<chapter num="04" heading="Mitigation" title_num="26" subtitle_num="23">
  <regulation prefix="Regulation" num=".01" heading="Mitigation for Agricultural Activities.">
    <paragraph num="A.">
      <text>Exemptions. Mitigation or monetary compensation for nontidal wetland losses are not required for agricultural activities which are exempted under COMAR 26.23.05.01B.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Requirements.</text>
      <paragraph num="(1)">
        <text>The Department shall require that a person conducting an agricultural activity in nontidal wetlands after December 31, 1990, mitigate for the loss of nontidal wetlands within 3 years of the loss, if the agricultural activity is not exempted under COMAR 26.23.05.01B.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A person conducting an agricultural activity which causes the loss of nontidal wetlands shall, in consultation with a soil conservation district, develop a mitigation component of the soil conservation and water quality plan.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A person conducting an agricultural activity shall submit the mitigation component of a soil conservation and water quality plan to the Department for review before final approval by a soil conservation district.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department shall review the mitigation component of the soil conservation and water quality plan for consistency with Regulations .03—.07 of this chapter. The Department shall notify the landowner and the soil conservation district if the mitigation component is consistent within 60 days of receipt of a mitigation component.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>If the Department fails to notify the landowner and the soil conservation district within 60 days of receipt of a mitigation component, then the mitigation component shall be deemed to be consistent with Regulations .03—.07 of this chapter.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>A soil conservation district may not approve the components of a soil conservation and water quality plan pertaining to nontidal wetland impacts if the Department has determined that the mitigation component is inconsistent with Regulations .03—.07 of this chapter.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>The Department, in determining the extent of mitigation, shall consider the benefit provided by best management practices in replacing lost nontidal wetland acreage and functions.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>The Department may accept monetary compensation only if it is determined that creation, restoration, or enhancement of nontidal wetlands are not feasible alternatives. Monetary compensation shall be accepted only under the conditions, and based on the fee structure guidelines, in Regulation .07 of this chapter.</text>
      </paragraph>
      <paragraph num="(9)">
        <text>If the Department of Agriculture determines in writing that mitigation will create an economic hardship that would jeopardize the continued operation of a farm, mitigation may be deferred until one or more of the following occur:</text>
        <paragraph num="(a)">
          <text>The economic hardship no longer exists.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The current owner or operator transfers the farm to a new owner or operator. In this case, the current owner or operator shall remain responsible for mitigation.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Agricultural activities no longer take place on the nontidal wetland.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(10)">
        <text>When an economic hardship, as determined by the Department of Agriculture, ends due to conditions described in §B(9) of this regulation:</text>
        <paragraph num="(a)">
          <text>A person conducting an agricultural activity shall implement the mitigation component of an approved soil conservation and water quality plan within 3 years of the loss of the nontidal wetland, or within 1 year of the end of the economic hardship, whichever is greater; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The Department of Agriculture shall notify the Department in writing within 30 days of the end of the economic hardship.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(11)">
        <text>The Department shall require that a person conducting an agricultural activity in a nontidal wetland, which requires mitigation, to file a surety bond with the Department consistent with Regulation .04B of this chapter, within:</text>
        <paragraph num="(a)">
          <text>60 days of approval of the soil conservation and water quality plan which includes the mitigation component, provided that an economic hardship determination has not been granted; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>90 days of the expiration of an economic hardship determination.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(12)">
        <text>The Department of Agriculture shall submit a mitigation report to the Department at the end of each fiscal year. This report shall provide the following information on the status of the Department of Agriculture's economic hardship determinations for each farm:</text>
        <paragraph num="(a)">
          <text>Whether the economic hardship still exists;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Whether the owner or operator granted the deferral is the current owner or operator; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The acreage of nontidal wetland losses for which mitigation has been deferred by the economic hardship.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".02" heading="Mitigation for Regulated Activities.">
    <paragraph num="A.">
      <text>Exemptions. Mitigation or monetary compensation for nontidal wetland losses is not required for regulated activities:</text>
      <paragraph num="(1)">
        <text>Exempted in COMAR 26.23.01.02 and 26.23.03.01, except when specified;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Which do not result in a loss of nontidal wetlands;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Occurring only in the buffer or expanded buffer.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Requirements.</text>
      <paragraph num="(1)">
        <text>A permittee shall take all necessary steps to first avoid adverse impacts and then minimize losses of nontidal wetlands. If the permittee demonstrates to the Department's satisfaction that losses of nontidal wetlands are unavoidable and necessary, the Department shall require the permittee to develop and implement mitigation practices.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The Department shall require a permittee, as a condition of a permit, to mitigate or monetarily compensate for nontidal wetland losses caused by regulated activities not listed as exemptions in §A of this regulation.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Department may waive some or all of the off-site mitigation requirements for up to 1 acre of nontidal wetland loss for construction of special wastewater disposal facilities in a nontidal wetland on residential property. The waiver is conditioned upon the applicant siting the special wastewater disposal facility so as to avoid and minimize impacts to nontidal wetlands, and upon performance of on-site mitigation to the maximum extent practicable.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department may reduce mitigation requirements if the regulated activity provides a significant environmental benefit or if the proposed mitigation project has a high likelihood of success, as determined by the Department.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The Department shall require a permittee to develop and submit for Department review and approval mitigation plans consistent with the mitigation:</text>
        <paragraph num="(a)">
          <text>Standards of Regulation .03 of this chapter;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Plan requirements in Regulation .05 of this chapter; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Monitoring and bond requirements in Regulation .04 of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>The Department may accept monetary compensation only if it is determined that creation, restoration, or enhancement of nontidal wetlands are not feasible alternatives. Monetary compensation shall only be accepted under conditions and based on the fee structure guidelines described in Regulation .07 of this chapter.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>The Department may not base a final nontidal wetland permit determination solely on the environmental benefits of a mitigation proposal or the financial benefits of monetary compensation proposals.</text>
      </paragraph>
      <paragraph num="(8)">
        <text>If the Department denies approval of a mitigation plan and the permittee is aggrieved by the decision, the permittee may appeal the denial under the procedures in COMAR 26.23.02.03B. The Department may order a cessation of the permitted activity or interim stabilization measures pending resolution of the contested case over denial of a mitigation plan.</text>
