  <paragraph num="A.">
    <text>Except for regulated activities proposed within the Critical Area, an activity that qualifies for a letter of authorization is exempt from the permit and mitigation requirements of this subtitle. Activities proposed in the Critical Area are not exempt from the mitigation requirements of COMAR 26.23.04.02—.07.</text>
  </paragraph>
  <paragraph num="B.">
    <text>Upon application, the activities listed below may qualify for a letter of authorization provided that the conditions in Regulation .02B of this chapter are satisfied and best management practices, which may be required by the Department, are all met:</text>
    <paragraph num="(1)">
      <text>Activities in isolated nontidal wetlands of less than 1 acre and having no significant plant or wildlife value. An applicant's determination of whether an area is an isolated nontidal wetland shall be based on published hydrologic and hydraulic data or data obtained in the field which shows whether the nontidal wetland is hydrologically connected.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Activities whose cumulative loss of nontidal wetlands and buffer, which contains no significant plant or wildlife value, is:</text>
      <paragraph num="(a)">
        <text>Less than 5,000 square feet; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Greater than 5,000 square feet, provided that:</text>
        <paragraph num="(i)">
          <text>The actual loss of nontidal wetlands is less than 5,000 square feet, and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Activities in the buffer result in minimal additional adverse impacts to nontidal wetlands, as determined by the Department.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>Installation of Utility Lines.</text>
      <paragraph num="(a)">
        <text>The installation of utility lines includes the following activities:</text>
        <paragraph num="(i)">
          <text>Trenching, jetting, jackhammering, or plowing of nontidal wetlands;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Laying of pipe, cable, or wire;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Backfilling of the excavated trench containing the pipe, cable, or wire;</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>Placement of riprap; and</text>
        </paragraph>
        <paragraph num="(v)">
          <text>Rectification of nontidal wetland areas which have been disturbed.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(b)">
        <text>Utility lines do not include:</text>
        <paragraph num="(i)">
          <text>Intake and outfall structures;</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Pipe or pipeline used to transport any liquid or slurry substance except as associated with water and sewage lines;</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Natural gas lines greater than 12 inches in diameter; or</text>
        </paragraph>
        <paragraph num="(iv)">
          <text>Storm water conveyance systems.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="(4)">
      <text>Construction of overhead power transmission lines.</text>
    </paragraph>
    <paragraph num="(5)">
      <text>Mitigation projects not required under this subtitle.</text>
    </paragraph>
    <paragraph num="(6)">
      <text>Regulated activities which impact the buffer, and less than 2 acres of farmed nontidal wetlands with 15 or more consecutive days of inundation during the growing season, except in nontidal wetlands of special State concern or their expanded buffer.</text>
    </paragraph>
    <paragraph num="(7)">
      <text>The repair of the following serviceable structures or fills:</text>
      <paragraph num="(a)">
        <text>Aboveground and underground utilities;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Structures in rights-of-way;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Railroad beds;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Road beds, roadside ditches, culverts, and outlet ditches;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Bridges;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Dams;</text>
      </paragraph>
      <paragraph num="(g)">
        <text>Dikes;</text>
      </paragraph>
      <paragraph num="(h)">
        <text>Levees;</text>
      </paragraph>
      <paragraph num="(i)">
        <text>Water and wastewater control structures; and</text>
      </paragraph>
      <paragraph num="(j)">
        <text>Facilities designed for storm water management.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(8)">
      <text>Activities which will result in the loss of nontidal wetlands that have been temporarily created by a permitted or authorized construction activity or as a result of a permitted mining activity, including wetlands created:</text>
      <paragraph num="(a)">
        <text>Incidental to mining activities that were conducted under an approved mining plan or permit, or wetlands that have been created incidental to a mining activity, and that will be impacted during implementation of an approved reclamation plan;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>As a result of the construction of an approved sediment control structure; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>For a specific purpose that will remain for a specified period of time, including wash ponds and grassed waterways.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>The following conditions apply to the activities listed in §B(7) of this regulation:</text>
    <paragraph num="(1)">
      <text>If the structure or fill has been put to uses other than the use originally intended or authorized for the original construction, and the repair activity will alter or impair any additional nontidal wetland area, the repair of the structure may not be exempted.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Repair to be made more than 3 years after damage occurs or is first identified does not qualify for an exemption.</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>An applicant seeking a letter of authorization under §B(8) of this regulation shall submit the following:</text>
    <paragraph num="(1)">
      <text>Information regarding the creation of the wetlands;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The purpose of the wetland creation, if applicable;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>The length of time the wetland will exist;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>A copy of the approved site plan, erosion and sediment control plan, mining plan, or reclamation plan;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>A description of the function the created wetland will serve;</text>
    </paragraph>
    <paragraph num="(6)">
      <text>A request for the length of time the letter of authorization is to be valid; and</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Justification for conducting the regulated activity in the nontidal wetland.</text>
    </paragraph>
  </paragraph>
  <paragraph num="E.">
    <text>Structures that have been placed in nontidal wetlands (for example, sediment traps), or that have impacted nontidal wetlands through their construction or operation do not qualify for a letter of authorization under §B(8) of this regulation.</text>
  </paragraph>
  <paragraph num="F.">
    <text>A letter of authorization issued under §B(8) of this regulation is in effect for a period of up to 5 years and may be extended for one additional 5-year period. A letter of authorization granted under §B(8) may not be extended for more than one 5-year period, for a total of 10 years, unless the regulated activity is part of a permitted mining activity or involves implementation of a mining reclamation plan.</text>
  </paragraph>