
Terms Defined.
(1)
“Conservation practice” means an agricultural land management practice that:
(a)
Prevents or treats problems with soil, water, air, plant, and animal resources; and
(b)
Has a standard method of construction or application developed by the Soil Conservation Service (SCS) that is listed in the Maryland Technical Guide, which is incorporated by reference in Regulation .04 of this chapter.
(2)
“Corrective action water quality plan (CAWQP)” means that portion of a soil conservation and water quality plan prepared by, or under the direction of, and approved by the Soil Conservation District to address a specific sediment pollution violation.
(3)
“Department” means the Department of the Environment.
(4)
“District” means a local soil conservation district, a political subdivision of the State established in accordance with Agriculture Article, Title 8, Annotated Code of Maryland.
(5)
“Erosion” means the process by which the land surface is worn away by the action of wind, water, ice, or gravity.
(6)
“Implement” means to develop, establish, install, construct, and maintain a district-approved soil conservation and water quality plan (SCWQP).
(7)
“Includes or including” means includes or including by way of illustration and not by way of limitation.
(8)
“Person” means an individual, receiver, trustee, guardian, personal representative, fiduciary, or representative of any kind and any partnership, firm, association, corporation, or other entity that owns or leases agricultural land.
(9)
“Sediment” means soils or other surficial materials transported or deposited by the action of wind, water, ice, gravity, or by other artificial means.
(10)
“Soil conservation and water quality plan (SCWQP)” means a land use plan for a whole farm prepared by, or under the direction of, and approved by the district in accordance with the National Conservation Planning Manual, and the Maryland Technical Guide, which are incorporated by reference in Regulation .04 of this chapter, or other guidance documents which were in effect at the time of plan development, and the requirements of this chapter, to make the best possible use of soil and water resources, and to minimize the movement of sediment, animal wastes, nutrients, or agricultural chemicals into the waters of the State.
(11)
“Waters of the State” means:
(a)
Both surface and underground waters within the boundaries of this State subject to its jurisdiction, including that part of the Atlantic Ocean within the boundaries of this State, the Chesapeake Bay and its tributaries, and all ponds, lakes, rivers, streams, storm drain systems, tidal and nontidal wetlands, public ditches, tax ditches, and public drainage systems within this State other than those designed and used to collect, convey, or dispose of sanitary sewage; and
(b)
The flood plain of free-flowing waters determined by the Department on the basis of the 100-year flood frequency.

Regulation .03 Exception.Copy Citation

When areas of agricultural land or agricultural practices alleged to be in violation of Environment Article, §4-413(b), Annotated Code of Maryland, are included in an SCWQP which was approved by the district and was developed and implemented in accordance with the National Conservation Planning Manual and the Maryland Technical Guide, which are incorporated by reference in Regulation .04 of this chapter, or other guidance documents which were in effect at the time of plan development, the Department may not impose any penalties for a violation of Environment Article, §4-413(b), Annotated Code of Maryland, or this chapter on a person engaged in agricultural activities unless:
A.
The agricultural practices in use on the area of land alleged to be in violation of Environment Article, §4-413(b), Annotated Code of Maryland, are not those described in the SCWQP for that area;
B.
The conservation practices described in the SCWQP for the area alleged to be in violation of Environment Article,
§4-413(b), Annotated Code of Maryland, are not constructed or implemented;
C.
Except for practices accepted under Regulation .06C and D of this chapter, the conservation practices described in the SCWQP for the area alleged to be in violation of Environment Article, §4-413(b), Annotated Code of Maryland, are not implemented or constructed in accordance with the SCS standards for conservation practices described in the Maryland Technical Guide, which is incorporated by reference in Regulation .04 of this chapter; or
D.
Agricultural practices exist on the person's agricultural operation which cause the approved conservation practices to fail to control sediment pollution, when the agricultural practices are:
(1)
Practiced or constructed on an area which is not included in a district-approved SCWQP, or
(2)
In an area included in an SCWQP, but not implemented or constructed in accordance with a district-approved SCWQP.

Regulation .04 Incorporation by Reference.Copy Citation

A.
The Maryland Technical Guide (Soil Conservation Service, United States Department of Agriculture, October, 1993) is incorporated by reference.
B.
The National Conservation Planning Manual (Soil Conservation Service, United States Department of Agriculture, June, 1978), including Amendments 1—7, is incorporated by reference.

Regulation .05 General Provisions.Copy Citation

A.
Department Responsibilities.
(1)
The Department shall investigate any report to determine if agricultural sediment pollution in violation of Environment Article, §4-413(b), Annotated Code of Maryland, has occurred.
(2)
The Department shall determine the appropriate actions to be taken to investigate reports of sediment problems. These actions may include:
(a)
Notification to the person and the district of a report of sediment pollution, with a request for the person and the district to undertake cooperative efforts to prevent sediment pollution violations; or
(b)
Inspection of sites with the district or independently.
(3)
When the Department identifies and documents a sediment pollution violation, the Department may issue a written complaint specifying the laws or regulations allegedly violated and the facts that constitute a violation. After or concurrent with the service of the complaint, the Department may issue an order to the alleged violator to:
(a)
Correct conditions which have resulted in the sediment pollution of the waters of the State;
(b)
Obtain and implement a district-approved CAWQP which includes a schedule for its implementation; and
(c)
Submit within 30 days a district-approved schedule for obtaining an SCWQP for the whole farm.
(4)
The Department shall provide a copy of all written reports, complaints, and orders issued under this chapter to the district.
(5)
As necessary, the Department may require a person to obtain district-approved modifications to approved CAWQPs and SCWQPs to reflect changes in the agricultural operation, pollution problems, and site conditions.
B.
District Responsibilities for Addressing Sediment Pollution Violations. The district's responsibilities include:
(1)
Directing the preparation of, preparing, and approving CAWQPs and SCWQPs;
(2)
Reviewing potential and actual erosion and sediment problem areas on site upon notification from the Department of a report of sediment pollution, and providing the technical assistance needed to prevent sediment pollution violations;
(3)
Ensuring that those violations of Environment Article, §4-413(b), Annotated Code of Maryland, identified and documented by the Department in writing to alleged violators are addressed by the district-approved CAWQP and SCWQP, and that:
(a)
All sediment violations shall be addressed by the preparation of a CAWQP,
(b)
If an approved SCWQP exists, the violation shall be corrected through modification of the SCWQP;
(4)
Directing preparation of, preparing, and approving CAWQPs within 45 days of a request for assistance from a person notified by the Department that a pollution violation exists;
(5)
Approving CAWQP and SCWQP modifications to address sediment pollution violations as necessary to reflect changes in the agricultural operation, pollution problems, and site conditions, and providing the Department with a copy of the modifications within 10 days of the modification approval;
(6)
Providing the Department, when requested, with written confirmation that all conservation practices included in a CAWQP or SCWQP to address the sediment violations documented by the Department are constructed or implemented in accordance with the Maryland Technical Guide, which is incorporated by reference in Regulation .04 of this chapter, or approved under Regulation .06C and D of this chapter;
(7)
Providing to the Department a copy of all approved CAWQPs and SCWQPs for sites under investigation or which result from Departmental orders issued under this chapter; and
(8)
Having the option to notify the Department when implementation or maintenance is not in substantial compliance with the approved CAWQP or SCWQP.

Regulation .06 Minimum Requirements for an SCWQP.Copy Citation

A.
SCWQPs shall conform to the SCS standards and criteria described in the Maryland Technical Guide, and the National Conservation Planning Manual, which are incorporated by reference in Regulation .04 of this chapter, or other guidance documents which were in effect at the time of plan development.
B.
Conservation practices included within an SCWQP shall be constructed and implemented in accordance with the Maryland Technical Guide, which is incorporated by reference in Regulation .04 of this chapter.
C.
Modified conservation practice standards may be substituted for the conservation practice standards in an SCWQP if the modified conservation practice standards:
(1)
Provide prevention or control of sediment pollution equal to or better than that provided by conservation practice standards;
(2)
Are recommended by the SCS;
(3)
Are approved by the district; and
(4)
Are accepted by the Department.
D.
Unusual, alternative, and innovative land management practices may be included in an SCWQP and substituted for conservation practices if the management practices:
(1)
Provide prevention or control of sediment pollution equal to or better than that provided by conservation practices or provide prevention or control of sediment pollution that cannot be provided with conservation practices;
(2)
Are recommended by the SCS;
(3)
Are approved by the district; and
(4)
Are accepted by the Department.

Regulation .07 Minimum Requirements for a CAWQP.Copy Citation

A CAWQP adopted or modified after the effective date of this regulation shall include:
A.
The land owner's name, address, and telephone number;
B.
The lessee's name, address, and telephone number;
C.
The number of acres controlled by the plan;
D.
A narrative listing, describing, and locating all the sediment pollution violations cited by the Department on the farm which affect water quality, and identifying the specific conservation practices that are intended to correct each violation;
E.
The name, practice code number, and the effective date of the standard and specification for each conservation practice as found in the Maryland Technical Guide, which is incorporated by reference in Regulation .04 of this chapter;
F.
A schedule of when the conservation practices will be implemented;
G.
A map which includes the area of violation cited by the Department and which identifies the location of corrective measures to be implemented;
H.
A statement, in a format approved by the Department, which is signed and dated by the owner and lessee certifying that the CAWQP will be implemented as approved; and
I.
The name, address, and telephone number of the individual responsible for the implementation of the CAWQP.

Regulation .08 Enforcement.Copy Citation

A.
Actions by the Department.
(1)
When the Department believes that a violation of Environment Article, §4-413, Annotated Code of Maryland, has occurred, it may cause a written complaint to be served upon the alleged violator in accordance with the provisions of Environment Article, Title 4, Subtitle 4, Annotated Code of Maryland. The complaint shall include a description of the conditions which result in the addition, leaking, spilling, emitting, or other introduction of soil or sediment to the waters of the State.
(2)
The Department may issue an order after or concurrent with the complaint.
(3)
Orders issued by the Department shall include:
(a)
A description of the corrective actions which the person shall perform, including:
(i)
Immediate actions necessary to correct the violations listed in the order, and
(ii)
Further actions necessary to correct the violations and prevent their recurrence;
(b)
The time allowed for the person to perform the actions required in the order;
(c)
The requirement to obtain and implement a CAWQP or a modified SCWQP; and
(d)
The requirement to provide a district-approved time schedule to obtain an SCWQP.
(4)
The Department shall serve all orders as prescribed in Environment Article, Title 4, Subtitle 4, Annotated Code of Maryland.
B.
Action Required on Receipt of an Order.
(1)
On receipt of an order issued by the Department, a person shall perform the corrective actions specified in the order within the time specified.
(2)
On receipt of an order issued by the Department to obtain or implement a CAWQP, a person shall prepare or have prepared a CAWQP that is in accordance with SCS standards and other criteria described in the National Conservation Planning Manual and the Maryland Technical Guide, which are incorporated by reference in Regulation .04 of this chapter, and the requirements of this chapter.
(3)
A person shall implement the CAWQP in accordance with the schedule in the CAWQP unless the:
(a)
Person notifies the Department, in writing, that due to exceptional circumstances beyond the control of the person, the CAWQP cannot be implemented within the time scheduled in the CAWQP, the exceptional circumstances are verified in writing by the district board, and the Department agrees to extend the time; or
(b)
Property described in the order is no longer used for agricultural purposes and is no longer in a condition which adds, leaks, spills, emits, or otherwise introduces soil or sediment to the waters of the State, and the Department determines that the CAWQP need not be implemented.
C.
CAWQP Maintenance. A person implementing a district-approved CAWQP shall:
(1)
Have available a copy of the CAWQP or, if applicable, the SCWQP; and
(2)
Maintain the person's agricultural operation in accordance with the approved or modified CAWQP or SCWQP.
D.
Penalties. Enforcement penalties as provided in Environment Article, Title 4, Subtitles 4 and 5, Annotated Code of Maryland, may be imposed if one or more of the following conditions exists:
(1)
The action necessary to comply with the Department's order has not begun or has not been completed on or before the date specified in the order;
(2)
The owner or operator does not obtain a district-approved CAWQP;
(3)
The district-approved CAWQP is not being implemented and maintained according to its terms and conditions; or
(4)
A second or subsequent violation occurs and an SCWQP has not been prepared and implemented in accordance with the district-approved schedule.

Chapter 04. Construction on Nontidal Waters and Floodplains

Regulation .01 Scope.Copy Citation

These regulations are designed to govern construction, reconstruction, repair, or alteration of a dam, reservoir, or waterway obstruction or any change of the course, current, or cross section of a stream or body of water within the State including any changes to the 100-year frequency floodplain of free-flowing waters. Free-flowing waters do not include State or private wetlands or areas subject to tidal flooding. For purposes of these regulations, the landward boundaries of any tidal waters shall be deemed coterminous with the wetlands boundary maps adopted pursuant to Environment Article, §16-301, Annotated Code of Maryland.

