<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".05" citation="COMAR 26.20.21.05" title_num="26" subtitle_num="20" chapter_num="21" heading="Sediment Control Measures.">
  <paragraph num="A.">
    <text>Appropriate sediment control measures shall be designed, constructed, and maintained using the best technology currently available to:</text>
    <paragraph num="(1)">
      <text>Prevent, to the extent possible, additional contributions of sediment to streamflow or to runoff outside the permit area;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Meet the more stringent of applicable State or federal effluent limitations; and</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Minimize erosion to the extent possible.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Sediment control measures include practices carried out within and adjacent to the disturbed area. Sediment control methods include but are not limited to:</text>
    <paragraph num="(1)">
      <text>Disturbing the smallest practicable area at any one time during the mining operation through progressive backfilling, grading, and prompt revegetation;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Diverting runoff away from disturbed areas;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Diverting runoff using protected channels or pipes through disturbed areas so as not to cause additional erosion;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Using straw dikes, riprap, check dams, mulches, vegetative sediment filters, and other measures that reduce overland flow velocity, reduce runoff volume, or trap sediment;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Treating with chemicals.</text>
    </paragraph>
  </paragraph>
</regulation>