      </paragraph>
      <paragraph num="(9)">
        <text>The Department may approve of mitigation bank sites in consultation with the appropriate local, State, and federal agencies for the purpose of providing mitigation for identified projects. Mitigation bank sites for identified projects are required to meet the standards of Regulation .03H, I, and J and the monitoring requirements of Regulation .04A of this chapter.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".03" heading="Mitigation Standards.">
    <paragraph num="A.">
      <text>Goal. It is the goal of the Act to attain no net overall loss in nontidal wetland acreage and function, and to strive for a net resource gain in nontidal wetlands. However, it may not be possible for the goal of no net loss to be achieved in each permit action. Achievement of this goal will occur through the regulatory components of this subtitle and other Statewide initiatives which incorporate nontidal wetlands creation, restoration, and enhancement projects outside of the regulatory framework.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Mitigation standards shall be determined in part through the use of acreage replacement ratios. Acreage replacement ratios are expressed as a relationship between two numbers. The first number shall specify the acreage of nontidal wetlands to be mitigated and the second shall specify the acreage of nontidal wetlands lost.</text>
    </paragraph>
    <paragraph num="C.">
      <text>The Department shall consider the mitigation requirement for replacing a loss of nontidal wetlands to be fulfilled when:</text>
      <paragraph num="(1)">
        <text>The following acreage replacement ratios have been met through in-kind creation or restoration for:</text>
        <paragraph num="(a)">
          <text>Emergent nontidal wetlands—1:1 or 1.5:1 when using credit from an approved mitigation bank,</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Scrub-shrub nontidal wetlands—2:1 or 3:1 when using credit from an approved mitigation bank,</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Forested nontidal wetlands—2:1 or 3:1 when using credit from an approved mitigation bank,</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Emergent nontidal wetlands designated as nontidal wetlands of special State concern—2:1 or 3:1 when using credit from an approved mitigation bank,</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Scrub-shrub nontidal wetlands designated as nontidal wetlands of special State concern—3:1 or 4.5:1 when using credit from an approved mitigation bank, and</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Forested nontidal wetlands designated as nontidal wetlands of special State concern—3:1 or 4.5:1 when using credit from an approved mitigation bank;</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A minimum in-kind acreage replacement ratio of 1:1 has been met, and lost nontidal wetland functions have been replaced by additional creation, restoration, or enhancement activities including best management practices for agricultural activities;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Department has determined on a case-by-case basis that enhancement is the only mitigation option, and has specified requirements which have been met by the permittee or person conducting an agricultural activity; or</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department has specified mitigation requirements which have been agreed to and implemented by the permittee or a person conducting an agricultural activity.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>The Department shall consider the mitigation requirement for replacing a loss of farmed nontidal wetlands to be fulfilled when the following replacement ratios have been met through:</text>
      <paragraph num="(1)">
        <text>Enhancement of farmed nontidal wetlands—1:1 or 1.5:1 when using credit from an approved mitigation bank; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Creation or restoration of emergent, scrub-shrub, or forested nontidal wetlands—1:1 or 1.5:1 when using credit from an approved mitigation bank.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>In order for enhancement activities to be accepted towards replacement of lost nontidal wetlands functions, the permittee or person conducting an agricultural activity may be required to:</text>
      <paragraph num="(1)">
        <text>Perform a functional assessment on the wetland proposed to be impacted before the loss of any nontidal wetlands occurs based on-site assessment techniques acceptable to the Department; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Identify how enhancement activities are to replace specified nontidal wetland functions that will be lost.</text>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Enhancement activities may be accepted to replace the loss of nontidal wetland functions when an enhancement activity provides additional protection to, creates, or improves the functions of, nontidal wetlands. Activities may include:</text>
      <paragraph num="(1)">
        <text>Enhancement of farmed wetlands;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Enhancement of degraded nontidal wetlands;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Best management practices for agricultural activities;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Department-approved wildlife ponds;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Purchase or preservation of upland buffers adjacent to existing, created, restored, or enhanced nontidal wetlands;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Purchase or preservation of existing nontidal wetlands; and</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Activities consistent with plans and agreements to create or improve waterfowl habitats in Maryland.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>In determining if enhancement activities will replace nontidal wetland acreage and functional losses, the Department shall consider the following:</text>
      <paragraph num="(1)">
        <text>Degree to which the enhancement activity replaces functions of the lost nontidal wetland;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Benefits of the enhancement activity in rehabilitating or maintaining nontidal wetlands;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Scope and extent of the enhancement activity;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Proximity of the enhancement activity to the nontidal wetland loss;</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Technical merits of the enhancement activity and its likelihood of long-term success;</text>
      </paragraph>
      <paragraph num="(6)">
        <text>Adverse impact of the enhancement activity on natural resources;</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Relationship of the enhancement activity to ongoing natural resource management activities; and</text>
      </paragraph>
      <paragraph num="(8)">
        <text>Compatibility of the enhancement activity with approved comprehensive watershed management plans, if applicable.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>Geographic Location. Mitigation projects preferably shall be connected to existing nontidal wetlands, waterways, or 100-year floodplains. Projects may be located on multiple parcels. Projects shall be located according to the following geographic location in order of preference, unless otherwise determined by the Department:</text>
      <paragraph num="(1)">
        <text>Locations on-site;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Locations off-site, and:</text>
        <paragraph num="(a)">
          <text>Identified in a comprehensive watershed management plan approved by the Department;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Identified in plans and agreements to create or improve waterfowl habitats in Maryland and approved by the Department;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Where the Department has determined, in consultation with other State, local, and federal government agencies, that regional needs for nontidal wetlands functions strongly justify the siting of mitigation projects, and the mitigation project is located:</text>
          <paragraph num="(i)">
            <text>In the watershed where the nontidal wetland loss occurred;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>In the drainage basin where the nontidal wetland loss occurred; or</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>In a county with delegation authority, the preferred location of off-site mitigation projects is within the county.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Siting Within Geographic Locations. In selecting sites within geographic regions for mitigation, a permittee or person conducting an agricultural activity shall pursue mitigation projects on upland sites which have undergone significant human disturbances. A permittee or person conducting an agricultural activity should avoid, whenever possible, siting mitigation projects on:</text>
      <paragraph num="(1)">
