<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".09" citation="COMAR 26.20.03.09" title_num="26" subtitle_num="20" chapter_num="03" heading="Schedules.">
  <text>A timely application pursuant to Regulation .08F of this chapter shall consist of filing of an application in accordance with the following schedules:</text>
  <paragraph num="A.">
    <text>Within 2 months of the effective date of this regulation the following shall be submitted to the Bureau:</text>
    <paragraph num="(1)">
      <text>Module I and Module II of the application for mining operations.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>A map at a scale of 500 feet to the inch, or larger. The map shall identify:</text>
      <paragraph num="(a)">
        <text>The boundaries of surface properties within the permit area and within 1,000 feet of the permit area, and the names of the owners of the surface properties within the permit area and within 1,000 feet of the permit area;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The boundaries of the proposed permit area upon which the applicant has the legal right to enter and conduct surface mining operations, and the boundaries of all existing contiguous permits;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The location of all buildings on and within 1,000 feet of the proposed permit area, with identification of the current use of the buildings;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>The location of surface and subsurface man-made features within, passing through, or passing over the proposed permit area, including but not limited to major electric transmission lines, pipelines, and agricultural drainage tile fields;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Each public road located on or within 1,000 feet of the proposed permit area;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Each public or private cemetery or Indian burial ground located on or within 100 feet of the proposed permit area;</text>
      </paragraph>
      <paragraph num="(g)">
        <text>The location of surface water bodies such as streams, creeks, lakes, ponds, springs, constructed or natural drains, and irrigation ditches within the proposed permit and adjacent areas;</text>
      </paragraph>
      <paragraph num="(h)">
        <text>The boundaries of any public park, forest or wildlife management area, the locations of any cultural or historic resources listed in the National Register of Historic Places, and the locations of any known archaeological sites within the permit area or adjacent areas;</text>
      </paragraph>
      <paragraph num="(i)">
        <text>The distance from the permit area to the nearest structure and to any structure, dwelling, or physical feature, or all of these, where mining is prohibited, unless a waiver or exemption is obtained;</text>
      </paragraph>
      <paragraph num="(j)">
        <text>The location of monitoring stations used to gather water quality and quantity data in preparation of the application.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Within 4 months of the effective date of this regulation, the following shall be submitted to the Bureau:</text>
    <paragraph num="(1)">
      <text>Module III and Module IV of the application for mining operations;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>A mining plan map; and</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Other information required to complete an application under the Regulatory Program.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>The application shall be submitted in accordance with COMAR 26.20.04.</text>
  </paragraph>
</regulation>