<?xml version='1.0' encoding='utf-8'?>
<chapter num="17" heading="Existing Structures" title_num="26" subtitle_num="20">
  <regulation prefix="Regulation" num=".01" heading="Description.">
    <paragraph num="A.">
      <text>The permit application shall contain a description of each existing structure proposed to be used in connection with an operation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The description shall include:</text>
      <paragraph num="(1)">
        <text>Location;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Plans of the structure which describe its current condition;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Approximate dates on which construction of the existing structure was begun and completed; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>A showing, including relevant monitoring data or other evidence, that the structure meets either the performance standards of the Regulatory Program, or those performance standards of the Interim Regulatory Program which are at least as stringent as the performance standards of the Regulatory Program.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Compliance with Performance Standards.">
    <paragraph num="A.">
      <text>Each structure shall comply with the performance standards and the design requirements of the Regulatory Program, except that an existing structure may be exempted from the design requirements if it meets:</text>
      <paragraph num="(1)">
        <text>The performance standards of the Regulatory Program; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Those performance standards of the Interim Regulatory Program which are at least as stringent as the comparable performance standards of the Regulatory Program.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>The Bureau may grant exemptions, only as part of the permit application process, if it finds that no significant harm to the environment or public health or safety will result from use of the structure.</text>
    </paragraph>
    <paragraph num="C.">
      <text>An existing structure which does not meet a performance standard of the Regulatory Program, or a performance standard of the Interim Regulatory Program which is at least as stringent as the comparable performance standard of the Regulatory Program, shall be modified or reconstructed to meet the design standard of the Regulatory Program pursuant to a compliance plan, submitted by the applicant and approved by the Bureau, that includes:</text>
      <paragraph num="(1)">
        <text>Design specifications for the modification or reconstruction of the structure to meet the design and performance standards of the Regulatory Program;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A construction schedule which shows dates for beginning and completing interim steps and final reconstruction;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Provisions for monitoring the structure during and after modification or reconstruction to ensure that the performance standards of the Regulatory Program are met; and</text>
      </paragraph>
      <paragraph num="(4)">
        <text>A showing that the risk of harm to the environment or to public health or safety is not significant during the period of modification or reconstruction.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Before issuance of the permit, the Bureau must find that:</text>
      <paragraph num="(1)">
        <text>The compliance plan under §C of this regulation will bring the existing structure into compliance not later than 6 months after issuance of the permit;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The risk of harm to the environment or to public health or safety is not significant during the period of modification or reconstruction; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The applicant will monitor the structure to determine compliance with the performance standards of the Regulatory Program.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Existing Structure.">
    <paragraph num="A.">
      <text>If the Bureau finds that the existing structure cannot be reconstructed without causing significant harm to the environment or public health or safety, the applicant will be required to abandon and reclaim the existing structure.</text>
    </paragraph>
    <paragraph num="B.">
      <text>The structure may not be used for or to facilitate surface coal mining operations after the effective date of issuance of the Regulatory Program permit.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Abandonment of the structure shall proceed on a schedule approved by the Bureau.</text>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Environment Article, §15-503, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date:</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01, .02, and .03 were previously codified as COMAR 08.13.09.20A, B—E, and F, respectively. Recodification occurred in April, 1993. For a history of these regulations before April, 1993, see "Administrative History of COMAR 08.13.09 before April, 1993" which follows COMAR 26.20.01.</annotation>
    <annotation type="History" subtype="Administrative History">Chapter recodified from COMAR 08.20.17 to COMAR 26.20.17, June 1996</annotation>
  </annotations>
</chapter>