        <text>Forested lands;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Lands used for dredged disposal, mine refuse, or other purposes where contaminant problems may exist; or</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Lands which are existing or potential habitat for plant or animal species:</text>
        <paragraph num="(a)">
          <text>Listed as endangered or threatened by the U.S. Fish and Wildlife Service;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Listed as endangered or threatened or species listed as in need of conservation by the Department of Natural Resources; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Considered as a candidate for listing by the U.S. Fish and Wildlife Service, or considered to be locally unusual or rare by the Department of Natural Resources.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="J.">
      <text>Project Standards.</text>
      <paragraph num="(1)">
        <text>The permittee or person conducting an agricultural activity shall successfully implement the approved mitigation plan within the time period required by the Department and specified in the mitigation plan.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Created or restored nontidal wetlands shall meet the following plant survival criteria:</text>
        <paragraph num="(a)">
          <text>After 5 years, greater than 85 percent of the site shall be vegetated by planted species approved by the Department or by a species composition agreed to by the Department;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Allowances shall be made for natural species changes as long as the plant communities are similar to those lost; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>After 5 years, the nontidal wetland shall be dominated by native or adaptive vegetation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>In the case of a permittee or person conducting an agricultural activity, who has proposed the use of natural revegetation as part of the creation, restoration, or enhancement project, after 5 years, greater than 85 percent of the site shall be:</text>
        <paragraph num="(a)">
          <text>Vegetated by species similar to those found in the nontidal wetland lost or by a species composition agreed to by the Department; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Dominated by native or adaptive vegetation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>In the case where the nontidal wetland was dominated by exotic or nuisance plants, the Department shall accept out-of-kind mitigation.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The Department may not approve mitigation plans that include exotic or nuisance plants.</text>
      </paragraph>
    </paragraph>
    <paragraph num="K.">
      <text>Protection Mechanisms.</text>
      <paragraph num="(1)">
        <text>The permittee, bank operator, or person conducting an agricultural activity shall provide mechanisms to assure the protection of the created, restored, or enhanced nontidal wetlands in perpetuity. This may be achieved through any protection mechanism approved by the Department, including:</text>
        <paragraph num="(a)">
          <text>Deed restrictions;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Conservation easements;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Deeding the created, restored, or enhanced nontidal wetland to an organization or public agency capable of protecting the area in perpetuity; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Restrictive covenants.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>Any protection mechanism under §K(1) of this regulation shall include provisions on the following:</text>
        <paragraph num="(a)">
          <text>Language granting the Department, or any successor agency, access to the mitigation site for inspections during the monitoring period and for construction of the mitigation project, if the permittee or person conducting an agricultural activity forfeits a bond and the Department decides to complete construction of the mitigation project;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>In the case of an easement agreement, language allowing assignment of a permittee's, or person conducting an agricultural activity's, interest under the easement agreement to the Department, if the bond is forfeited and the Department decides to complete construction of the mitigation project;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>An absolute prohibition on the draining, dredging, removal, or filling of the created nontidal wetland site;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Language that the restriction is perpetual, binding on the grantor's personal representatives, heirs, successors, and assigns and runs with the land.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".04" heading="Monitoring and Bonding.">
    <paragraph num="A.">
      <text>Monitoring.</text>
      <paragraph num="(1)">
        <text>The monitoring period begins with the first full growing season following completion of construction. The period of the growing season is specified in the post-construction monitoring plan, Phase II plan, or mitigation banking agreement.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Monitoring reports are submitted by:</text>
        <paragraph num="(a)">
          <text>A permittee or person conducting an agricultural activity for a period of 5 years from the completion of construction of the mitigation project, unless the Department provides written notice that the monitoring requirements have been fulfilled in less than 5 years;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A mitigation bank operator, for a minimum of 5 years after completion of construction of the bank or until the last available credit is withdrawn, whichever is later.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The Department shall require that monitoring reports be submitted:</text>
        <paragraph num="(a)">
          <text>Annually, not later than December 31; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>In an acceptable form.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The permittee, bank operator, or person conducting an agricultural activity shall consider monitoring requirements fulfilled upon receipt of written notice from the Department. If the Department fails to send written notice to the permittee, bank operator, or person conducting an agricultural activity within 60 days after the end of the monitoring period, the monitoring requirement shall be considered fulfilled.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Through written notification to the permittee, bank operator, or person conducting an agricultural activity, the Department may extend the required monitoring period for not more than an additional 3-year period, if the mitigation project fails to comply with Regulation .03J of this chapter.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>The permittee, bank operator, or person conducting an agricultural activity shall provide annual monitoring reports to the Department which include the following information:</text>
        <paragraph num="(a)">
          <text>A description of how the mitigation project meets the mitigation project standards in Regulation .03J of this chapter;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Photographs of the mitigation project;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The commercial source of planting stock whenever planting is required;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A description of any modifications which have been made or need to be made to implement the mitigation plan or component so as to meet the standards of Regulation .03J of this chapter; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>For mitigation banks, monitoring information required in a mitigation banking agreement.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(7)">
        <text>The Department reserves the right to inspect the mitigation project at any time during the construction and required monitoring period, and any time after that to assess the long-term viability of the mitigation site.</text>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Bonding.</text>
      <paragraph num="(1)">
        <text>This section does not apply to agencies of any federal, State, county, or municipal government.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Within 60 days of the Department's approval of Phase II of the mitigation plan, or the mitigation component of a soil conservation and water quality plan, a permittee or person conducting an agricultural activity shall file with the Department a surety bond on a form to be prescribed and furnished by the Department.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The bond shall be payable to the State and conditioned upon the successful completion of construction of the mitigation project according to an approved mitigation plan, as it may be modified under Regulation .05D of this chapter, by a permittee or a person conducting an agricultural activity.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Alternate Forms of Security.</text>
        <paragraph num="(a)">
          <text>Instead of a surety bond, the Department may accept one of the following alternate forms of security:</text>