Regulation .02 Definitions.Copy Citation

A.
The following definitions describe the meanings of terms used in the regulations governing construction on nontidal waters and floodplains adopted by the Water Management Administration of the Department of the Environment (Regulations .01—.13), unless the context in which they are used clearly requires a different meaning or a different meaning is prescribed at the point of use. Terms not defined below shall have the meanings given to them in the relevant statutes or, if not defined in statutes, the meanings attributed by common use. The terms “Administration”, “Department”, “person”, and “waters of the State” are defined in the Environment Article, Title 5, Subtitle 1, Annotated Code of Maryland. The definitions for these terms are provided as a convenience, but persons affected by the Department's regulations should be aware that these definitions are subject to amendment by the General Assembly.
B.
In this chapter, the following terms have the meanings indicated:
(1)
“Administration” means the Water Management Administration.
(2)
“Administrative order” means a written notification issued by the Administration pursuant to State law and regulations, requiring, within a time specified, correction of a violation of or compliance with provisions of pertinent law, regulations, permit, or approval.
(3)
“Anadromous fish spawning areas” means that portion of the waters of the State identified by the Department as spawning and nursery areas for anadromous fish species.
(4)
“Dam” means any obstruction, wall, or embankment, together with its abutments and appurtenant works, if any, in, along, or across any stream, heretofore or hereafter constructed for the purpose of storing or diverting water or for creating a pool upstream of the dam, as determined by the Administration.
(5)
“Danger reach” means that area downstream of a dam within which sudden release of waters resulting from failure of the dam during the inflow design flood would cause an artificial flood exceeding the flood that might be expected from the same storm if the dam had not existed.
(6)
“Department” means the Department of the Environment.
(7)
“Dominant discharge” means the flow rate capacity, in cubic feet per second, of the stream channel considering steady, uniform flow.
(8)
“Emergency condition” means a sudden unforeseen occurrence or condition requiring exigency or a circumstance which the Administration determines constitutes a present or imminent danger to the public health or safety or to the environment.
(9)
“Floodplain” means that area along or adjacent to a stream or a body of water within the waters of the State that is capable of storing or conveying floodwaters.
(10)
“Flood-proofing” means any combination of structural or nonstructural additions, changes, or adjustments to structures together with attendant utility and sanitary facilities that are designed so that below the elevation of the 100-year frequency flood event the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy.
(11)
“Freeboard” means the vertical distance to the crest of a dam above the water surface at time of maximum design flow over the spillway.
(12)
“General waterway construction permit” means the authorization established by Regulation .10 of this chapter for certain categories of construction activities to take place without an individual waterway construction permit.
(13)
“Inflow design flood” means the size of flood coming into the reservoir that is used as a basis for designing various parts of the dam.
(14)
"1983 Maryland Standards and Specifications for Soil Erosion and Sediment Control" means the official handbook for sediment control principles, methods, and practices approved by the Administration, which is incorporated by reference under COMAR 26.17.01.11.
(15)
“Natural trout waters” means waters having the potential to support or are capable of supporting natural trout populations, including propagation, and their associated food organisms. These waters are designated Use III as indicated in COMAR 26.08.02.08.
(16)
“Normal depth” means the maximum vertical distance from the stream bed invert at the upstream toe of the dam to the normal water surface.
(17)
“Overflow spillway” means any operating, emergency, or other spillway which discharges with a free water surface over or around the dam as opposed to an orifice, gate, or conduit which discharges through or beneath the dam or nearby ground.
(18)
“Owner” means any person or persons and their duly authorized agents, owning, operating, maintaining, or proposing to construct any dam, reservoir, or other obstruction, or to change the course, current, or cross section of any body of water in the State.
(19)
“Permit” means authorization by the Administration, pursuant to pertinent law and regulations, describing the required performance for specific activities and operations.
(20)
“Permittee” means the person to whom a permit is issued by the Administration.
(21)
“Person” means the federal government, the State, any county, municipal corporation, or other political subdivision of the State, or any of their units, or an individual, receiver, trustee, guardian, executor, administrator, fiduciary, or representative of any kind, or any partnership, firm, association, public or private corporation, or any other entity.
(22)
“Probable maximum flood” means the most severe flood considered possible in a specific region. This may be:
(a)
The probable maximum flood as determined by a source acceptable to the Administration; or
(b)
Calculated using a rational consideration of the chances of simultaneous occurrence of the maximum of the several elements or conditions which contribute to the flood.
(23)
“Recreational trout waters” means cold or warm waters having the potential to hold or support or capable of holding or supporting adult trout for put-and-take fishing, usually seasonal. These waters are designated Use IV as indicated in COMAR 26.08.02.08.
(24)
Repair.
(a)
“Repair” includes any modification or alteration to a dam, reservoir, waterway obstruction, stream channel, or floodplain when the:
(i)
Hydraulic performance or safety of a dam or waterway obstruction is altered or affected;
(ii)
Hydraulic performance of a bridge or culvert, stream channel, or floodplain is altered or affected; or
(iii)
Use of construction equipment within a flowing stream would be required.
(b)
“Repair” does not include ordinary maintenance which does not cause pollution, as defined in COMAR 26.17.01.01B(14), to the waters of the State.
(25)
“Reservoir” means any basin, either natural or artificial, used for the collecting or storing of water.
(26)
“Standard project flood” means the most severe flood considered reasonably characteristic of the specific region. This is calculated for a specific dam site using one or more of the recognized methods acceptable to the Administration. Usually, this flood will have a magnitude between 40 percent to 60 percent of the probable maximum flood.
(27)
“State” means the State of Maryland.
(28)
“Substantial improvement” means any repair, reconstruction, or improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure. The term does not include any project for improvement of a structure to comply with existing State or local health, sanitary, or safety code specifications which are necessary to insure safe living conditions or any alteration of a structure listed in the National Register of Historic Places or a State Inventory of Historic Places.
(29)
“Tractive force” means the shear stress, expressed in pounds per square foot, acting upon the wetted boundary of the stream channel and is expressed as:
(30)
“Waters of the State” includes both surface and underground waters within the boundaries of the State subject to its jurisdiction, including that portion of the Atlantic Ocean within the boundaries of the State, the Chesapeake Bay and its tributaries, and all ponds, lakes, rivers, streams, public ditches, tax ditches, and public drainage systems within the State, other than those designed and used to collect, convey, or dispose of sanitary sewage. The floodplain of free-flowing waters determined by the Department on the basis of the 100-year flood frequency is included as waters of the State.

Regulation .03 Requirements for a Permit.Copy Citation

A.
Except as set forth in §§D and E of this regulation, a person who proposes to construct, reconstruct, repair, or alter a dam, reservoir, or waterway obstruction, or change in any manner the course, current, or cross section of a stream or body of water within the State except tidal waters, including any changes to the 100-year frequency floodplain of free-flowing streams shall obtain a permit from the Administration before commencing any work.
B.
If the construction, reconstruction, repair, or alteration of the proposed works is for the purpose of obtaining a new or increased supply of water for any use for which an appropriation permit is required by law or regulation, the applicant shall also apply to the Administration for this permit. The Administration shall establish the order in which the applications may be considered or may require the applications to be submitted and considered concurrently.
C.
The latest flood insurance studies prepared by the Federal Emergency Management Agency shall serve to delineate, at a minimum, the extent of the 100-year floodplain of free-flowing waters. The applicant shall furnish the Administration with hydrologic and hydraulic computations to establish the elevation of the 100-year frequency flood event.
D.
Exemptions. The following activities are exempted from the requirements for a permit from the Administration under this chapter:
(1)
Filling, dredging, or construction of any work in the tidal portions of the waters of the State; filling, dredging, or construction, in these areas, may require a wetlands license or permit under the provisions of Environment Article, Title 16, Annotated Code of Maryland;
(2)
Agricultural drainage systems, for the purpose of lowering the level of water in the soil, with a total drainage area of 2,500 acres or less except that a drainage system financed or managed by a public drainage association is exempt only if a plan for construction, operation, and maintenance has been approved by the Secretary of Agriculture under the Agriculture Article, §8-603, Annotated Code of Maryland;
(3)
The removal or demolition of residential structures;
(4)
A small pond which meets the requirements of Regulation .05G of this chapter.

Regulation .04 Permit Applications — General Requirements.Copy Citation

A.
An application to the Administration shall include all studies, surveys, calculations, tests, and data necessary for determining the adequacy of the project design. The degree of investigation needed for a specific project is a matter of the Administration's judgment based upon the magnitude and impact of the project and the complexity of the site. The applicant shall demonstrate to the Administration that sufficient investigations have been made and that adequate allowances have been applied to the design. The Administration may waive a requirement not pertinent to the decision. In addition, the Administration may require the submission of additional information or data it finds appropriate.
B.
An application to the Administration shall include evidence of the benefits to be derived from the project. This evidence shall be stated in monetary terms or, when more appropriate, other quantitative or qualitative terms.
C.
A proposed project shall be consistent and compatible with overall basin, flood management, or watershed development plans, if any, prepared, adopted, or approved by the State or a local jurisdiction.
D.
An environmental study of the significant effects of the project may be required of the applicant by the Administration. The Administration may require that the study include an inventory of the existing vegetation, fish, wildlife, scenic, recreational, and historic values located within the project area. The study shall also include a description of mitigation measures proposed to minimize the potential adverse effects of the project.
E.
An application to the Administration shall include provisions assuring the maintenance and operation of the proposed project throughout the project's existence.
F.
Unless waived by the Administration, hydrologic calculations shall be based on the ultimate development of the watershed, assuming existing zoning.
G.
Information required by these regulations shall be submitted to the Administration, in a manner and form acceptable to the Administration, before the Administration will take final action on the application.
H.
The Administration shall furnish application forms for permits upon request. The owner of the proposed project or his duly authorized representative shall complete and sign the application form.
I.
When required in writing by the Administration, the applicant shall engage a qualified professional engineer, practicing in accordance with the laws of Maryland, to certify that the design meets all of the requirements of the Administration.
J.
The Administration may refuse to process an application until the applicant has certified in writing to the Administration that all local land use requirements, including zoning, special exceptions, variances or conditional uses, necessary for the location and operation of the proposed works have been satisfied. It is the applicant's responsibility to obtain State, federal, or local approvals not addressed in the regulations contained in this chapter. Obtaining a permit under this chapter does not relieve the permittee from obtaining other approvals as may be required.
K.
Hydrologic and hydraulic computations shall use methods in the public domain which are verifiable.
L.
Unless waived by the Administration, project plans shall include survey and topographic information that is referenced to a bench mark based on the National Geodetic Vertical Datum of 1929 which is incorporated by reference under 41 FR 20202 (1976).
M.
Final action on any application will be deferred pending receipt of an approved sediment and erosion control plan from the local soil conservation district, when the local approval is required under COMAR 26.17.01.
N.
An applicant shall agree to allow a reasonable inspection of the proposed project site by representatives of the Administration.

