<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".10" citation="COMAR 26.21.01.10" title_num="26" subtitle_num="21" chapter_num="01" heading="Grading and Sediment Control.">
  <paragraph num="A.">
    <text>The permittee shall minimize the removal of vegetation, topsoil, and overburden before surface mining.</text>
  </paragraph>
  <paragraph num="B.">
    <text>The permittee shall construct and maintain erosion and sediment control devices in accordance with the grading and sediment control plan approved by the local soil conservation district.</text>
  </paragraph>
  <paragraph num="C.">
    <text>The permittee shall confine mining activity to the maximum area of disturbance at any one time as described in the permit.</text>
  </paragraph>
  <paragraph num="D.">
    <text>The permittee shall maintain a valid sediment and erosion control approval, including the necessary renewal by the approving authority, for the life of the permit.</text>
  </paragraph>
</regulation>