          <paragraph num="(i)">
            <text>A deposit of cash or negotiable bonds of the U.S. Government having a market value equal to the acceptable bond amount accompanied by a written agreement of the bank to pay the State on demand in the event of forfeiture;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A certificate of deposit equal to the required bond, issued by a bank in the State and accompanied by a written agreement of the bank to pay the State on demand in the event of forfeiture;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>An irrevocable letter of credit that is equivalent to the required bond, issued by a bank or financial institution organized or authorized to do business in the State, that expressly states that the total sum is guaranteed to be available and payable directly to the State on demand in the event of forfeiture;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>The grant to the Department, in trust, of a deed, an easement, or other interest in upland property owned by the permittee or person conducting an agricultural activity that has at least the same monetary value as the selected mitigation site;</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Fulfillment of mitigation requirements before completion of the permitted activity or before the approved agricultural activity results in a loss of nontidal wetlands.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>The permittee or person conducting an agricultural activity shall submit to the Department all alternate forms of security deposited under §B(4)(a)(i)—(iii) of this regulation until authorized for release. All alternate forms of security may not expire until construction of the mitigation project has been successfully completed pursuant to the approved mitigation plan, as may be modified under Regulation .05D of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(5)">
        <text>Amount of Bond.</text>
        <paragraph num="(a)">
          <text>The amount of the bond for a permittee shall be set at $20,000 per acre of nontidal wetland mitigation required under the permit.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>The permittee may request reduction of the bond amount by submitting a written request to the Department with a justification for reducing the bond amount, including estimated or actual costs to complete the mitigation project, and any other relevant information.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The Department shall determine whether a lesser amount is sufficient to cover the cost of mitigation, taking into account the following:</text>
          <paragraph num="(i)">
            <text>Number of acres to be mitigated;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The cost of land in the area of the mitigation site;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>The proposed method of mitigation; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Any other relevant factors, including the likelihood of success of the project.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>Liability under a bond shall continue until the Department receives and approves of an as-built plan for the mitigation project and the surety or financial institution receives written notice from the Department that construction of the mitigation project was successfully completed.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>A surety bond or other alternative form of security may not be cancelled by the surety, bank, or other issuing entity unless both of the following conditions are satisfied:</text>
        <paragraph num="(a)">
          <text>The surety notifies the Department and the permittee or person conducting an agricultural activity of its intent to cancel the bond, in writing, by registered mail, not less than 90 days before cancellation; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>At least 45 days before the cancellation date indicated in the notice, the permittee or person conducting an agricultural activity files a commitment from a surety, bank, or other issuing entity to provide a substitute security which will be effective on the cancellation date indicated in the notice.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(8)">
        <text>Bond Forfeiture.</text>
        <paragraph num="(a)">
          <text>The bond or other instrument securing compliance with the mitigation plan or component may be subject to forfeiture upon:</text>
          <paragraph num="(i)">
            <text>Revocation of a nontidal wetlands permit;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Failure of the permittee to comply with an administrative order; or</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Failure to comply with any element of the approved mitigation plan and any approved modifications; or</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Failure to comply with any element of the approved mitigation component of a soil conservation and water quality plan, and any approved modifications.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>The Department, in writing and by certified mail, shall notify the permittee or a person conducting an agricultural activity, and the surety or other financial institution, of the Department's intention to initiate forfeiture proceedings.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>The permittee or a person conducting an agricultural activity shall have 30 days from receipt of the notice of forfeiture to show cause why the bond or other instrument may not be forfeited.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>On showing cause, the Department shall provide for a reasonable time for the permittee or person conducting an agricultural activity, or surety or other financial institution, to correct the problem.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>If the permittee or person conducting an agricultural activity fails to show cause, the bond or other instrument shall be forfeited nisi and the Department shall notify the permittee, surety or other financial institution, or the person conducting an agricultural activity of the forfeiture. If a showing of an intention to correct the problem in compliance with the mitigation plan is not submitted to the Department within 30 days from forfeiture nisi, the bond or other security shall be forfeited absolute.</text>
        </paragraph>
        <paragraph num="(f)">
          <text>The Department shall use forfeited bonds or alternate forms of security to perform mitigation requirements.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(9)">
        <text>To avoid double bonding, the Department shall work with an applicant required to post bond under Environment Article, §15-823, Annotated Code of Maryland, and other Department programs requiring a bond.</text>
      </paragraph>
      <paragraph num="(10)">
        <text>A permittee or person conducting an agricultural activity may not conduct a regulated or agricultural activity in a nontidal wetland if the permittee or person conducting an agricultural activity previously forfeited any bond or alternate security under this subtitle, unless the permittee or person conducting an agricultural activity repays the Department the cost of completing the mitigation project in excess of the forfeited bond or alternate security, plus interest at the rate set in the Courts and Judicial Proceedings Article, §11-107(a), Annotated Code of Maryland. If the mitigation project is still not completed, the permittee or person conducting an agricultural activity shall complete the mitigation project at its expense according to the approved mitigation plan and any approved modifications.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Bonding for Mitigation Banks.</text>
      <paragraph num="(1)">
        <text>Government agencies operating a mitigation bank are not subject to the provisions of this section.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>As approved by the Department and as provided in §B(4), (5), and (7) of this regulation, a mitigation bank operator shall:</text>
        <paragraph num="(a)">
          <text>Post a performance bond, or alternate form of security, payable to the Department;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Guarantee to pay to the Department, or place in escrow or trust, an amount equal to the amount due under the mitigation fee structure for the county in which the mitigation bank is located or under guidelines in Regulation .07 of this chapter;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Perform the mitigation on another site acceptable to the Department; or</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Provide such other alternate form of security as may be acceptable to the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>Liability under the performance bond or alternate form of security set forth in §B(2)(a) or (4) of this regulation commences at the time the Department approves use of the mitigation bank and continues:</text>
        <paragraph num="(a)">