Regulation .05 Dams and Reservoirs.Copy Citation

A.
In addition to the general requirements in Regulation .04 of this chapter, the following special requirements shall apply to applications for dams and reservoirs:
(1)
A person who applies to construct, reconstruct, repair, or alter a dam or reservoir shall engage a registered professional engineer, practicing in accordance with the laws of Maryland and qualified in the field of dam design and construction to prepare the designs and specifications and to provide supervision during construction of the proposed works. The engineer shall be the engineer-in-charge and shall:
(a)
Be responsible for assuring that the designs conform to the high standards of professional competence in the specialty of dam design and construction;
(b)
Assure that the construction is carried out in strict accordance with the approved plans and specifications and under the provisions of the permit; and
(c)
Submit to the Administration a resume of all previous dam design and construction experience, listing specific responsibilities and a written certification of qualification to act as the engineer-in-charge.
(2)
If an engineering team is planned for the design and construction, one registered professional engineer shall act as the engineer-in-charge. However, each individual on the project team shall document that individual's area of responsibility and technical experience. This documentation shall accompany the permit application.
(3)
Making Application. The procedure for obtaining a permit for construction, reconstruction, repair, or alteration of a dam or reservoir is established in two steps:
(a)
Step One. Plan Development Phase of Permit for a Waterway Obstruction. The applicant shall first obtain the Administration's written approval of the classification of the dam as outlined in §B of this regulation. The applicant shall then submit to the Administration an application which includes a feasibility report. Upon approval of the completed application, the Administration shall issue a Plan Development Permit. The decision of the Administration to issue or deny a Plan Development Permit shall constitute a final decision for the purposes of appeal to the Board of Review pursuant to Natural Resources Article, §1-107, Annotated Code of Maryland. The feasibility report shall include the following:
(i)
Objectives and purposes of the project.
(ii)
Alternate proposals studied.
(iii)
General description of proposed dam and reservoir, including a plan view and cross section.
(iv)
Conclusions on the dam site and adjacent valley walls and floor based upon geologic maps, surface investigations, seismic, geophysical, or geotechnical studies, or any preliminary soil borings made.
(v)
Conclusions on the safety and effectiveness of the dam in impounding water.
(vi)
Hydrologic studies including the determination of the inflow design flood, the danger reach, and the proposed operation of the dam and reservoir.
(vii)
A map showing the project location, ownership of land affected, and showing any existing or proposed water or sewer lines, pipelines or electric transmission lines crossing the impoundment area and their planned relocation or protection. The map shall also show the location of other existing or proposed dams, reservoirs or other water resource projects, whose conditions of flow or operations may affect or be affected by this proposed project.
(viii)
Type and source of materials to be used in construction. When natural materials (earth, rock, etc.) are to be used, the engineer shall indicate the approximate structural properties and availability of each kind of material.
(ix)
Photographs of the proposed site.
(x)
Estimated benefits from the project, including the design life of the project.
(xi)
Estimated cost of the project and length of time required for construction of the structure and filling of the reservoir.
(xii)
The owner's written assurance that funds will be available to complete the project as planned and for continued maintenance of the project throughout the life of the structure.
(xiii)
An environmental study that includes measures to preserve or enhance the aesthetic, scenic, and wild values at the project site and upstream and downstream of the project. If the project is on a stream within the State Scenic and Wild Rivers Program, this information shall include measures to be taken to preserve the aesthetic and scenic values and the wild qualities of the stream.
(xiv)
Foundation investigations shall define the location, type, strength, and other pertinent characteristics of the foundation material. Foundation investigations shall further disclose ground water conditions and other applicable information necessary for analysis of possible seepage problems.
(xv)
Topographic surveys shall be made in sufficient accuracy to define the volume of storage in the reservoir and the flow limits. Property lines shall be shown in order that any potential effects of the water in the reservoir on adjacent properties may be determined. The downstream area shall be investigated and, if necessary, surveyed in order to establish the area of potential damage in case of failure.
(xvi)
Establishment of proposed minimum releases after the reservoir is filled.
(b)
Step Two. Construction Phase of Permit for a Waterway Obstruction. Before the Administration may issue a construction permit for the dam or reservoir, a separate permit application shall be accompanied by final construction plans, specifications, and other information that may be required. Final construction plans, specifications, and other data required before a permit may be issued shall include the following:
(i)
Design report with all pertinent computations, including: geology (location and logs of soil and rock borings, conclusions, etc.); soil or rock mechanics tests; hydrology; design criteria; hydraulic design (flood routing, stage storage curve referenced to the lowest drain, velocities in downstream channel, etc.); structural design; stability analysis (including rapid drawdown); and, quantities and cost estimates.
(ii)
Construction plans and location sketch, showing borrow areas, spoil areas, etc.
(iii)
Construction specifications.
(iv)
Provisions for minimum releases during construction and reservoir filling.
(v)
Time schedule for construction.
(vi)
Approved grading and sediment control plan, showing the measures for controlling sediment loss during and after construction.
(vii)
Maintenance plan describing the steps to be followed by the owner to provide for the continued maintenance of the dam and reservoir during the expected life of the structure. This plan shall describe what work is to be called for at periodic intervals or when necessary to keep the structure in good condition. Among other items it shall address mowing or cutting of brushy growth on embankments, preventing erosion or gullying of embankment surfaces, clearing of toe drains, the prevention of accumulation of trash and debris, the protection against rust and spalling, and the exercise of valves or other mechanical equipment. The description of this program shall be submitted to this Administration for approval and inclusion among the required conditions of the construction permit.
(viii)
Operations plan describing the steps to be followed by the owner to provide for the safe operation of the dam and reservoir and the continued minimum releases, withdrawals, etc.
(ix)
A warning plan for Category I and Category II dams describing the steps to be followed in notifying persons whose lives, property, or health may be endangered by failure, improper operation, or other circumstances affecting the safety of the dam. The warning plan shall identify the most practical and expeditious means for notifying potentially affected persons in close proximity to the dam or property owners.
(x)
A requirement by the Administration that the applicant post a construction bond, irrevocable letter of credit, or other security acceptable to the Administration to assure that funds are available to complete the construction of the proposed project and for continued maintenance of the project throughout the life of the structure.
B.
Structure Classification and Design Criteria.
(1)
Classification of Dams. The following table sets forth judgmental factors for minimizing the risk associated with the design of dams. The table is intended only as a guide. A proposed dam shall satisfy all four factors (normal pool storage volume, normal depth, potential for loss of life, and potential for damage) in order to avoid classification in a more rigorous category. Failure damage potential shall consider future development and use of the area flooded throughout the danger reach and the damage which would be expected from a complete breaching of the dam. If, in the opinion of the Administration, future development is probable in the area flooded throughout the danger reach, the dam shall be classed in Category I. The classification of the proposed dam shall be assigned by the Administration after the applicant has provided information on the potential damage within the danger reach, as defined herein. After the classification has been assigned, the inflow design flood and spillway design may be established. Dams qualifying for the Category III classification may be classed in Category IV, if all of the requirements of Environment Article, §5-503(b), Annotated Code of Maryland, are met with the exception of §5-503(b)(1).
(2)
Danger Reach. A danger reach shall be established for all proposed dams by routing a flood hydrograph resulting from a failure of the structure. Computation of the danger reach is an iterative process and, based upon the potential for damage and loss of life, may necessitate reclassification to a higher category by the Administration. The danger reach shall be established using methods that compare the depth and aerial extent of the flood waters without and with the proposed dam as follows:
(a)
The inflow design flood shall be flood routed throughout the downstream valley without the proposed dam in place.
(b)
A dam-breach flood wave shall be routed throughout the downstream valley assuming failure of the dam. The following procedures are incorporated by reference and shall be considered acceptable by the Administration:
(i)
DAMBRK-The NWS Dam-Break Flood Forecasting Model, The Hydrologic Engineering Center, U.S. Army Corps of Engineers, February, 1984;
(ii)
HEC-1 Flood Hydrograph Package, Computer Program 723-X6-L2010, The Hydrologic Engineering Center, U.S. Army Corps of Engineers, September, 1981 (Revised January, 1985);
(iii)
Technical Release Number 66, Simplified Dam-Breach Routing Procedure (Revised December, 1981).
(c)
Under §B(2)(b) of this regulation, consideration shall also be given to the peak discharge caused by the design storms in the uncontrolled area below the dam, together with the flow over and through the dam.
(3)
Inflow Design Flood. The inflow design flood for Category I dams shall be the probable maximum flood. For Category II dams the inflow design flood shall be the standard project flood or the largest flood of record, whichever is greater. For Category III dams the inflow design flood shall be one having a recurrence interval of once in 100 years or longer. For Category IV dams the inflow design flood shall be as defined in USDA, Natural Resource Conservation Service, Maryland Conservation Practice, Standard Pond Code 378 (January, 2000), which is incorporated by reference in COMAR 26.17.02.01-1B(2). Criteria shall be provided or approved by the Administration for each of the above inflow design floods.
(4)
Spillway Design. Established procedures for spillway design and capacity, when properly applied, will be accepted by the Administration. The effects of storage may be taken into account in establishing spillway capacity and top of dam. All spillways shall be designed to adequately handle debris either by trash racks or with sufficient opening. All dams shall have an overflow spillway included in the design. A constructed earthen embankment may not be used as an overflow spillway. All dams classed in Category I or II shall be designed with an emergency spillway which passes the inflow design flood without endangering the dam and whose predicted frequency of use is not greater than once in 100 years. Adequate provision shall be made to dissipate the energy of water flowing over or through the dam and to protect the downstream toe of the dam.
(5)
Dams in Category IV. The designs, plans, and specifications for all dams classed in Category IV, and not approved by either the soil conservation district or the Administration’s designee, shall be reviewed by the Administration for technical compliance with the requirements in USDA, Natural Resource Conservation Service, Maryland Conservation Practice, Standard Pond Code 378 (January, 2000), which is incorporated by reference in COMAR 26.17.02.01-1B(2), and the Administration’s policies and procedures.
GUIDE TO CLASSIFICATION OF DAMS
C.
Design Specifications.
(1)
Design References. References used by the designer shall be cited in the application submitted to the Administration, especially where unusual features are incorporated in the design.
(2)
Freeboard. The design shall allow for certain freeboard as a minimum, not to be reduced under any circumstances during the operation of the dam and reservoir. The design freeboard is for that reservoir stage which will exist when the pool has reached maximum level during the inflow design flood with the outlet works and overflow spillway operating as planned. The freeboard is to be calculated to prevent overtopping and protect the dam against the destructive forces of waves, frost, settlement, and surface erosion.
(3)
Safety Factor. The safety factor shall be that used in good engineering practice in dam design. In all important structural features, the safety factor used shall be shown in the design assumptions. The Administration requires a safety factor of at least 1.5 to be included in the structural design of the dam or any of its components during steady state seepage conditions, and at least 1.2 during rapid drawdown of the reservoir pool from the spillway crest. If site conditions or the downstream hazard category warrants, the Administration may require a safety factor of greater than specified in this section.
(4)
Drains. Dams shall include a device to allow draining of the reservoir within a reasonable amount of time. The following factors shall be considered in determining the reasonable time period for drainage:
(a)
The risk and nature of a potential dam failure;
(b)
The time likely to be available to avert a failure after notice of conditions threatening the safety or stability of the dam; and
(c)
The influence of rapid drawdown on the stability of the dam, its appurtenant works, and the natural upstream slopes of the reservoir.
(5)
Specifications. Specifications shall be written to assure that design criteria, with regard to the quality of the materials and methods of construction, will be met or exceeded.
(6)
Providing Means for Inspections. The Administration may include, either at the time of granting a permit for construction of a dam or at a later date, a requirement that the owner provide and install devices necessary for the future inspection and surveillance of the dam. The number, type, and location of the devices shall be determined as a result of the Administration's evaluation of the size and nature of the dam, the complexity of local natural conditions, and the degree of risk resulting from any future deterioration or failure. The requirement may include provisions for the measurement of the settlement of the crest or slopes of dams, the movement of walls in the valley or reservoir, the increases in pore-water pressure in earth or the increases in flow from drainage systems, and the installation of other devices required to detect serious changes in the structure or the affected area to allow the repair of deficiencies before more serious risk develops.
(7)
Multiple Dams. When dams are spaced so that the failure of an upstream dam or structure could endanger the safety of one downstream, the possibility of a multiple failure shall be considered in reviewing the design. Additional safety shall be provided in either structure by increasing the retarding storage or increasing the emergency spillway capacity, or both.
D.
Construction Requirements.
(1)
Construction shall be under the supervision of the engineer-in-charge as defined in §A(1) of this regulation.
(2)
Appropriate tests, as required by the Administration, shall be made of materials used in the construction of the dam. Materials failing to meet applicable specifications shall be removed and replaced with acceptable materials.
(3)
The engineer-in-charge shall submit periodic construction progress reports to the Administration. Progress report forms and the frequency of reporting will be provided by the Administration before construction.
(4)
A history of the construction shall be maintained by the engineer-in-charge, and shall include:
(a)
Date, location, and results of all materials tests made.
(b)
Narrative of problems encountered during construction and changes in design. Necessity for these changes shall be reported to the Administration for approval before proceeding with construction.
(c)
“As built” plans.
(5)
The above information shall be maintained at the construction site. The information shall be submitted to the Administration within 60 days after the completion of the dam and shall be accompanied by the written certification from the engineer-in-charge to the Administration that the completed structure has been constructed in accordance with plans and specifications and changes approved by the Administration. The Administration shall supply certification forms.
(6)
Before beginning the diversion of the streamflow through a temporary channel or conduit in order to dewater the foundation of the dam, the engineer-in-charge shall submit a plan to the Administration for approval describing the methods to be used for carrying the streamflow and keeping sediment reduced during this period. The engineer-in-charge shall be responsible for the implementation of the plan.
(7)
Before beginning the filling of the reservoir the engineer-in-charge shall submit a report to the Administration stating that the structure has been made ready for filling and that the pool area has been cleared of debris. The report shall describe the limitations on the amount of water restrained from flowing downstream and describe the methods to be followed for the surveillance of the project during the period when the structure is receiving its initial loading.
E.
Surveillance and Inspection of Completed Dams and Reservoirs.
(1)
Responsibility for Inspections by Owner. The owner is responsible for the safety of the dam and for the necessary surveillance and inspections. The surveillance shall be performed by the owner, or a representative of the owner, and shall provide a close watch on the conditions affecting the dam's safety. The owner shall promptly notify the Administration of significant changes in condition.
(2)
Responsibility for Inspections by Administration. In addition to the inspections by the owner, the Administration shall make inspections of all dams, reservoirs, and other waterway obstructions within its jurisdiction to provide for the public safety and welfare, to detect early signs of deterioration, and to enforce corrective measures. The Administration's agents shall be given free access to every part of the dam or reservoir under consideration, and the operators of these works shall assist in the inspection to the best of their abilities.
F.
Repair of Dams. Before beginning the repair of any dam or reservoir, the owner shall apply for, in writing, and secure the Administration's written approval of the contemplated action. The application shall give the name and address of the applicant, details of the proposed changes, referenced to the existing structure, and shall be accompanied by the necessary plans and specifications. If the proposed work may best be explained by description, this description shall be included as part of the application along with the proposed time of commencement and completion of construction, as well as such other information as the Administration may require. In the event of an emergency in which repairs are necessary to safeguard life and property against predicted immediate danger, these repairs shall be made immediately by the owner. In these events, the Administration shall be notified within 24 hours of the emergency repairs needed and the extent of work underway, if any, and the work shall conform to these requirements as specified by the Administration.
G.
Certain Small Ponds. Certain small ponds may be exempt from the permit requirements cited here if the plans and specifications are approved by either the appropriate soil conservation district or the Administration’s designee. The following shall apply to the approval of all ponds pursuant to Environment Article, §5-503(b), Annotated Code of Maryland:
(1)
The designs, plans, and specifications shall be reviewed for technical compliance with the requirements in USDA, Natural Resource Conservation Service, Maryland Conservation Practice, Standard Pond Code 378 (January, 2000), which is incorporated by reference in COMAR 26.17.02.01-1B(2), and the Administration’s policies and procedures.
(2)
The soil conservation district, or the Administration’s designee, shall notify the Administration of all ponds approved pursuant to this section. The notification shall include a copy of the pond approval and a pond summary sheet. The notification shall be submitted to the Administration within 30 days of the end of each quarter (September 30, December 31, March 31, and June 30) in which the approval was granted.
(3)
The soil conservation district, or the Administration’s designee, for all ponds approved pursuant to Environment Article, §5-503(b), Annotated Code of Maryland, shall submit a certification to the Administration within 90 days after the completion of construction. This certification shall state that the subject pond was constructed in conformance with the approved plans and specifications. A certification by a professional engineer, land surveyor, or landscape architect practicing in accordance with the laws of Maryland shall be acceptable to the Administration instead of a certification by the soil conservation district or the Administration’s designee.

