<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".01" citation="COMAR 26.21.01.01" title_num="26" subtitle_num="21" chapter_num="01" heading="Definitions.">
  <paragraph num="A.">
    <text>In this chapter, the following terms have the meanings indicated.</text>
  </paragraph>
  <paragraph num="B.">
    <text>Terms Defined.</text>
    <paragraph num="(1)">
      <text>“Act” means Environment Article, §§15-801—15-834, Annotated Code of Maryland.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>“Angle of repose” means the maximum angle of slope (measured from a horizontal plane) at which loose cohesionless material will come to rest on a pile of similar material.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>“Applicant” means that person making application to the Department under the Act for a license or a permit and who is responsible for fulfilling the requirements of the Act, all license and permit conditions, and regulations adopted under the Act.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>“Backfill” means earth overburden, mine waste, or imported material used to replace material removed during mining.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>“Bench” means a flat surface from which a pit or quarry is worked.</text>
    </paragraph>
    <paragraph num="(6)">
      <text>“Critical gradient” means the maximum stable inclination of an unsupported slope.</text>
    </paragraph>
    <paragraph num="(7)">
      <text>“Cut slope or face” means a bank or slope that is created by removing material below the existing ground surface.</text>
    </paragraph>
    <paragraph num="(8)">
      <text>“Department” means the Department of the Environment.</text>
    </paragraph>
    <paragraph num="(9)">
      <text>“Diversion” means a channel, embankment, or other man-made structure constructed for the purpose of redirecting water from one area to another, including interceptor swales, perimeter dikes, and earth dikes.</text>
    </paragraph>
    <paragraph num="(10)">
      <text>“Erosion” means the process by which the land surface is worn away by the action of water, wind, ice, or gravity.</text>
    </paragraph>
    <paragraph num="(11)">
      <text>“Excavation” means the extraction or removal of minerals so as to make them suitable for sale, exchange, commercial, or industrial use.</text>
    </paragraph>
    <paragraph num="(12)">
      <text>“Fill slope” means a bank or slope that has been created by the placing of material on top of the existing ground surface.</text>
    </paragraph>
    <paragraph num="(13)">
      <text>“Final grade” means the finished elevation of any excavated surface disturbance before replacement of topsoil.</text>
    </paragraph>
    <paragraph num="(14)">
      <text>“Grading” means to bring an existing surface to a designed form by cutting, filling, or smoothing operations.</text>
    </paragraph>
    <paragraph num="(15)">
      <text>“Ground water” means subsurface water that fills available openings in rock or soil material such that they may be considered water saturated.</text>
    </paragraph>
    <paragraph num="(16)">
      <text>Haul Road.</text>
      <paragraph num="(a)">
        <text>“Haul road” means a road that is constructed or used in surface mining and reclamation operations, including one used by vehicles leading to transfer, processing, or storage areas.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>“Haul road” does not mean a road maintained with public funds.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(17)">
      <text>“Highwall” means a site of a pit or quarry adjacent to unmined land.</text>
    </paragraph>
    <paragraph num="(18)">
      <text>“Impoundment” means a closed basin naturally formed or man-made for the retention of water, sediment, or waste.</text>
    </paragraph>
    <paragraph num="(19)">
      <text>“License” means the annual written certification from the Department that the licensee is authorized to conduct surface mining activities in the State.</text>
    </paragraph>
    <paragraph num="(20)">
      <text>“Mined lands” means the surface or subsurface of an area in which surface mining operations will be, are being, or have been conducted. Mined lands include:</text>
      <paragraph num="(a)">
        <text>Private ways and roads used for mining appurtenant to any surface mining area;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Land excavations;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Workings; and</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Overburden.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(21)">
      <text>“Mine waste” means the residual soil, rock, mineral, liquid, vegetation, equipment, machines, tools, or other materials or property directly resulting from, used in, or displaced by, surface mining operations.</text>
    </paragraph>
    <paragraph num="(22)">
      <text>“Peak particle velocity” means the maximum velocity of a particle (rate of movement of the ground) in inches per second as measured by the three mutually perpendicular components of motion in the ground immediately adjacent to a structure of concern.</text>
    </paragraph>
    <paragraph num="(23)">
      <text>“Permit” means the written authorization to mine a particular site, including all conditions, maps, plans, and other supporting documents made a part of the permit that the Department issues to a permittee under the Act.</text>
    </paragraph>
    <paragraph num="(24)">
      <text>“Processing plant” means any equipment, buildings, structures, or appurtenances used to process non-coal minerals, including crushers, shakers, screens, washers, conveyor belts, settling ponds, and stockpiles of processed materials, and the land upon which these are located.</text>
    </paragraph>
    <paragraph num="(25)">
      <text>“Sediment” means soils or other surficial materials transported or deposited by the action of wind, water, ice, or gravity as a product of erosion, or by artificial means.</text>
    </paragraph>
    <paragraph num="(26)">
      <text>“Sediment pond” means any natural or artificial structure or depression used to remove sediment from water and store sediment, including, for example, sediment basins and traps.</text>
    </paragraph>
    <paragraph num="(27)">
      <text>“Setback” means the distance from a property line, road, or other limiting feature, to an excavation or to the toe of a fill which serves to protect property, a road, or other features.</text>
    </paragraph>
    <paragraph num="(28)">
      <text>“Stabilization” means methods used to control movement of soil, spoil piles, or areas of disturbed earth and includes any combination of the following:</text>
      <paragraph num="(a)">
        <text>Increasing bearing capacity;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Draining;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Revegetating;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Mulching;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Liming; and</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Fertilizing.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(29)">
      <text>“Subsoil” means the part of the soil profile below the topsoil and is sometimes called overburden.</text>
    </paragraph>
    <paragraph num="(30)">
      <text>“Surface water” means water either flowing or standing on the surface of the earth.</text>
    </paragraph>
    <paragraph num="(31)">
      <text>“Topsoil” means the upper part of the soil profile that is rich in humus, also known as the A horizon.</text>
    </paragraph>
  </paragraph>
</regulation>