          <text>Through the end of the monitoring period specified in the mitigation banking agreement or until the last credit is withdrawn, whichever is later; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Until the surety or financial institution receives written notice from the Department that the bond or alternate form of security may be released.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department may partially release the performance bond or alternate form of security during the term of the monitoring period.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The performance bond or alternate form of security is subject to forfeiture upon failure of the bank operator to comply with:</text>
        <paragraph num="(a)">
          <text>The terms of the mitigation banking agreement; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Regulations .03—.07 of this chapter, as applicable.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(6)">
        <text>The bond forfeiture provisions of §B(8)(b)—(e) of this regulation apply to mitigation banks.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".05" heading="Mitigation Plan.">
    <paragraph num="A.">
      <text>A person conducting an agricultural activity in nontidal wetlands shall submit mitigation components of a soil conservation and water quality plan to the Department consistent with the requirements of this regulation.</text>
    </paragraph>
    <paragraph num="B.">
      <text>Phase I.</text>
      <paragraph num="(1)">
        <text>A permittee shall submit Phase I of a mitigation plan as part of the permit application.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Phase I of the mitigation plan shall include all of the following information:</text>
        <paragraph num="(a)">
          <text>Names, addresses, and telephone numbers of the principals associated with project implementation.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A proposal, if applicable, to use monetary compensation consistent with Regulation .04 of this chapter to fulfill mitigation requirements.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A photograph and description of the type and acreage of proposed nontidal wetland losses.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A description of the activity which may cause the loss of nontidal wetlands.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>A description of mitigation projects, including best management practices for agricultural activities, proposed as fulfillment of the required replacement of lost nontidal wetland acreage and functions. The description shall include the proposed source of hydrology and project location maps showing the geographic relationship between the area of potential nontidal wetland losses and the proposed mitigation sites.</text>
        </paragraph>
        <paragraph num="(f)">
          <text>A description of the site selection process and a justification of the selection of the proposed mitigation site based on Regulation .03H and I of this chapter.</text>
        </paragraph>
        <paragraph num="(g)">
          <text>A description of the selected protection mechanisms for each mitigation site as required in Regulation .03K of this chapter.</text>
        </paragraph>
        <paragraph num="(h)">
          <text>A proposal, if applicable, to mitigate through the use of mitigation credits in a mitigation bank, including the:</text>
          <paragraph num="(i)">
            <text>Name of the bank operator and owner,</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Location of the mitigation bank,</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Type and acreage of mitigation credits in the mitigation bank proposed for use.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The Department shall render a decision concerning the acceptability of Phase I of a mitigation plan as part of the final permit decision.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department, in rendering a decision on Phase I of a mitigation plan, shall provide guidance to the applicant on the contents, timing, and necessity of proceeding with Phase II of the mitigation plan.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The Department shall review proposals to use mitigation credit from an approved mitigation bank based on Regulation .03 of this chapter and:</text>
        <paragraph num="(a)">
          <text>Evidence that the applicant has investigated on-site mitigation and that on-site mitigation is infeasible;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Ability of the proposed mitigation bank to replace or enhance the functions of the wetland that are proposed to be lost;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Compliance by the bank operator with the terms of the mitigation banking agreement; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Availability of credits in the mitigation bank.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Phase II.</text>
      <paragraph num="(1)">
        <text>A permittee may submit Phase II of a mitigation plan as part of the permit application.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Unless otherwise determined by the Department, Phase II of the mitigation plan shall be submitted within 3 months of the Department's final permit decision and shall include all of the following information about each mitigation project:</text>
        <paragraph num="(a)">
          <text>Plan view scaled drawings, including:</text>
          <paragraph num="(i)">
            <text>Vicinity map showing the mitigation project location, existing land use, and zoning;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Location, type, and acreage of proposed nontidal wetland mitigation activities;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Proposed location of stockpile areas;</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Location of sediment and erosion control practices;</text>
          </paragraph>
          <paragraph num="(v)">
            <text>Locations of all areas used to store machinery, equipment, or supplies;</text>
          </paragraph>
          <paragraph num="(vi)">
            <text>Proposed source of borrow materials;</text>
          </paragraph>
          <paragraph num="(vii)">
            <text>Proposed location, spacing, and type of propagules for each plant species;</text>
          </paragraph>
          <paragraph num="(viii)">
            <text>Location of best management practices for agricultural activities; and</text>
          </paragraph>
          <paragraph num="(ix)">
            <text>Other information pertinent to Phase II of a mitigation plan as required by the Department.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(b)">
          <text>Cross-section drawing showing existing and proposed final site conditions including grade, elevation, and slope.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Description of how enhancement activities, including best management practices for agricultural activities, will replace lost nontidal wetland acreage and functions.</text>
        </paragraph>
        <paragraph num="(d)">
          <text>If applicable, a description of how the enhancement of farmed nontidal wetlands will replace lost nontidal wetland acreage and functions.</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Construction schedule, which includes estimated start and completion dates.</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Hydrology, which includes:</text>
          <paragraph num="(i)">
            <text>Estimated elevation of surface and ground water as measured from the soil surface bimonthly, March—May, and monthly, June—October;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>The source of the water such as ground water, precipitation, and surface water, over various seasons of the year; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>The reliability of the hydrologic sources throughout the various seasons of the year; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Relevant precipitation data.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(g)">
          <text>Substrate conditions including a description of:</text>
          <paragraph num="(i)">
            <text>Existing soil and substrate conditions; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Soil and substrate amendments needed to meet hydric soil characteristics and maintain the specified plant species.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(h)">
          <text>Vegetation to be planted including all of the following:</text>
          <paragraph num="(i)">
            <text>The scientific and common name of plant species, which shall be native or adaptive to the State;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Planting dates for each species according to propagation method; and</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>Planting stock fertilizer requirements for the entire 5-year monitoring period.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(i)">
          <text>A 5-year monitoring schedule establishing responsibility for the removal of exotic and nuisance vegetation, and permanent establishment of the nontidal wetland system and its component parts. The Department shall encourage the permittee or person conducting an agricultural activity to provide for the long-term maintenance and monitoring of mitigation sites beyond the required monitoring period.</text>