Regulation .06 Bridges and Culverts.Copy Citation

A.
In addition to the general requirements as described in Regulation .04 of this chapter, the following information shall be submitted with all applications for bridges and culverts unless specifically waived by the Administration:
(1)
Alternate proposals studied.
(2)
Geologic investigations and conclusions based upon geologic maps, surface investigations, seismic or other geophysical studies, or borings.
(3)
Type and source (on-site or off-site) of borrow and fill materials to be used in construction.
(4)
Estimated cost of the project and the length of time required for construction.
(5)
Construction plans and specifications.
(6)
Construction Schedule. The construction schedule shall include the following:
(a)
The sequence of construction phases, such as channel and structure excavation, structure and embankment construction;
(b)
Equipment stream crossings and storage areas;
(c)
Means for diverting stream flow during construction;
(d)
Means for controlling the dewatering discharges;
(e)
Means for controlling runoff during the various construction phases.
(7)
Map and measurement of the drainage area upstream of the proposed project.
(8)
General plan of the proposed project, showing location; land ownership; contours of presently existing ground and proposed structures, buildings, roads and drainage structures; and the proposed additionally inundated area associated with the 100-year flood event.
(9)
Design report, which shall at a minimum, include the following:
(a)
Discharge-frequency curve, which shall include the discharge, in cubic feet per second, associated with the 2-year, 10-year, and 100-year frequency flood events;
(b)
Stage-discharge curve, which shall include the water surface elevation, in feet above mean sea level, associated with the 2-year, 10-year, and 100-year frequency flood events, for both the presently existing and the proposed conditions;
(c)
Slope, cross section, and capacity of the presently existing stream channel and average bankful velocity.
B.
Designs and Specifications.
(1)
References used by the designer shall be cited in the application submitted to the Administration, especially where unusual features are incorporated in the design.
(2)
Specifications shall be written to assure that design criteria, with regard to the quality of the materials and methods of construction, will be met or exceeded.
(3)
The length of culverts shall be limited to a maximum of 150 feet unless it can be demonstrated through an environmental study that any adverse impacts will be adequately mitigated.
(4)
The proposed project shall be designed to safely withstand the hydrostatic and hydrodynamic forces associated with at least the 100-year frequency flood event throughout the project area.
(5)
Adequate protection shall be provided in the design of all bridge piers, abutments, and culvert entrances and outlets to prevent damage due to scour. Protective measures may not prevent the passage of fish.
(6)
Culverts shall have at least one cell placed at least 1 foot below the invert of the stream. In the case of bedrock foundations, culverts shall be designed without a concrete invert unless measures are incorporated into the design to ensure that fish habitat or migration patterns are not adversely affected.
(7)
All bridges shall completely span stream channels which have a width from top-of-bank to top-of-bank of 80 feet or less, as measured along the centerline of the proposed roadway.
(8)
The outlet velocity of culverts which is associated with the dominant discharge may not exceed the existing stream channel velocity associated with the dominant discharge. A higher than existing stream channel velocity may be allowed at a culvert outlet when or if measures are incorporated into the design to prevent increases in stream channel erosion.
(9)
The maximum allowable Froude number, associated with the 100-year frequency flood event as calculated through the bridge opening or at the outlet of the culvert, shall be as follows:
(a)
0.9, if the presently existing Froude number is less than or equal to 0.9; or
(b)
The presently existing Froude number, if the presently existing Froude number is greater than 0.9.
(10)
The Froude number, Fr, shall be given by:
C.
Repair of Bridges and Culverts. Before commencing the repair of any bridge or culvert, the owner shall apply for, in writing, and obtain a permit from the Administration for the proposed work. The application for a permit shall give the name and address of the applicant, details of the proposed changes, referenced to the existing structure, and shall be accompanied by the necessary plans and specifications. If the proposed work may best be explained by description, this description shall be included as part of the application along with the proposed time of commencement and completion of construction, as well as other information the Administration may require.
D.
Emergency Repairs.
(1)
In an emergency, a person may make only the minimum repairs necessary to safeguard life and property against imminent danger without obtaining prior written approval of the Administration for the necessary emergency repairs.
(2)
The person initiating repairs shall contact the Administration within 24 hours.
(3)
To the extent possible, all work shall conform to the requirements specified by the Administration.
(4)
If additional works, maintenance, or repairs not necessary to safeguard life and property against imminent danger are also considered by the owner, the owner shall obtain a permit in accordance with Regulation .02 of this chapter.
(5)
Except as provided in §D(1) of this regulation:
(a)
The Administration shall be notified before any motorized equipment enters the stream channel; and
(b)
Approval from the Administration shall be obtained before any channel modifications are initiated in conjunction with emergency repairs.

Regulation .07 Changes in Stream Channels or Floodplains.Copy Citation

A.
In addition to the general requirements, as described in Regulation .04 of this chapter, the following special requirements shall apply to applications for changes in stream channels or floodplains. The following information shall be submitted with the application unless specifically waived by the Administration:
(1)
Alternate proposal studies.
(2)
Geologic investigations and conclusions based upon geologic maps, surface investigations, seismic or other geophysical studies, or borings.
(3)
Type and source of borrow and fill materials to be used in construction.
(4)
Estimated cost of the project and the length of time required for construction.
(5)
Construction plans and specifications.
(6)
Construction Schedule. The construction schedule shall include the following:
(a)
The sequence of construction excavation, structure, and embankment construction;
(b)
Equipment stream crossings and storage areas;
(c)
Means for diverting stream flow during construction;
(d)
Means for controlling the dewatering discharges;
(e)
Means for controlling runoff during the various construction phases.
(7)
Map and measurement of the drainage area upstream of the proposed project.
(8)
General plan of proposed project, showing location; land ownership; contours of presently existing ground and proposed fill or excavation; presently existing and proposed structures, buildings, roads, and drainage structures; the proposed additionally inundated area associated with the 100-year flood event; and all cross sections taken.
(9)
Design report, which shall, at a minimum, include the following:
(a)
Discharge-frequency curve, which shall include the discharge in cubic feet per second, associated with the 2-year, 10-year, and 100-year frequency flood events.
(b)
Slope, cross section, capacity, and velocity of the presently existing stream channel.
(c)
Water surface profiles computed using an energy balancing method, showing the invert elevation of the stream bed, water surface elevations in feet above mean sea level, and water velocity, by segment, in feet per second, associated with the 2-year, 10-year, and 100-year frequency flood events, for both the presently existing and proposed conditions, at each cross section. Cross sections shall be taken at appropriate intervals to a point, both downstream and upstream of the proposed project, where the presently existing and proposed water surface profiles coincide.
(d)
Cross section plots, showing stream and floodplain elevations as well as any proposed modifications and water surface elevations.
B.
Design and Specifications.
(1)
References used by the designer shall be cited in the application submitted to the Administration, especially where unusual features are incorporated in the design.
(2)
Specifications shall be written to assure that design criteria, with regard to the quality of the materials and methods of construction, will be met or exceeded.
(3)
Proposed floodplain encroachments may not increase the tractive force by more than 10 percent during the passage of the 2-year and 10-year frequency flood events unless it can be demonstrated that the channel will remain stable.
(4)
Proposed floodplain encroachments may not reduce the natural meander width of the channel as measured from outside bank to outside bank.
(5)
Proposed floodplain encroachments, except for roadways, culverts, and bridges, shall be designed to provide a minimum of 1 foot of freeboard above the elevation of the 100-year frequency flood event. In addition, the elevation of the lowest floor of all new or substantially improved residential, commercial, or industrial structures shall also be at least 1 foot above the elevation of the 100-year frequency flood event.
(6)
Proposed unlined earth channels may not change the tractive force associated with the 2-year and the 10-year frequency flood events, by more than 10 percent, throughout their length unless it can be demonstrated that the stream channel will remain stable.
(7)
Proposed lined channels may not change the tractive force associated with the 2-year and the 10-year frequency flood events, by more than 10 percent, at their downstream terminus unless it can be demonstrated that the stream channel will remain stable.
(8)
An environmental study, which identifies existing natural resources as well as proposed mitigation measures to offset the impacts of the channelization, shall accompany a proposed channel change.
C.
Repair. Before beginning the repair of any works permitted pursuant to this regulation, the owner shall apply for, in writing, and obtain a permit from the Administration for the proposed work. The application for a permit shall include the name and address of the applicant, details of the proposed changes, referenced to the existing structure, and shall be accompanied by the necessary plans and specifications. If the proposed work may best be explained by description, this description shall be included as part of the application along with the proposed time of commencement and completion of construction, as well as other information the Administration may require.
D.
Emergency Repairs.
(1)
In an emergency, a person:
(a)
May make the minimum repairs necessary to safeguard life and property against imminent danger without prior written approval of the Administration;
(b)
Shall notify promptly the Administration of the emergency repairs necessary and the extent of work underway;
(2)
Work shall conform to any requirements specified by the Administration.
(3)
If additional works, maintenance, or repairs not necessary to safeguard life and property against imminent danger are considered by the owner, a permit shall be required in accordance with Regulation .02 of this chapter.
(4)
In all cases, including emergencies described in §D(1)(a) of this regulation:
(a)
The Administration shall be notified before any motorized equipment enters the channel; and
(b)
Approval from the Administration shall be secured before any channel modifications are initiated in conjunction with emergency repairs.

Regulation .08 Temporary Construction in a Stream Channel or Floodplain.Copy Citation

A.
In addition to the general requirements as described in Regulation .04 of this chapter, the requirements in §§B—E of this regulation apply to applications for temporary changes in stream channels or floodplains unless specifically waived by the Administration.
B.
Temporary Sediment-Trapping Devices. The following special requirements shall apply to applications for temporary sediment-trapping devices within the waters of the State during construction operations:
(1)
Temporary sediment-trapping devices shall conform to the technical requirements in the "1983 Maryland Standards and Specifications for Soil Erosion and Sediment Control" which is incorporated by reference under COMAR 26.17.01.11;
(2)
Earth embankments greater than 3 feet high may not be permitted;
(3)
Temporary sediment control trapping devices may be constructed within the 100-year frequency floodplain if all of the following conditions are met:
(a)
Fill material may not be placed any closer to the stream than 50 percent of the distance between the 100-year frequency floodplain limit and the top of the stream bank closest to the trapping device;
(b)
Fill material may not be placed within 25 feet of the top of the stream bank;
(c)
Upon completion of the control device, all exposed soil areas shall be stabilized within 7 days following initial disturbance;
(d)
Care shall be taken during construction, maintenance, and removal of temporary sediment control devices to prevent unnecessary removal or damage to trees and other natural features;
(e)
Sediment removed during maintenance of the trapping device shall be placed outside the limits of the 100-year floodplain and stabilized within 14 days;
(f)
Upon stabilization of all areas that drain to the control device, the device shall be removed and all remaining disturbed areas returned to their original contour and permanently stabilized within 14 days;
(4)
The applicant shall submit the following information to the Administration:
(a)
A vicinity sketch indicating north arrow and scale and in such detail as to easily locate the proposed project;
(b)
A plan or plans at an appropriate scale indicating at least:
(i)
The existing topography and the proposed grading and earth disturbance to take place including indications of the volume of material and surface area involved, and any spoil or borrow involved,
(ii)
Storm drainage provisions, including data on the velocities of flow at outfalls and site conditions at points of discharge,
(iii)
Erosion and sediment control provisions including design details and schedule of application,
(iv)
Time schedule of construction indicating the anticipated start and completion of the project, and staging of the grading, storm drainage, utilities, and erosion and sediment control;
(c)
A general description of the predominant soil types on the site, as described by the appropriate soil survey information available through the soil conservation district from the U.S. Soil Conservation Service.
C.
Temporary Access Crossings. The following special requirements shall apply to applications for temporary access crossings within the waters of the State:
(1)
Temporary access crossings shall conform to the technical requirements in the "1983 Maryland Standards and Specifications for Soil Erosion and Sediment Control" which is incorporated by reference under COMAR 26.17.01.11;
(2)
Earth embankments for an access road greater than 3 feet high may not be permitted;
(3)
The applicant shall submit the following information to the Administration:
(a)
General plan of the proposed project showing:
(i)
Location;
(ii)
Land ownership;
(iii)
Cross section of presently existing stream channel;
(b)
Construction plans and specifications;
(c)
Type and source of materials to be used in construction;
(d)
Erosion and sediment control provisions including design details and schedule of application.
D.
Temporary Utility Crossings. The following special requirements shall apply to applications for utility crossings within the waters of the State that cross streams or floodplains and are either buried below the presently existing grade or are suspended above the 100-year frequency flood elevation, so that they do not cause any permanent damage to the course, current, or cross section of a stream or body of water, including the floodplain:
(1)
Temporary utility crossings shall conform to the technical requirements in the "1983 Maryland Standards and Specifications for Soil Erosion and Sediment Control" which is incorporated by reference under COMAR 26.17.01.11;
(2)
For stream crossings, the pipe or cable and any protective encasement shall either be buried a minimum of 3 feet below the stream bed, unless the Administration believes that a rigid bottomed stream bed exists, or be elevated a minimum of 1 foot above the 100-year frequency flood elevation;
(3)
Buried utilities and their appurtenances, except at stream crossings, shall be located such that a 25-foot wide buffer zone is maintained between the limits of construction and the nearest top of the stream bank.
(4)
The following information shall be submitted with the application:
(a)
Construction plans and specifications;
(b)
Type and source of materials to be used in construction;
(c)
Erosion and sediment control provisions including design details and schedule of application;
(d)
General plan of the proposed project showing:
(i)
Location;
(ii)
Land ownership;
(iii)
Cross section of presently existing stream channel;
(iv)
Existing topography.
E.
Storm Drain Outfalls. The following requirements apply to applications for temporary construction in the floodplain for outfall pipes, flumes, and ditches, providing there are no permanent alterations to the course, current, or cross section of a stream or body of water:
(1)
Construction shall conform to the technical requirements of the "1983 Maryland Standards and Specifications for Soil Erosion and Sediment Control" which is incorporated by reference under COMAR 26.17.01.11;
(2)
Permanent floodplain obstructions to flow may not be permitted;
(3)
The following information shall be submitted with the application:
(a)
General plan of the proposed project showing:
(i)
Location;
(ii)
Land ownership;
(iii)
Cross section of presently existing stream channel and proposed drainage outfall;
(b)
Construction plans and specifications;
(c)
Type and source of materials to be used in construction;
(d)
Erosion and sediment control provisions including design details and scheduled application;
(e)
Time schedule of construction indicating the anticipated start and completion of the project, and staging of the grading, storm drainage, utilities, and erosion and sediment control.

Regulation .09 Conduits, Pipes, or Other Devices Pertaining to the Potomac River.Copy Citation

The construction, reconstruction, alteration, or addition to any conduit, pipeline, wire cable, trestle, or other device, structure, or apparatus, in, under, through, or over the bed or waters of the Potomac River requires a waterway construction permit from the Administration. Any waterway construction permit issued for this construction shall be subject to the requirements of Regulation .08C of this chapter and permit charges as may be assessed by the Board of Public Works.

Regulation .10 General Waterway Construction Permit.Copy Citation

A.
A person shall be permitted by this regulation to make changes in the course, current, or cross section of waters of the State if:
(1)
Conditions specified in this regulation for those activities are met; and
(2)
The project is not located in the stream channel or floodplain of a wild and scenic river as defined in Natural Resources Article, §8-402, Annotated Code of Maryland.
B.
The changes permitted in §A of this regulation include:
(1)
Clearing and grading activities in the 100-year frequency floodplain when:
(a)
Less than 5,000 feet of land area and less than 100 cubic yards of earth are disturbed;
(b)
Habitable structures are not constructed; and
(c)
Permanent obstructions are not created that would affect the hydraulic characteristics of the waters of the State;
(2)
Temporary construction on the waters of the State which meet the special requirements of Regulation .08B, C, D, and E of this chapter; or
(3)
Minor maintenance and repair of existing structures that are located in the waters of the State.
C.
In addition to the conditions imposed on the categories of construction activities set forth in §§A and B of this regulation, an owner of a project site subject to the general waterway construction permit shall do all of the following:
(1)
Submit to the Administration an application for the planned construction activity, including:
(a)
Any required plans;
(b)
Specifications for screening and concurrence with this chapter;
(c)
The construction schedule; and
(d)
Anticipated dates of the beginning of construction activity;
(2)
Allow reasonable inspection of the site by representatives of the Administration;
(3)
Maintain construction plans and specifications at the construction site for reasonable inspection by the Administration during construction;
(4)
When applicable, obtain an approved sediment and erosion control plan from the local soil conservation district before construction; and
(5)
Provide for specifically designed measures, which shall be included in the construction plans, to minimize sediment pollutants from entering the waters of the State for those construction activities within a stream channel that are not subject to the requirements of COMAR 26.17.01.05, which requires an approved erosion and sediment control plan for certain activities.
D.
The Administration shall provide written concurrence for projects meeting the requirements of this regulation within 30 days of application submission if no review is requested by other agencies.

Regulation .11 Criteria for Evaluating Applications.Copy Citation

A.
The criteria described herein are presented to assist persons in preparing their permit applications and to provide a consistent basis for the Administration's decisions. The Administration shall follow the criteria, unless the Administration determines that the overall public interest requires a variance. In that case, written documentation justifying the variance shall have been submitted by the applicant and will be approved in writing by the Administration, for inclusion in the record. As the basis for approval, denial, or modification of a permit, the Administration shall weigh all public advantages and disadvantages. The administration shall grant the permit, if approval of the project is in the best public interest and the plans for the project provide for the greatest feasible utilization of the waters of the State, adequately preserve the public safety, and promote the general public welfare. The criteria described in Sec. B of this regulation shall apply to all applications. Depending on the purpose of the proposed project, additional specific criteria, as described in subsequent sections, shall also apply.
B.
General Criteria.
(1)
In all cases where the proposed project is on a stream in the State Scenic and Wild Rivers Program and, in the case of other streams, when necessary, the Administration shall advise the applicant of the outstanding scenic, fish, wildlife, and other recreation values to the citizens of the State. In these cases, the applicant shall consider alternatives less harmful to the stream's value as a scenic and wild resource. Construction of an impoundment upon a scenic or wild river is contrary to the public interest, if that project floods an area of unusual beauty, blocks the access to the public of a view previously enjoyed, or alters the stream's wild qualities.
(2)
A dam or other structure impeding the natural flow of a scenic and wild river may not be constructed, operated, or maintained in a scenic and wild river, and channelization may not be undertaken unless specifically approved. The Secretary's approval authority under Natural Article, §8-406, is delegated to the Director of the Water Resources Administration or the Director's designee. The Director or the designee shall consider the comments received from the Department of Natural Resources as well as the standards established in §B(1) of this regulation to protect the river's scenic and wild qualities.
(3)
In the evaluation of permit applications, the Administration shall consider the blockage of free passage of fish to be contrary to the public interest, except as provided in Natural Resources Article, §4-502(d), Annotated Code of Maryland.
(4)
Category II, III, or IV dams may not be built or allowed to impound water in any location where a failure is likely to result in the loss of human life or severe damage to streets, major roads, public utilities, or other high value property.
(5)
Proposed projects that eliminate or significantly and adversely affect aquatic or terrestrial habitat and their related flora and fauna are not in the public interest. At a minimum, all in-stream construction shall be prohibited from October through April, inclusive, for natural trout waters and from March through May, inclusive, for recreational trout waters. In addition, the construction of proposed projects, which may adversely affect anadromous fish spawning areas, shall be prohibited from March 15 through June 15, inclusive. For projects when there is no reasonable alternative to the adverse effects on nontidal wetlands or other aquatic or terrestrial habitat, the applicant shall be required to provide measures to mitigate, replace, or minimize the loss of habitat.
(6)
Proposed projects which increase the risk of flooding to other property owners are prohibited, unless that area subject to additional risk of flooding is purchased, placed in designated flood easement, or addressed by other means acceptable to the Administration.
(7)
The construction or substantial improvement of any residential, commercial, or industrial structure in the 100-year frequency floodplain and below the water surface elevation of the 100-year frequency flood may not be permitted. Minor maintenance and repair may be permitted. In addition, the modifications of existing structures for flood-proofing purposes may be permitted. Flood-proofing modifications shall be designed and constructed in accordance with specifications approved by the Administration.
C.
Flood Control Criteria.
(1)
Multiple purpose use shall be preferred over single purpose use.
(2)
The proposed project shall achieve the purposes intended.
(3)
At a minimum, the proposed project shall provide for a 50 percent reduction of the average annual flood damages.
(4)
Flood Control Techniques.
(a)
Flood control techniques that shall be considered include:
(i)
Relocation;
(ii)
Evaluation;
(iii)
Flood-proofing;
(iv)
Flood control dams;
(v)
Levees and dikes;
(vi)
Stormwater detention or retention structures;
(vii)
Flood warning systems;
(viii)
Public acquisition;
(ix)
Storm drain and stream maintenance;
(x)
Tax adjustment policies;
(xi)
Subdivision, zoning, and related ordinances; and
(xii)
Other practical methods.
(b)
Channelization shall be the least favored flood control technique.
(5)
The applicant shall provide a written analysis and financial statement detailing the benefits and costs of the project and identifying the project's beneficiaries. This information shall be made a part of the public record.
D.
Agricultural Drainage Criteria.
(1)
The Administration shall permit agricultural drainage only to the extent that it provides substantial agricultural benefits.
(2)
The design of the proposed channel shall prevent direct over bank flow into the ditch. This may be accomplished with reverse slopes, vegetated buffers, and controlled inlets.
(3)
The downstream end of the proposed system shall be truncated as far upstream as possible.
(4)
Approved soil conservation district conservation plans shall be properly implemented and maintained.
(5)
Measures shall be incorporated in the project to minimize adverse environmental impacts.
E.
Variances. If the Administration determines, from the information submitted in conjunction with the application, that the overall public interest requires a variance, the Administration may grant relief from the strict application of the criteria, upon request. All requests for variances shall be considered by the Administration in accordance with the following:
(1)
A variance may not be granted for any construction, development, use, or activity that would cause any increase in the 100-year frequency flood elevation unless the Administration finds the variance to be in the best public interest;
(2)
If granted, a variance shall involve only the least modification necessary to protect the public interest;
(3)
If a variance is granted, the Administration shall notify the applicant in writing that:
(a)
The granting of the variance may result in increased premium rates for flood insurance,
(b)
These variances may increase the risks to life and property;
(4)
Structures, including those involving variances, shall be designed and constructed so as to have the capability of resisting the hydrostatic and hydrodynamic loads and pressures, effects of buoyancy, and other forces associated with at least the 100-year frequency flood event.

Regulation .12 Violations of Statutory, Regulatory, or Permit Requirements.Copy Citation