        </paragraph>
        <paragraph num="(j)">
          <text>A detailed budget of the proposed mitigation project costs including:</text>
          <paragraph num="(i)">
            <text>Land acquisition; and</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>Design, which includes construction, monitoring, and maintenance.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(k)">
          <text>Documentation of the protection mechanisms required in Regulation .03K of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>The permittee or person conducting an agricultural activity shall present evidence of a legal right to implement the proposed mitigation plan on the selected sites by providing:</text>
        <paragraph num="(a)">
          <text>An executed deed conveying title to the selected site to the permittee or person conducting an agricultural activity;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>An executed conservation easement agreement;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Written evidence of the landowner's consent to the use of the selected site;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A fully executed option agreement, long-term lease agreement, or contract of sale for the selected site; or</text>
        </paragraph>
        <paragraph num="(e)">
          <text>Other written evidence of a possessory or ownership interest in the selected site.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department may waive all or part of the requirements of Phase II of a mitigation plan.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The Department may not release a bond or terminate monitoring without receipt of a legally binding deed, long-term lease, or conservation easement agreement on those lands where mitigation will occur.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>The permittee or person conducting an agricultural activity shall provide the Department access to the mitigation site during business hours.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>The Department shall render a decision concerning the acceptability of Phase II of a mitigation plan within 45 days of receipt of a completed plan, unless a final permit decision has not been made. If the Department fails to notify the applicant within the 45-day period, the plan shall be considered acceptable unless a final permit decision has not been made.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Mitigation Plan Modification.</text>
      <paragraph num="(1)">
        <text>The Department may require, and a permittee or person conducting an agricultural activity may request, modifications to an approved mitigation plan or component during construction to ensure compliance with this subtitle. Modification, substitution, or other deviations from an approved mitigation plan or component may not be made without approval under this section.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A modification request may be made orally or in writing.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A written request shall contain the following information:</text>
        <paragraph num="(a)">
          <text>The name of the permittee or person conducting an agricultural activity;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Location of the mitigation project;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>A description of the proposed modification; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A justification for the modification.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department's decision may be given orally or in writing. The Department shall notify a permittee or person conducting an agricultural activity of its decision within 10 days of a written request. If an oral decision is made, the Department shall confirm its decision in writing within 10 days. The Department's decision, whether oral or written, is binding on the permittee or person conducting an agricultural activity.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".06" heading="Mitigation Banking.">
    <paragraph num="A.">
      <text>Application Procedures.</text>
      <paragraph num="(1)">
        <text>A person proposing to establish and operate a mitigation bank shall submit a mitigation bank application on a form provided by the Department.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The application shall meet the requirements of COMAR 26.23.02.01B(6).</text>
      </paragraph>
      <paragraph num="(3)">
        <text>A mitigation bank concept plan is submitted with the application and includes:</text>
        <paragraph num="(a)">
          <text>Drawings at a scale equal to 1 inch equals 200 feet or other scale approved by the Department, and showing existing topography, nontidal wetland boundaries and buffers, and 100-year floodplain boundaries, if applicable;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A vicinity map of the proposed mitigation bank site;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Proposed acreage and type of nontidal wetlands to be established in the bank;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>A description of methods of establishment of nontidal wetlands;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The proposed water source;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>A description of proposed earth disturbance necessary;</text>
        </paragraph>
        <paragraph num="(g)">
          <text>A preliminary assessment of impact, if any, on existing nontidal wetlands, buffers, and 100-year floodplains;</text>
        </paragraph>
        <paragraph num="(h)">
          <text>A proposed mechanism to protect the mitigation bank site in perpetuity, including easements, covenants, deed restrictions, or similar means approved by the Department;</text>
        </paragraph>
        <paragraph num="(i)">
          <text>As applicable, information regarding consistency with natural resource management plans, approved watershed plans, forest conservation, local growth management policies, and local comprehensive plans; and</text>
        </paragraph>
        <paragraph num="(j)">
          <text>Other information required by Regulation .05C of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The applicant shall provide other pertinent information as required by the Department.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The Department shall render a decision on the completeness of the mitigation bank application within 45 days of receipt.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>The Department may extend the time period for review of the mitigation bank application due to:</text>
        <paragraph num="(a)">
          <text>Inclement weather conditions; or</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Additional review required by other State, federal, or local agencies.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="B.">
      <text>Public Notice and Public Informational Hearing.</text>
      <paragraph num="(1)">
        <text>The Department may issue a public notice for a proposed mitigation bank less than 5 acres in size.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>After the Department has determined that an application for a proposed mitigation bank greater than 5 acres in size is complete, the Department shall issue, at the applicant's expense, a public notice in accordance with COMAR 26.23.02.02G(2) and (3).</text>
      </paragraph>
      <paragraph num="(3)">
        <text>If requested, a public informational hearing shall be conducted in accordance with COMAR 26.23.02.02H.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Based on information presented at the public informational hearing, the applicant may be required to submit additional information.</text>
      </paragraph>
    </paragraph>
    <paragraph num="C.">
      <text>Mitigation Banking Agreement.</text>
      <paragraph num="(1)">
        <text>A mitigation banking agreement shall be developed after the Department approves a mitigation banking application.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The Department and the applicant shall execute a mitigation banking agreement before:</text>
        <paragraph num="(a)">
          <text>Construction of the mitigation bank; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Consideration by the Department of the use of the mitigation credits by applicants.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(3)">
        <text>At the Department's discretion, a mitigation banking agreement may include:</text>
        <paragraph num="(a)">
          <text>Construction plans and specifications developed in accordance with Regulation .05C(2) of this chapter;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Specifications for:</text>
          <paragraph num="(i)">
            <text>A bond or alternate form of security, as approved by the Department; or</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>A remedy to be imposed on a government agency responsible for a government-operated mitigation bank, upon failure to perform remediation;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(c)">