A.
Action on Violation. If the Administration determines that there has been a violation of any provision of Environment Article, §§5-501—5-514, Annotated Code of Maryland, of any regulation, or of any permit, it shall cause a written complaint to be served upon the alleged violator. The complaint shall specify the nature of the violation. After, or concurrent with, service of the complaint, the Administration may exercise one of the following options:
(1)
Issue an administrative order requiring necessary corrective action to be taken within the time prescribed in its order. Any person named in the order may request in writing a hearing before the Administration not later than 10 days after the date the order is served, in which case a hearing shall be scheduled within 10 days from receipt of the request. A decision shall be rendered within 10 days from the date of the hearing.
(2)
Require the alleged violator to file a written report regarding the alleged violation.
(3)
Require the alleged violator to appear before the Administration at a time and place the Administration specifies to answer the charge outlined in the complaint.
(4)
Require the alleged violator to file a written report regarding the alleged violation and appear before the Administration at a time and place the Administration specifies to answer the charges outlined in the complaint. If the Administration exercises the option provided by §A(2) of this regulation, the alleged violator may request in writing a hearing before the Administration not later than 10 days after the date that notice of the requirement of the written report is served. The following apply:
(a)
The appearance of the alleged violator before the Administration under the options provided by §A(3) or (4) of this regulation constitutes an administrative hearing and the party has the right of any party in a contested case provided in State Government Article, §§10-201—10-217, Annotated Code of Maryland.
(b)
If the Administration exercises the option provided by §A(2), (3), or (4) of this regulation, it may not issue an order requiring corrective action to be taken as a result of the alleged violation before expiration of the time set for filing any report and holding any hearing required under these paragraphs. After that, the Administration may issue an order requiring necessary corrective action to be taken within the time prescribed in the order. A person is not entitled to a hearing before the Administration as a result of this order.
(c)
Notice of a hearing or of a requirement that a written report be filed shall be served on the alleged violator personally or by certified or registered mail to his last known post office address not less than 10 days before the time set for the hearing or filing of a report.
(d)
Each order the Administration issues under the provisions of this section shall be served on the person affected personally or by certified or registered mail to his last known post office address. The order shall become effective immediately according to its terms upon service.
B.
Administrative Action With Regard to Permit. Upon failure by the owner to comply with the requirements of an administrative order, a permit may be modified or suspended. Modification or suspension of a permit shall be effective without stay upon receipt by the owner of appropriate notice. Upon written request for a hearing by the owner in accordance with the procedure specified in §A of this regulation, a hearing shall be held, but the administrative action may not be stayed pending the hearing.
C.
Emergency Action. Under emergency conditions, such as violation or imminent violation of any applicable State requirement, a permit may be modified or suspended. Modification or suspension of a permit shall be effective without stay upon receipt by the permittee of appropriate notice. Upon written request by the permittee for a hearing before the Administration, in accordance with the procedure specified in §A of this regulation, a hearing will be held, but the administrative action may not be stayed pending the hearing.
D.
Permit Review. The Administration may review any permit which it has issued in order to determine whether the:
(1)
Conditions of the permit have been satisfied; or
(2)
Permit should properly be modified, suspended, or revoked.
E.
Permit Modification. If it is found that amendments and changes are necessary to insure safety or for other valid reasons, the Administration may order or permit the necessary revision of plans and specifications. However, if conditions are revealed which will not permit safe construction, the permit shall be revoked.
F.
Permit Revocation.
(1)
A permit may be revoked after notice to the permittee and opportunity for a hearing if the Administration determines that any of the following have occurred:
(a)
The permittee has failed to comply with the requirements of an administrative action pursuant to §A, D, or E of this regulation;
(b)
False or inaccurate information was contained in the application for the permit;
(c)
Conditions or requirements of the permit have been or are about to be violated;
(d)
Substantial deviation from plans, specifications, or requirements has occurred;
(e)
The permittee has failed to allow an authorized representative of the Administration upon presentation of proper credentials to:
(i)
Enter at any reasonable time upon permittee's premises where the structure is located, pertinent operations are conducted, or records are required to be kept under terms and conditions of the permit;
(ii)
Have access to and copy any records required to be kept under terms and conditions of the permit;
(iii)
Inspect facilities to insure compliance with the conditions of the permit;
(iv)
Inspect any monitoring equipment or method required in the permit;
(f)
Change in conditions exists requiring temporary or permanent modification or elimination of the permitted operation.
(2)
The permittee has the right to be heard regarding the revocation of the permit upon a request in writing not later than 10 days after the date on which the revocation notice is served. The Administration shall schedule a hearing within 10 days from receipt of the request and give a decision within 30 days from the date of the hearing.
G.
Statutory Remedies. The provisions of the regulation may not be construed to limit or otherwise affect the authority of the Administration to proceed against violators pursuant to Environment Article, §§5-513 and 5-514, Annotated Code of Maryland.

Regulation .13 Public Hearings.Copy Citation

A.
Except as provided otherwise in this section, the Administration shall provide notice of an opportunity for a public hearing, within 1 month after filing an application for a permit to:
(1)
Construct or reconstruct a reservoir, dam, or other waterway obstruction;
(2)
Construct a waterway; or
(3)
Dredge, fill, bulkhead, or change the shoreline as required by this chapter.
B.
The provisions of this regulation do not apply to those projects that meet the criteria established for a general waterway construction permit as specified in Regulation .10 of this chapter.
C.
The Administration may waive holding a public hearing on any application, if:
(1)
There is an emergency to save life or property;
(2)
There is a request to make minor repairs or routine maintenance;
(3)
Roads, bridges, or culverts meet minimum design standards set forth herein and the construction does not adversely affect known water resources projects or have potentially significant adverse environmental effects;
(4)
Dams are classed by the Administration in Category IV;
(5)
Plans of other projects that conform to water resources development plans accepted and adopted by the Administration were subject to public hearing and the Administration's review finds no changed conditions in them since the last public review and comment to justify another hearing;
(6)
Temporary construction meeting the minimum design standards set forth herein;
(7)
There is a request to make minor changes or modifications to existing permits.
D.
The notice for and conduct of the public hearing shall be in conformance with COMAR 26.01.07. The notice for the public hearing shall be made upon the acceptance of a complete application, as follows:
(1)
The Administration shall prepare and insert the notice in the Maryland Register and required newspapers. The cost of this notice shall be borne by the applicant.
(2)
The applicant shall, by the date of publication of the above notice in the Maryland Register, notify all of the following of the application and hearing and certify same to the Administration before or at the hearing:
(a)
All adjacent property owners;
(b)
The mayor or chief executive official of each affected municipality;
(c)
The legislative body and chief executive official of each affected county;
(d)
The soil conservation districts affected; and
(e)
Other persons, as requested in writing by the Administration.

Chapter 05. Flood Management Grant Program

Regulation .01 Definitions.Copy Citation

A.
In this chapter, the following terms have the meanings indicated. Terms not defined below shall have the meanings given to them in the relevant statutes or, if not defined in statutes, the meanings attributed by common use. The terms “Department”, “federal flood insurance program”, “100-year flood event”, and “subdivision” are defined in the Environment Article, Annotated Code of Maryland. The definitions for these terms are provided below as a convenience, but persons affected by the Department's regulations should be aware that these definitions are subject to amendment by the General Assembly.
B.
Terms Defined.
(1)
“Administration” means the Water Management Administration.
(2)
“Capital project” means any flood control or watershed management capital project which:
(a)
Reduces flood hazards;
(b)
Has an expected useful life of at least 15 years;
(c)
May include public acquisition or structural methods; and
(d)
Does not include the following associated elements of any project:
(i)
Research,
(ii)
Planning,
(iii)
Study,
(iv)
Operation,
(v)
Repair, or
(vi)
Maintenance.
(3)
“Department” means the Department of the Environment.
(4)
“Flood management plan” means a plan to guide activities in a watershed for the purpose of minimizing the hazards of flooding and preserving the biological values associated with the land and water resources, pursuant to Environment Article, Title 5, Subtitle 8, Annotated Code of Maryland.
(5)
“Federal flood insurance program” means the program established by the National Flood Insurance Act of 1968, as amended.
(6)
"100-year flood event" or "100-year flood" means a flood that has a 1-percent chance of being equalled or exceeded in any given year.
(7)
“Subdivision” means any county, including Baltimore City. The term “subdivision” also means any incorporated municipality which has the authority to adopt and enforce land use and control measures for the areas within its jurisdiction.
(8)
“Ultimate development” means the anticipated development during the expected useful life of the capital project.

Regulation .02 General Requirements.Copy Citation

A.
Establishment of Annual State Priority List for Capital Projects. Before May 1, 1984 and before the first of May each year after that, each participating subdivision shall submit applications, in priority order, for capital projects which are included in approved flood management plans to the Department. Upon review and evaluation of the submitted capital projects, an annual State priority list for capital projects shall be adopted by the Department. This list will be the basis for grants to the subdivisions and will specify the Department's share of the eligible project cost.
B.
Adoption of the Annual Priority List. Before adopting the annual State priority list, the Department shall notify the affected subdivisions of its intended action and afford reasonable opportunity for comment. The approval of a flood management plan does not determine the position of a capital project on the priority list.
C.
Criteria for Priorities.
(1)
The purpose of ranking the individual capital projects in the State priority list is to ensure the greatest benefits from the investment of public money. The ranking will be based on the type of capital project, flood history, and cost effectiveness and implementation schedule of the flood management plan.
(2)
The types of capital projects which will be preferred shall:
(a)
Be permanent solutions to existing flood hazards and not require continuing operation, maintenance, or repair; and
(b)
Minimize environmental impacts.
(3)
Flood history will consider the:
(a)
Magnitude and frequency of past flood events;
(b)
Damages resulting from past flood events; and
(c)
Danger to public health and welfare.
(4)
The cost effectiveness will consider the:
(a)
Cost of the capital project and total cost of the flood management plan;
(b)
Direct damages prevented;
(c)
Indirect costs prevented such as work closings, environmental damage, or personal inconvenience;
(d)
Benefits created such as recreational opportunities, open space, ecological enhancement, hydrologic improvements, water quality improvements, or water supply; and
(e)
Life of the project and possibility of future expenditures such as maintenance, repair, or replacement.
D.
All land acquired shall be dedicated to open space or recreation.
E.
These regulations establish procedures for the implementation of the Maryland Flood Management Grant Program and are not intended to create procedural or substantive rights in any person except the Department.

Regulation .03 Applications for a Grant.Copy Citation

A.
Scope. Subdivisions may apply to the Department for grants to assist in flood control and watershed management capital projects if all the following conditions are met:
(1)
It has the authority to make an application and has been authorized by an official act of the governing body directing this action. If the applicant is other than a county or Baltimore City, it must provide written certification from its legal counsel that it is a subdivision as defined in Regulation .01B(7) of this chapter.
(2)
It will have funds available to meet its share of the capital project.
(3)
It is participating in and is in conformance with the federal flood insurance program.
(4)
The capital project is part of a flood management plan approved by the Department and adopted by the subdivision pursuant to Environment Article, Title 5, Subtitle 8, Annotated Code of Maryland.
B.
All applications to the Department shall:
(1)
Reference the approved and adopted flood management plan of which the capital project is a part;
(2)
Specify the exact location of the capital project;
(3)
Specify the anticipated results of the capital project and furnish any substantiation required by the Department;
(4)
Evaluate alternative management techniques;
(5)
Specify the operation and maintenance arrangements for the life of the project;
(6)
Specify the use or disposition of acquired property;
(7)
Specify the expected useful life of the project;
(8)
Identify the short-term and long-term beneficial and adverse environmental effects of the capital project and any mitigating measures for the adverse impacts;
(9)
Identify all beneficiaries and the estimated current dollar value of the benefits and costs of the capital project;
(10)
Certify that the value or interest in properties proposed for acquisition will be established by two qualified appraisers prior to implementation; and
(11)
List all necessary federal, State, and local permits and certify that all these permits have been or will be applied for and will be obtained before implementation of the capital project.
C.
Unless otherwise specified, all hydrologic calculations shall be based on the ultimate development of the watershed. If the project requires computations of flood frequencies and flows, the methods and computations shall be available in sufficient detail for the Department to determine their validity.
D.
The approval of a capital project for a grant does not waive the requirements for any applicable State permits. If the capital project requires a permit from the Department, detailed information need not be duplicated. A statement on the grant application that the information is available in the permit application will be sufficient.
E.
All applications and information required by these regulations shall be submitted to the Department, in a manner and form acceptable to the Department, before the Department takes final action on the application.
F.
The application shall be submitted by the applicant to the Maryland State Clearinghouse in accordance with standard Clearinghouse procedures as described by the Office of Planning. The standard Clearinghouse procedures are based on the provision of OMB Circular A-95 and the application is subject to the applicable requirements and procedures contained in the Circular. Final action shall not be taken by the Department until the State Clearinghouse response has been received by the Department.
G.
The chief executive officer of the subdivision shall sign the application.

Regulation .04 Flood Management Plans.Copy Citation

A.
Flood management plans are to guide activities in a watershed so that flood hazards are minimized, while preserving the biological values associated with the land and water resources. They will be developed for each watershed in accordance with Environment Article, Title 5, Subtitle 8, Annotated Code of Maryland, to attain all the following goals:
(1)
Reduction of existing flood hazards;
(2)
Prevention of future flood hazards;
(3)
Adequate emergency preparedness;
(4)
Preservation of the environmental qualities of the watershed; and
(5)
Reduction of economic and social losses.
B.
A flood management plan shall contain, but not be limited to, the following:
(1)
The limits of the watershed;
(2)
An inventory of historic flood damage sites, including frequency and damage estimates;
(3)
An inventory of areas of significant natural resource value as noted in existing state and local studies;
(4)
An inventory of areas of historical and archeological value identified in existing state and local studies;
(5)
A map or series of maps showing features of the watershed pertinent to the flood management plan;
(6)
The relationship of the flood management plan to related programs in the watershed including the federal flood insurance program, the sediment control program, and the State water pollution and abatement program, and Program Open Space;
(7)
The following information, based upon the ultimate development of the watershed and flood events up to and including the 100-year flood:
(a)
A description of potential flood damages;
(b)
An assessment of all available flood mitigation techniques, their costs and hydrologic impacts;
(c)
The selected projects and techniques necessary to mitigate flood damages; and
(d)
Any environmental, social, and economic implications of the proposed flood mitigation techniques;
(8)
A schedule of expected implementation of all capital projects and other pertinent elements of the flood management plan;
(9)
Identification of measures to be taken before, during, and immediately after a flood disaster including:
(a)
Warning and evacuation for known flood hazard areas, and
(b)
Post-disaster activities which would minimize both present and future damages;
(10)
Any stormwater management requirements and techniques necessary to mitigate the adverse effects of land use changes on stream flows and flood frequencies; and
(11)
Any rules, regulations, or ordinances necessary for implementation and hazard mitigation.

Regulation .05 Procedures.Copy Citation

A.
General. If the Department approves a capital project and it falls within the limits of the funds available according to the annual priority list, a proposal for funding the capital project with appropriate conditions will be presented, along with reviews from appropriate agencies, to the Board of Public Works for approval and commitment of funds. No project will be submitted to the Board of Public Works until the subdivision certifies that its share of the funds is available and that it will properly operate and maintain the project to assure that the project benefits are realized.
B.
Department's Share of Capital Project Cost. The amount of any grant made by the Department may be up to 75 percent of the funding of a flood management project that does not receive federal funds. The Department may provide up to 50 percent of the nonfederal share of the funding for a project which receives federal funds and meets the criteria of these regulations and Environment Article, Title 5, Subtitle 8, Annotated Code of Maryland, but may not exceed the amount of local funds.
C.
Recovery of Grant. The Department may investigate, inspect, or audit any capital project involving grant funds. If the Department determines that the capital project is not being performed according to the approved application or flood management plan, the Department may withhold funding and require reimbursement by the subdivision.

Chapter 06. Water Appropriation or Use

Regulation .01 Definitions.Copy Citation

A.
In this chapter, the following terms have the meanings indicated.
B.
Terms Defined.
(1)
“Agricultural purposes” means appropriation or use of water for the production, harvesting, or processing of crops, vegetation, or animals for human or animal consumption or use, including horticultural operations and land-based aquaculture.
(2)
“Appropriation” means an intentional withdrawal, movement, or diversion of water for use from its source of natural occurrence which is caused by human activity.
(3)
“Aquaculture” means the regulation and cultivation of water plants and animals for human use or consumption.
(4)
“Aquifer” means a water-bearing geologic formation which is capable of causing water to flow into a well.
(5)
“Beneficial appropriation or use” means a direct use of water which is:
(a)
Necessary to a permit applicant;
(b)
Nonwasteful;
(c)
Reasonably nondamaging to the resource and other users; and
(d)
In the best interest of the public.
(6)
“Confined aquifer” means an aquifer under pressure from a relatively impervious layer of material lying above the aquifer.
(7)
“Consumptive water use” means that part of water withdrawn from a source which, due to evaporation, interbasin diversions, or other causes, is not returned to the source to be available for subsequent use.
(8)
“Department” means the Department of the Environment.
(9)
“Domestic use” means the noncommercial appropriation or use of water by individuals for residential sanitation and drinking purposes.
(10)
“Emergency condition” means a situation when lack of water poses an immediate danger to the health and welfare of people or animals.
(11)
“Fall line” means the imaginary line separating the coastal plain sediments on the east from the older hardened rock on the west.
(12)
“Ground water” means water that naturally lies, percolates, or flows through aquifers under the surface of the earth.
(13)
“Lake” means a reasonably permanent body of water substantially at rest which is part of a watercourse or the result of a structure placed in a watercourse.
(14)
“Low flow augmentation” means provision of water through development of new water storage facilities or the purchase of storage space in existing water storage facilities equal to the amount of consumptive use from a water source.
(15)
“Permit” means either a:
(a)
Ground water appropriation or use permit; or
(b)
Surface water appropriation or use permit.
(16)
Person.
(a)
“Person” means an individual, partnership, copartnership, firm, company, corporation, association, joint stock company, trust estate, governmental entity, or any other legal entity, or their legal representatives, agents, or assigns.
(b)
“Person” includes all federal, State, and local governmental entities.
(17)
“Potentiometric surface” means a level to which water will rise in a tightly cased well drilled into a confined aquifer.
(18)
Public Water System.
(a)
“Public water system” means a system that provides to the public water for human consumption through pipes or other constructed conveyances and:
(i)
Has at least 15 service connections; or
(ii)
Regularly serves at least 25 individuals daily at least 60 days out of the year.
(b)
“Public water system” includes:
(i)
Any collection, treatment, storage, or distribution facility that is under the control of the operator of the system and is used primarily in connection with the system; and
(ii)
Any collection or pretreatment storage facility that is not under the control of the operator of the system and is used primarily in connection with the system.
(19)
“Riparian land” means land bordering on a watercourse or lake.
(20)
“Surface water” means water from rain, melting snow, springs, or seepage that lies or flows on the surface of the earth, including a watercourse, lake, or tidewater.
(21)
“Sustained yield” means the availability of water from an aquifer managed so that total withdrawals do not exceed natural recharge, thus enabling the aquifer to function as an aquifer in perpetuity.
(22)
“Underground water” means ground water.
(23)
“Use of water” means a direct use of ground or surface water by withdrawal, diversion, or impoundment.
(24)
“Water audit” means an examination of water use that traces the flow of water from the site of water withdrawal through the distribution system and final use of the water, and details the variety of consumption and losses that exist from withdrawal through final use.
(25)
“Water conservation” means the use of practices, techniques, and technologies that:
(a)
Reduce the consumption, loss, or waste of water;
(b)
Improve efficiency in the use of water; or
(c)
Make more efficient use of water treatment infrastructure.
(26)
“Water supply capacity management plan” means a plan that analyzes available water supply capacity and establishes a system to track water allocation commitments.
(27)
“Watercourse” means a stream of water of natural origin, flowing constantly or intermittently on the surface of the earth in a relatively definite natural channel, including springs, lakes, or marshes in which a stream originates or through which it flows.
(28)
“Water management strategy area” means an area designated by the Department in which a specific water resource problem has been identified and for which the Department has adopted specific water use restrictions or criteria for permit approval in order to protect the water resource or existing water users.
(29)
“Water table” means the water-saturated zone which is:
(a)
First encountered when drilling into the earth's surface; and
(b)
Not a confined aquifer.

Regulation .02 Statement of Policy.Copy Citation

A.
The General Assembly recognizes that the availability of adequate water supplies is essential to health, safety, and economic welfare. To conserve and protect water resources of the State in the best interest of the people, the Department is authorized to control appropriation or use of surface and ground waters. This control provides for the greatest possible use of waters in the State, while protecting the State's valuable water supply resources from mismanagement, abuse, or overuse. The State's water supply resources include watercourses, lakes, aquifers, tidal areas, and other bodies of water in the State. Private property owners have the right to make reasonable use of the waters of the State which cross or are adjacent to their land. For the benefit of the public, the Department acts as the State's trustee of its water resources.
B.
Maryland follows the reasonable use doctrine to determine a person's right to appropriate or use surface or ground water. A ground water appropriation or use permit or a surface water appropriation or use permit issued by the Department authorizes the permittee to make reasonable use of the waters of the State without unreasonable interference with other persons also attempting to make reasonable use of water. The permittee may not unreasonably harm the water resources of the State.

Regulation .03 Scope and Applicability.Copy Citation

A.
With the exception of those persons listed in §B of this regulation, a person shall obtain a permit from the Department before appropriating or using waters of the State. A person who shall obtain a permit from the Department includes:
(1)
A person appropriating or using water for any agricultural, commercial, institutional, industrial, or municipal purpose;
(2)
A person subdividing land if the subdivision may require an appropriation or use of waters of the State whether from a central source or a source located on each subsequently created lot;
(3)
A person planning to build any structure or impoundment which will horizontally or vertically move water from its source of natural occurrence;
(4)
A person appropriating or using surface water or ground water for domestic heating or cooling.
B.
A person is not required to obtain a permit from the Department if that person is appropriating or using water for:
(1)
Agricultural purposes if the average annual use is less than 10,000 gallons per day;
(2)
Residential subdivisions of ten or fewer lots if:
(a)
The water is obtained from individual wells located on each lot,
(b)
For properties located west of the fall line only, the average lot size is not less than 1 acre, and
(c)
The subdivision is not located within a water management strategy area;
(3)
Temporary dewatering during construction if:
(a)
The duration of the dewatering including any intermittent periods of nonpumping is expected to last for less than 30 calendar days, and
(b)
The appropriation does not exceed an average of 10,000 gallons per day (gpd);
(4)
Domestic uses other than for heating or cooling; or
(5)
Extinguishing a fire.
C.
Compliance with the regulations in this chapter does not exempt any person making an appropriation or use of waters of the State within the Susquehanna River Basin from the requirements of the Susquehanna River Basin Commission.

Regulation .04 Incorporation by Reference.Copy Citation

Application for Water Allocation: Guidance Document for Public Water Systems Providing Groundwater to Municipal Corporations or Priority Funding Areas in Carroll, Frederick, and Washington Counties (June 2014) is incorporated by reference.

Regulation .05 Water Appropriation or Use Permit Application Procedures.Copy Citation

A.
Application Procedures for Applicant.
(1)
An applicant may not build or operate a structure requiring a permit until the Department has issued the permit.
(2)
The applicant shall apply for a permit on forms provided by the Department.
(3)
The applicant shall state the specific water use or uses intended under the permit.
(4)
Except for applicants proposing to appropriate or use water for agricultural purposes, the applicant shall include the following information with the application:
(a)
A map (U.S. Geological Survey 7 1/2 minute Quadrangle Series, 1:24000 scale) showing the location of the proposed appropriation or use and the area or structure in which the water use will occur;
(b)
The anticipated average daily appropriation calculated on an annual basis for the year projected to have the highest average daily use during the permit period;
(c)
For a requested appropriation or use of ground water, the anticipated average daily appropriation during the month of highest use;
(d)
For a requested appropriation or use of surface water, the anticipated maximum daily appropriation or use during the permit period; and
(e)
Complete plans and specifications for any facility or structure requiring a permit.
(5)
For persons proposing to appropriate or use water for agricultural purposes, the Department shall work with the applicant to determine:
(a)
The anticipated average daily appropriation calculated on an annual basis for the year projected to have the highest average daily use during the permit period; and
(b)
For a requested appropriation or use of:
(i)
Ground water, the anticipated average daily appropriation during the month of highest use, or
(ii)
Surface water, the anticipated maximum daily appropriation or use during the permit period.
(6)
For each housing subdivision or other construction project which may be completed in phases, the applicant shall state the total ultimate water requirements for total development of the site during the permit period.
(7)
If a requested appropriation or use is for more than an annual average of 10,000 gallons per day, the applicant shall comply with the notification requirements in COMAR 26.01.07.03.
(8)
If a requested appropriation or use is for more than an annual average of 10,000 gallons per day, the applicant shall certify on a form provided by the Department that water-conserving fixtures associated with the appropriation or use shall conform to the requirements of Business Occupations and Professions Article, §12-205, Annotated Code of Maryland.
(9)
The Department may require the applicant to conduct special evaluations, including:
(a)
Water quality analyses, well-pumping tests, or geophysical well logging for proposed ground water appropriations;
(b)
Water quality analyses, watercourse flow measurements, or aquatic habitat evaluations for proposed surface water withdrawals;
(c)
Water audits, water supply capacity management plans, water conservation plans, or estimates of distribution system leakage; and
(d)
For public water systems requesting special consideration under Environment Article, §5-501(b), Annotated Code of Maryland, evaluations as described in Applications for Water Allocation: Guidance Document for Public Water Systems Providing Water to Municipal Corporations or Priority Funding Areas in Carroll, Frederick, and Washington Counties (June 2014).
B.
Application Processing Procedures for the Department.
(1)
Except for applications that propose to appropriate or use water for agricultural purposes:
(a)
The Department shall review an application for completeness and consistency with State water resources plans and may consider, when appropriate, the consistency of an application with local land use and zoning requirements;
(b)
If the application is incomplete or prepared improperly, the Department shall notify the applicant as to what steps are necessary to complete the application; and
(c)
An application is incomplete until the applicant provides all information requested by the Department and the Department completes its technical evaluation of that information.
(2)
If the applicant does not respond within 6 months to the Department's request for additional information, the Department may notify the applicant that the application process has been terminated. To reactivate the closed file, the applicant shall reapply and may be required to submit new or updated evaluations.
(3)
The Department shall provide notice and opportunity to submit comments and to request a public informational hearing in accordance with COMAR 26.01.07.03 and .04.
(4)
The Department shall conduct public informational hearings in accordance with COMAR 26.01.07.06.