          <text>Performance standards to demonstrate anticipated success of the mitigation bank, including:</text>
          <paragraph num="(i)">
            <text>Sufficiency of hydrology to sustain a nontidal wetland;</text>
          </paragraph>
          <paragraph num="(ii)">
            <text>An interim standard of a minimum of 45 percent coverage of planted or naturally occurring plant species;</text>
          </paragraph>
          <paragraph num="(iii)">
            <text>A final standard of a minimum of 85 percent coverage of planted or naturally occurring plant species within a time frame specified by the Department which may not exceed the term of the monitoring period specified in Regulation .04A of this chapter; and</text>
          </paragraph>
          <paragraph num="(iv)">
            <text>Evidence to document that the mitigation bank is providing or will provide specific nontidal wetland functions;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(d)">
          <text>Provisions for post-construction monitoring and maintenance of the mitigation bank consistent with Regulation .04A of this chapter;</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The executed instrument to protect the mitigation bank in perpetuity;</text>
        </paragraph>
        <paragraph num="(f)">
          <text>Bank operation and maintenance procedures;</text>
        </paragraph>
        <paragraph num="(g)">
          <text>Bank operator responsibilities;</text>
        </paragraph>
        <paragraph num="(h)">
          <text>Remediation procedures;</text>
        </paragraph>
        <paragraph num="(i)">
          <text>Accounting and reporting requirements;</text>
        </paragraph>
        <paragraph num="(j)">
          <text>Monitoring requirements;</text>
        </paragraph>
        <paragraph num="(k)">
          <text>Mitigation bank close-out procedures;</text>
        </paragraph>
        <paragraph num="(l)">
          <text>Procedures for termination of the agreement; and</text>
        </paragraph>
        <paragraph num="(m)">
          <text>Other terms agreed upon by the bank operator and the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The bank operator shall construct, operate, and maintain the mitigation bank according to the terms of the mitigation banking agreement.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The Department shall approve, in writing, all revisions, amendments, or modifications to the mitigation banking agreement.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>The bank operator shall notify the Department upon completion of construction of the mitigation bank.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Within 60 days of completion of construction, the bank operator shall submit to the Department:</text>
        <paragraph num="(a)">
          <text>As-built drawings with post-construction contours; and</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Drawings showing actual planting, which are attached to and made a part of the mitigation banking agreement.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(8)">
        <text>The bank operator shall allow representatives or agents of the Department to enter the mitigation bank at any time during or after construction to conduct inspections and to assess the success of the mitigation bank.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Timing of Sale of Mitigation Credit and Approval of Mitigation Bank Use.</text>
      <paragraph num="(1)">
        <text>The bank operator may select the time to begin sale of credits.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>The sale of credits by a bank operator may not imply approval of the use of those credits by the Department for specific projects.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Department may approve use of not more than 1/2 of the acreage in a mitigation bank before the end of two full growing seasons after construction, based on approval by the Department of:</text>
        <paragraph num="(a)">
          <text>Executed mitigation banking agreement;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>As-built plans showing completed site construction, preparation, and contouring;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Executed mechanism to protect the mitigation bank in perpetuity; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Fulfillment of bonding requirements, if applicable.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department may approve use of the remaining 1/2 of the acreage after two full growing seasons have elapsed, if remediation is not required and the interim performance standards specified in the mitigation banking agreement have been met.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The Department shall advise the bank operator and applicants proposing to use credits of the Department's approval of the bank.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>The Department may approve use of mitigation credits as partial fulfillment of a permittee's mitigation requirement.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>Accounting and Reporting Requirements.</text>
      <paragraph num="(1)">
        <text>Within the time frames allowed in the mitigation banking agreement, the bank operator shall submit to the Department for each transaction the:</text>
        <paragraph num="(a)">
          <text>Name and address of the person purchasing or returning credits;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Date of the transaction;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Amount and type of wetland acreage to be used as credit; and</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Project name, location, and the Department's application processing number, if applicable, for which use of mitigation credit is proposed.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>A government agency responsible for a government operated mitigation bank shall submit the name and address of the agency utilizing credits, the name of the contact person, and the information specified in §E(1)(b)—(d) of this regulation.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The bank operator and the Department shall jointly record withdrawal of the acreage approved for use by an applicant.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Mitigation credit will be withdrawn from the mitigation bank in the order approved by the Department.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>For each year of operation, a summary of all activities relating to the sale or transfer of mitigation credits is submitted to the Department within 30 days after December 31 of each calendar year.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>The bank operator shall notify the Department if the bank operator wishes to cease consideration of areas representing unsold or unused credits as part of the mitigation bank.</text>
      </paragraph>
      <paragraph num="(7)">
        <text>Mitigation credit withdrawn for a project anticipated to be authorized by the Department under this subtitle is returned to the mitigation bank if the Department:</text>
        <paragraph num="(a)">
          <text>Denies the authorization;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Authorizes impacts that are less than the amount anticipated; or</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Requires mitigation by a method other than use of the mitigation credit.</text>
        </paragraph>
      </paragraph>
    </paragraph>
    <paragraph num="F.">
      <text>Remediation.</text>
      <paragraph num="(1)">
        <text>The Department may require remediation at any time before the end of the monitoring period to ensure compliance with the performance standards specified in the mitigation banking agreement.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>To determine if remediation is necessary, the Department may require that specific data be collected and submitted by the bank operator.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Remediation required by the Department is directly related to ensuring that the performance standards specified in the mitigation banking agreement will be met.</text>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department may withhold or suspend approval of use of credits in the bank until remediation is completed to the Department's satisfaction.</text>
      </paragraph>
      <paragraph num="(5)">
        <text>The Department may consider continuing to approve use of credits in the bank for that portion of the bank not requiring remediation.</text>
      </paragraph>
      <paragraph num="(6)">
        <text>If, after a period to be specified in a mitigation banking agreement, the Department determines that a government agency responsible for a government-operated mitigation bank has not performed remediation, the remedy specified in the mitigation banking agreement is imposed.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Close Out of Mitigation Banks.</text>
      <paragraph num="(1)">
        <text>The Department and a bank operator may close out a mitigation bank when:</text>
        <paragraph num="(a)">
          <text>All credits have been withdrawn;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Monitoring has been completed to the Department's satisfaction;</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Remediation, if required by the Department, has been completed to the Department's satisfaction;</text>
        </paragraph>
        <paragraph num="(d)">
          <text>Protection in perpetuity has been established; and</text>
        </paragraph>
        <paragraph num="(e)">
          <text>The bond or alternate form of security, if applicable, has been released.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(2)">
        <text>The bank operator shall notify the Department in writing to request confirmation of the decision to close out the mitigation bank.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>The Department shall confirm the close out within 45 days of receipt of the request, unless additional information is needed or the conditions in §G(1) of this regulation have not been met.</text>
      </paragraph>
    </paragraph>
  </regulation>
  <regulation prefix="Regulation" num=".07" heading="Nontidal Wetland Compensation Fund.">
    <paragraph num="A.">
      <text>The Department may accept monetary compensation if it determines that mitigation for nontidal wetland losses is not a feasible alternative. Monetary compensation may not substitute for the requirement to avoid or minimize nontidal wetland losses.</text>
    </paragraph>
    <paragraph num="B.">
      <text>When a permittee or person conducting an agricultural activity maintains that mitigation is not a feasible alternative based on the requirements of §C of this regulation, the permittee or person conducting an agricultural activity shall propose that the Department accept monetary compensation. A proposal for acceptance of monetary compensation shall be submitted as a part of Phase I of a mitigation plan or as part of the mitigation component of the soil conservation and water quality plan submitted to the Department for review.</text>
    </paragraph>
    <paragraph num="C.">
      <text>Monetary compensation may be accepted under one or more of the following circumstances:</text>
      <paragraph num="(1)">
        <text>The size of the nontidal wetland loss is less than 1 acre.</text>
      </paragraph>
      <paragraph num="(2)">
        <text>In-kind mitigation of nontidal wetlands to be lost is technically infeasible.</text>
      </paragraph>
      <paragraph num="(3)">
        <text>An acceptable mitigation site cannot be located within the areas identified in Regulation .03H of this chapter, as documented by submission of:</text>
        <paragraph num="(a)">
          <text>A map and description of sites rejected.</text>
        </paragraph>
        <paragraph num="(b)">
          <text>A justification of why each site was unsuitable for mitigation.</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Other information required by the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>The Department recommends the use of the compensation fund.</text>
      </paragraph>
    </paragraph>
    <paragraph num="D.">
      <text>Monetary compensation proposals may be rejected if the Department determines that:</text>
      <paragraph num="(1)">
        <text>Mitigation requirements can be fulfilled on-site; or</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Conditions in §C of this regulation are not fulfilled.</text>
      </paragraph>
    </paragraph>
    <paragraph num="E.">
      <text>The Department shall render decisions on proposals to accept monetary compensation based on §B of this regulation as part of a final permit or mitigation component decision.</text>
    </paragraph>
    <paragraph num="F.">
      <text>The Nontidal Wetland Compensation Fund shall include:</text>
      <paragraph num="(1)">
        <text>Monetary compensation paid by a permittee or person conducting an agricultural activity instead of engaging in the creation, restoration, or enhancement of nontidal wetlands;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>A civil or criminal penalty imposed by a court pursuant to COMAR 26.23.01.05 or 26.23.02.09; and</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Other monetary contributions to the Nontidal Wetland Compensation Fund from other sources.</text>
      </paragraph>
    </paragraph>
    <paragraph num="G.">
      <text>Funds in the Nontidal Wetland Compensation Fund may be used only for the creation, restoration, or enhancement of nontidal wetlands. This includes:</text>
      <paragraph num="(1)">
        <text>Development of mitigation plans;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Location and acquisition of land;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Acquisition of easements;</text>
      </paragraph>
      <paragraph num="(4)">
        <text>Design, construction, planting, monitoring, and maintenance of mitigation sites; and</text>
      </paragraph>
      <paragraph num="(5)">
        <text>Purchase of credits in mitigation banks.</text>
      </paragraph>
    </paragraph>
    <paragraph num="H.">
      <text>The Department may determine monetary compensation fees based on costs anticipated to construct mitigation projects, including location and acquisition of land, design, construction, maintenance, and monitoring costs. The Department may use the following to determine these costs:</text>
      <paragraph num="(1)">
        <text>Land acquisition costs derived from fair market value of the converted nontidal wetland by the permittee or person conducting an agricultural activity, based on at least two independent appraisals or other evidence of land value which may be acceptable to the Department;</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Design costs derived from a percentage of construction costs or actual costs for projects similar in size and complexity completed by a permittee, person conducting an agricultural activity, or the Department;</text>
      </paragraph>
      <paragraph num="(3)">
        <text>Construction costs derived on a case-by-case basis, taking into account the following factors:</text>
        <paragraph num="(a)">
          <text>Nontidal wetland type, size, and functions;</text>
        </paragraph>
        <paragraph num="(b)">
          <text>Amount of planting, grading, and other site preparations; and</text>
        </paragraph>
        <paragraph num="(c)">
          <text>Costs of similar mitigation projects completed by permittees, persons conducting agricultural activities, or the Department; and</text>
        </paragraph>
      </paragraph>
      <paragraph num="(4)">
        <text>Monitoring and maintenance costs derived from a percentage of construction costs or actual costs for projects similar in size and complexity completed by a permittee, person conducting an agricultural activity, or the Department.</text>
      </paragraph>
    </paragraph>
    <paragraph num="I.">
      <text>Funds credited and any interest accrued to the Nontidal Wetland Compensation Fund shall remain available until expended, and may not revert to the general fund.</text>
    </paragraph>
    <paragraph num="J.">
      <text>The Department shall prepare an annual report on the Nontidal Wetland Compensation Fund that includes an accounting of:</text>
      <paragraph num="(1)">
        <text>Financial receipts and expenditures to and from the Fund; and</text>
      </paragraph>
      <paragraph num="(2)">
        <text>Mitigation projects completed and in progress.</text>
      </paragraph>
    </paragraph>
    <paragraph num="K.">
      <text>The Department shall provide a copy of the annual report to the General Assembly as provided under State Government Article, §2-1312, Annotated Code of Maryland.</text>
    </paragraph>
  </regulation>
  <annotations>
    <annotation type="Authority">Environment Article, §§5-901—5-911, Annotated Code of Maryland</annotation>
    <annotation type="History" subtype="Administrative History">Effective date: March 15, 1990 (17:5 Md. R. 637)</annotation>
    <annotation type="History" subtype="Administrative History">Chapter revised as an emergency provision effective January 1, 1991 (18:2 Md. R. 128)</annotation>
    <annotation type="History" subtype="Administrative History">Chapter revised effective May 13, 1991 (18:9 Md. R. 1007)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01—.04, .08, .09, .14, .15, and .22 amended and Regulation .27 adopted as an emergency provision effective October 1, 1993 (20:21 Md. R. 1649); emergency status expired April 1, 1994</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01—.04, .08, .09, .14, .15, and .22 amended and Regulation .27 adopted as an emergency provision effective June 1, 1994 (21:13 Md. R. 1151); Regulations .01—.04, .08, .09, .14, and .22 amended and .27 adopted permanently effective October 24, 1994, (21:21 Md. R. 1813)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01 and .15—.18 amended and Regulation .17-1 adopted effective November 7, 1994 (21:22 Md. R. 1874)</annotation>
    <annotation type="History" subtype="Administrative History">Regulations .01—.07 were recodified from Regulations .13—.18, respectively, under COMAR 08.05.04 Nontidal Wetlands, February 1996</annotation>
  </annotations>
</chapter>