Regulation .06 Criteria for Approval of Water Appropriation or Use Permits.Copy Citation

A.
General. The Department shall issue a permit only for a beneficial appropriation or use under the following criteria:
(1)
The amount of water to be appropriated is reasonable in relation to the anticipated level of use during the permit period;
(2)
The requested appropriation or use does not have an unreasonable impact on:
(a)
The waters of the State, and
(b)
Other users of the waters of the State.
B.
Criteria for Determining Reasonableness.
(1)
Except for applications proposing to appropriate or use water for agricultural purposes, the Department, in determining the reasonableness of a proposed appropriation or use, may consider, when appropriate, the following factors:
(a)
The protection of existing water uses, land values, investments, and enterprises; and
(b)
The financial hardship of requiring a new user to bear the loss of potential harm as provided in §D(1) of this regulation.
(2)
In determining the reasonableness of a proposed appropriation or use, the Department shall consider, when appropriate, the following factors:
(a)
The purpose of the use;
(b)
The suitability of the use to the watercourse, lake, or aquifer;
(c)
The extent and the amount of the harm it may cause;
(d)
The practicality of avoiding the harm by adjusting the proposed use or method of use of the applicant or another permittee;
(e)
The practicality of adjusting the quantity of water used by each permittee;
(f)
Aggregate changes and cumulative impact that this and future appropriations in an area may have on the waters of the State;
(g)
The contribution that the proposed appropriation may make to future degradation of the waters of the State;
(h)
Whether the proposed appropriation or use is located within a water management strategy area;
(i)
The ability of a well or spring to sustainably yield the requested amount of the appropriation; and
(j)
Whether the proposed appropriation in Carroll, Frederick, or Washington County will provide groundwater:
(i)
To a municipal corporation, not including those areas annexed after January 1, 2000; or
(ii)
To a priority funding area established on or before January 1, 2000, under State Finance and Procurement Article, §5-7b-02(7), Annotated Code of Maryland.
C.
Special Criteria for Issuance of Surface Water Appropriation or Use Permits.
(1)
Except for permits issued for the appropriation and use of water for agricultural purposes, the Department may condition approval of a surface water appropriation or use permit on the permittee's provision of low flow augmentation to offset consumptive use during low flow periods to protect other users of the water and to protect the resource.
(2)
A surface water appropriation or use may be conditioned on the maintenance, by the permittee, of a required minimum flow past the point of appropriation to protect other users of the water and to protect flora and fauna within the watercourse.
(3)
Surface water appropriated or used for non-industrial heating or cooling shall be returned to the watercourse or lake from which it was appropriated.
(4)
If the Department determines that a proposed appropriation from a surface water source would unreasonably harm the resource or other users of the resource, the Department may deny the permit and advise the applicant to file a new application for an appropriation from a different source.
D.
Special Criteria for Issuance of Ground Water Appropriation or Use Permit.
(1)
Except for applicants proposing to appropriate or use water for agricultural purposes, if an applicant intends to appropriate ground water in unprecedented quantities for purposes not common to a locality, and the appropriation would cause harm to other users by lowering the water table or potentiometric surface below a level which would render the users' wells unusable, the Department may condition the issuance of the ground water appropriation or use permit on payment by the permittee of the cost of improving neighboring facilities or on mitigation of the impact on nearby users.
(2)
The Department may not issue a ground water appropriation or use permit if the proposed withdrawal of ground water will directly and substantially affect a watercourse or lake and thereby cause unreasonable harm to a person entitled to the use of water from the affected watercourse or lake.
(3)
The Department may not issue a ground water appropriation or use permit for an appropriation from a confined aquifer if the appropriation, either by itself or in combination with existing appropriations, will exceed the sustained yield of the aquifer.
(4)
The regional sustained yield potentiometric surface of a confined aquifer may not be lowered below 80 percent of the drawdown available between the top of the aquifer and the historical prepumping level of the potentiometric surface. In this regulation, “regional” means an area in which water is appropriated or used from multiple wells located in a common source, or that location which, as a result of the appropriation, is 50 percent of the distance from a single well to a point where the potentiometric surface is lowered 1 foot, and has stabilized.
(5)
The permittee may not place a submersible well pump or water intake part of a well pump lower than the top of the confined aquifer from which the water is being withdrawn.
(6)
Appropriation from an Unconfined Aquifer.
(a)
The Department may not issue a water appropriation or use permit in excess of 5,000 gallons per day as an average annual use from an unconfined aquifer, unless the Department finds that the appropriation is sustainable by recharge to the aquifer.
(b)
Priority may be given to public water systems requesting special consideration under Environment Article, §5-501(b), Annotated Code of Maryland, as outlined in Application for Water Allocation: Guidance Document for Public Water Systems Providing Water to Municipal Corporations or Priority Funding Areas in Carroll, Frederick, and Washington Counties (June 2014).
(7)
The Department may not issue a ground water appropriation or use permit to an applicant proposing to appropriate ground water for a housing subdivision located west of the fall line, if the water is to be obtained from individual wells on each residential lot where the average lot size is less than 1 acre.
(8)
The Department may not issue a ground water appropriation or use permit if the proposed appropriation will cause or contribute to the intrusion of saltwater into a freshwater aquifer.
(9)
The Department may not issue a ground water appropriation or use permit for non-industrial heating or cooling unless the ground water is returned to the aquifer from which it is withdrawn.
(10)
The Department may not issue a permit for a new appropriation or an increase to an existing appropriation of water from a well which draws water from more than one confined aquifer.
(11)
If the Department determines that a proposed appropriation from an aquifer would unreasonably harm the aquifer or other users of the aquifer, the Department may deny the permit and advise the applicant to file a new application for an appropriation from a different aquifer.

Regulation .07 Water Appropriation or Use Permit Conditions.Copy Citation

A.
General.
(1)
The permit period shall be 12 years unless the Department determines that a shorter period is appropriate.
(2)
A permit shall contain an effective date, an expiration date, and a date the permittee first appropriated water at the site.
(3)
A permit shall contain conditions limiting the average daily appropriation or use to a quantity specified by the Department. In addition, a ground water appropriation or use permit shall limit the average daily appropriation during the month of highest use, and a surface water appropriation or use permit shall limit the maximum daily appropriation to quantities specified by the Department.
(4)
A permit shall specify the purpose of the appropriation or use and the source and location of the appropriation or use.
(5)
A permit shall contain a condition allowing authorized representatives of the Department to have access to the permittee's facilities to conduct reasonable inspections and evaluations necessary to assure compliance with the permit. The permittee shall provide such assistance as may be necessary to effectively and safely conduct the inspections and evaluations.
(6)
To renew a permit, the permittee shall file a renewal application with the Department not later than 2 weeks before the expiration date on the permit.
(7)
The Department may suspend or revoke a permit for violating the conditions of the permit, the regulations in this chapter, or the provisions of Environment Article, Title 5, Subtitle 5, Annotated Code of Maryland.
(8)
A permittee shall obtain a new permit before making a change in appropriation or use which would result in a new use, quantity, source, or place of use.
(9)
A permit may not be transferred without the prior written approval of the Department. If approved, the Department shall issue a new permit, which may contain new conditions at the discretion of the Department. A permittee who wants to convey a water appropriation or use permit, and the person who wants to obtain the permit shall each state their intentions in writing to the Department.
(10)
The Department may inactivate a permit after written notice to the permittee, if it finds that water is no longer being appropriated or used under that permit.
B.
Non-Agricultural Water Appropriation and Use Permits.
(1)
This section does not apply to permits issued for the appropriation and use of water for agricultural purposes.
(2)
The Department shall review an active permit at least once every 3 years, or more frequently at the discretion of the Department. During a permit review, the Department may modify the permit to adjust the quantity of the water a permittee may appropriate or use or add a condition to the permit for resource management purposes, including avoidance or mitigation of unreasonable adverse impacts on public health or the environment.
(3)
Except as otherwise provided in COMAR 26.17.07, a permit may contain a condition requiring the permittee to stop or reduce water use when directed to do so by the Department during a drought period or emergency.
(4)
Except for subdivisions served by individual domestic wells, a permit issued for an average of 10,000 or more gallons a day shall contain a condition requiring the permittee to report semiannually to the Department the quantity of water appropriated under the permit for each of the preceding 6 months. The Department may require a permittee to report daily use and may require the permittee to install flow-measuring devices.
(5)
A ground water appropriation or use permit for an appropriation from a well 4 inches in diameter or larger shall contain a condition requiring that the pumping equipment be installed so that water levels can be measured during pumping and nonpumping periods without dismantling any equipment. Any opening for tape measurements of water levels shall have a minimum inside diameter of 0.5 inch and be sealed by a removable cap or plug. The permittee shall provide a tap for taking raw water samples before water enters a treatment facility, pressure tank, or storage tank.
C.
Agricultural Water Appropriation or Use Permits.
(1)
The Department shall review an active permit at least once every 3 years, or more frequently at the discretion of the Department. During a permit review, the Department may modify the permit or add a condition to the permit for resource management purposes, including avoidance or mitigation of unreasonable adverse impacts on public health or the environment.
(2)
Public notice and opportunity for hearing requirements of Environment Article, §5-506, Annotated Code of Maryland, do not apply to the renewal of a water appropriation or use permit for agricultural purposes if no change is intended in the use, quantity, source, and place of use.
(3)
Water Use Reporting.
(a)
A water appropriation or use permit for agricultural purposes may contain a condition requiring the permittee to report an estimate of total water use for each month of the preceding calendar year to the Department.
(b)
The Department shall provide the necessary water use report form to the permittee each year.
(c)
The permittee may measure water use by any method the permittee considers appropriate under the circumstances to reasonably reflect actual water use. Methods of measurement may include in-line water meters, sonic/vibration meters, induction meters, pump operation time meters, or acreage irrigated.

Regulation .08 Temporary Permit for Emergency Appropriation.Copy Citation

A.
The Department may issue a temporary permit for emergency appropriation or use of water, if the time required to obtain a permit would constitute a danger to the health of people or animals, or would subject products requiring processing to spoilage.
B.
A temporary permit is effective when issued for a period of not more than 3 months.
C.
If the emergency condition is anticipated to last more than 3 months, immediately after receiving a temporary permit for emergency appropriation, the temporary permittee shall apply for a permit.

Regulation .09 Hearings.Copy Citation

A.
If a public informational hearing is conducted, the Department shall, in accordance with COMAR 26.01.07.08:
(1)
Render a decision to issue, modify, or deny the permit; and
(2)
Notify the applicant and persons on the interested persons list of the decision.
B.
If a public informational hearing is not conducted, the Department shall, in accordance with COMAR 26.01.07.08:
(1)
Render a decision to issue, modify, or deny the permit within 60 days of the Department's determination that the application is complete, unless extenuating circumstances justify an extension of time; and
(2)
Notify the applicant and persons on the interested persons list of the decision.
C.
An aggrieved person may request a contested case hearing in accordance with COMAR 26.01.07.09.

Chapter 07. Consumptive Use of Surface Water in the Potomac River Basin

Regulation .01 Definitions.Copy Citation

A.
In this chapter, the following terms have the meanings indicated.
B.
Terms Defined.
(1)
“Consumptive water use” means that portion of a water withdrawal which, as a result of evaporation, interbasin diversions, or other means, is not returned to the source to be available for subsequent use.
(2)
“Department” means the Department of the Environment.
(3)
“Low flow augmentation” means the provision of water, through development of new water storage facilities or the purchase of storage space in existing water storage facilities or both, equal to the amount of consumptive use.

Regulation .02 Scope of Application.Copy Citation

A.
Permits issued or amended by the Department for nonresidential surface water appropriation in the Potomac River Basin upstream from Little Falls after January 1, 1985, shall condition the withdrawal of water on the provision, by the permittee, of low flow augmentation for consumptive water use, if the maximum consumptive water use can exceed 1 million gallons per day (mgd) at any time. Low flow augmentation shall be required whether the 1 mgd level is obtained under one permit or reached incrementally under successive new or amended permits for the same project.
B.
As an alternative to the provision of low flow augmentation, permittees may cease consumptive water use during certain periods specified by the Department or may reduce consumptive water use to levels of 1 mgd or less.
C.
Consumptive uses associated with all water appropriation permits for nonresidential water use before January 1, 1985 are exempt from the required low flow augmentation as to the level of consumptive water use before January 1, 1985.
D.
Permittees operating under existing water appropriation or use permits that increase consumptive use beyond 1 mgd without increasing withdrawal shall obtain a new water appropriation permit and shall also be subject to the provisions of this regulation for that amount consumptively used which is in excess of 1 mgd and which was not previously exempt from this regulation as a result of having occurred before January 1, 1985.
E.
If the Department determines that the combined effects of upstream permittees consumptively using less than 1 mgd may significantly increase the risk of imposing water use restrictions under the Potomac River Low Flow Allocation Agreement, the Department may require low flow augmentation of the permittees in a manner appropriate to their operations.
F.
Surface water appropriation and use permits issued or amended for municipal residential water uses upstream from the Washington metropolitan area shall contain a condition that requires the permittees to reduce withdrawals from the Potomac River or tributaries of the Potomac River when the restriction stage is declared in the Washington metropolitan area under the provisions of the Potomac River Low Flow Allocation Agreement.

Regulation .03 Conditions and Procedures.Copy Citation

A.
Subject to the Department's approval, provision of low flow augmentation by the permittee may occur at any location within the Potomac River Basin above Great Falls regardless of the location of the consumptive use. The Department may require the permittee situated on a tributary of the Potomac River to locate the low flow augmentation facility upstream from the point of withdrawal if deemed necessary for the environmental protection of instream values.
B.
The amount of required low flow augmentation shall be calculated for the location at which the withdrawal occurs or, if the consumptive use occurs on a tributary and augmentation is provided on the Potomac River, at the confluence of the tributary and the Potomac River.
C.
The total amount of low flow augmentation storage, in billions of gallons, required of a permittee by the Department shall be interpolated from the following table:
D.
The Department shall direct the permittee as to when and for what duration consumptive water use must cease or a release from a water storage facility must be made for low flow augmentation for consumptive water use.
E.
Total nonexempt consumptive use on a daily basis by a permittee may not exceed the value used in calculating water augmentation requirements during low flow restriction periods.
F.
If the permittee elects to construct the low flow augmentation storage facility in Virginia, West Virginia or Pennsylvania, the permittee shall secure the necessary agreements with the appropriate jurisdiction to enable the permittee to operate the augmentation facility in compliance with this regulation.
G.
Municipal residential water use permittees, upstream from the Washington metropolitan area, when notified by the Department that the water use restriction stage had been declared in the Washington metropolitan area, shall reduce all withdrawals from the Potomac River Basin or its tributaries to a level corresponding to the average daily withdrawal by the permittee during the previous January, February, and March.

Regulation .04 Transferability.Copy Citation

A.
Permittees no longer consumptively using water may transfer their investment in low flow augmentation facilities to other existing or new consumptive users.
B.
The Department shall be notified by the transferor at least 10 days before any transfer of their investment in low flow augmentation facilities.