<subtitle num="24" heading="Tidal Wetlands" title_num="26" title_heading="Department of the Environment">
  <chapter num="01" heading="General">
    <regulation prefix="Regulation" num=".01" heading="Purpose.">
      <paragraph num="A.">
        <text>It is the goal of the State to preserve the tidal wetlands of the State, prevent their loss and despoliation, and strive for a net resource gain in tidal wetland acreage and function. An applicant for a license or permit required under this subtitle shall design a project to first avoid and then minimize the loss of tidal wetlands. If the Department determines that the loss of tidal wetlands is unavoidable and may be licensed or permitted by the Department or recommended for licensing to the Board of Public Works, the permit or license shall require mitigation in accordance with this subtitle. Tidal wetlands are found in the Chesapeake Bay, the tidal tributaries to the Chesapeake Bay, and the 3-mile area seaward of the low water mark of Maryland's Atlantic coast.</text>
      </paragraph>
      <paragraph num="B.">
        <text>These regulations combine in one subtitle the Department's processing of applications for licenses to conduct activities in or over State tidal wetlands and for permits to conduct activities on private tidal wetlands. However, it is not the intent of these regulations to change the legal distinctions between State tidal wetlands and private tidal wetlands. The State holds State tidal wetlands in a proprietary capacity, in trust for the benefit of the people of Maryland. The Department regulates the activities of private persons on private tidal wetlands. When the Department acts on the application for a permit to conduct activities on private tidal wetlands, it is regulating the exercise of preexisting property rights. In contrast, when the State acts on an application for a license to conduct activities in or over State tidal wetlands, it is deciding whether or not to grant to a person certain limited property rights that the person did not have previously, and, in making that decision, the State enjoys the same discretion that any owner has in deciding whether to grant to another an interest in the owner's property.</text>
      </paragraph>
      <paragraph num="C.">
        <text>This subtitle describes the Department's review of license applications for the dredging or filling of State tidal wetlands and the construction, reconstruction, or repair of structures on State tidal wetlands. Following the Department's review of an application, the Department shall make a decision or the Department shall submit a recommendation to the Board of Public Works. The Board of Public Works shall take final action on an application for a license in accordance with COMAR 23.02.04.</text>
      </paragraph>
      <paragraph num="D.">
        <text>This subtitle also describes the Department's review of permit applications for dredging, filling, removing, or otherwise altering or polluting private tidal wetlands. Following review of an application, the Department shall make a decision in accordance with these regulations.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Definitions.">
      <paragraph num="A.">
        <text>In this subtitle, the following terms have the meanings indicated.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Terms Defined.</text>
        <paragraph num="(1)">
          <text>“Administration” means the Water Management Administration, a unit of the Department of the Environment designated by the Secretary of the Environment to administer Environment Article, Title 16, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>“Administrative Procedure Act” means the provisions of State Government Article, Title 10, Subtitle 2, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>“Aquaculture” has the meaning stated in Natural Resources Article, §4-11A-01, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>“Bathymetry” means the water depth relative to the elevation of mean low water.</text>
        </paragraph>
        <paragraph num="(4-1)">
          <text>“Beach nourishment” means a structural shoreline stabilization measure that is:</text>
          <paragraph num="(a)">
            <text>Made by placing or pumping appropriately-sized sand from elsewhere onto an eroding shore; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Designed to:</text>
            <paragraph num="(i)">
              <text>Create a new beach; or</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Restore or widen an existing beach.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>“Best management practices” means conservation practices or systems of practices and management measures that:</text>
          <paragraph num="(a)">
            <text>Control soil loss and reduce water quality degradation caused by runoff, nutrients, animal waste, toxicants, and sediment if best management practices do not dredge or fill tidal wetlands; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Minimize adverse impacts to the surface water, ground water flow, circulation patterns, and to the chemical, physical, and biological characteristics of tidal wetlands.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>“Board” means the Board of Public Works.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>“Boathouse” means a structure with a roof or cover, or similar device placed over open water to protect a boat or other vessel.</text>
        </paragraph>
        <paragraph num="(7-1)">
          <text>“Breakwater” means a structural shoreline stabilization measure comprised of a segmented or non-segmented stone structure that is:</text>
          <paragraph num="(a)">
            <text>Typically placed offshore parallel to the shoreline; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Designed to dissipate wave energy and reduce erosion.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(7-2)">
          <text>“Buffer management plan” has the meaning stated in COMAR 27.01.09.01.</text>
        </paragraph>
        <paragraph num="(7-3)">
          <text>“Bulkhead” means a structural shoreline stabilization measure comprised of a vertical retaining wall composed of wood, stone, concrete, plastic, steel, or other similar material that is:</text>
          <paragraph num="(a)">
            <text>Placed parallel to the shoreline; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Designed to control erosion.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(8)">
          <text>“Containment structure” means a facility designed for the sole purpose of accepting and confining dredged material from tidal waters while allowing the release of effluent, and excludes those structures designed to contain, impound, or obstruct the waters of the State as defined by Environment Article, §5-501, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(9)">
          <text>“Coastal Bays” means the estuaries situated between Maryland's Atlantic Ocean barrier islands and the opposing shoreline of the mainland which include Chincoteague Bay, Sinepuxent Bay, Isle of Wight, Newport Bay, Assawoman Bay, and the St. Martin River.</text>
        </paragraph>
        <paragraph num="(10)">
          <text>“Critical Area” has the meaning stated in COMAR 27.01.01.01B.</text>
        </paragraph>
        <paragraph num="(11)">
          <text>Critical Area Buffer.</text>
          <paragraph num="(a)">
            <text>“Critical Area buffer” means an area in the Critical Area that:</text>
            <paragraph num="(i)">
              <text>Based on conditions present at the time of development, is immediately landward from mean high water of tidal waters, the edge of each bank of a tributary stream, or the landward boundary of a tidal wetland; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Exists or may be established in natural vegetation to protect a stream, tidal wetland, tidal waters, or terrestrial environment from human disturbance.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>“Critical Area buffer” includes an area of:</text>
            <paragraph num="(i)">
              <text>At least 100 feet, even if that area was previously disturbed by human activity; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Expansion for contiguous areas, including a steep slope, hydric soil, highly erodible soil, nontidal wetland, or a Nontidal Wetland of Special State Concern as defined in COMAR 26.23.01.01.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(11-1)">
          <text>“Critical Area Commission” means the Critical Area Commission for the Chesapeake and Atlantic Coastal Bays, as established under the Natural Resources Article, Title 8, Subtitle 18, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(12)">
          <text>“Department” means the Department of the Environment.</text>
        </paragraph>
        <paragraph num="(13)">
          <text>“Direct discharge” means the concentrated release of storm water to tidal waters or vegetated tidal wetlands from new development or redevelopment projects in the Critical Area.</text>
        </paragraph>
        <paragraph num="(14)">
          <text>“Director” means the Director of the Water Management Administration.</text>
        </paragraph>
        <paragraph num="(15)">
          <text>“Dredging” means the removal or displacement by any means of soil, sand, gravel, shells, or other material, whether or not of intrinsic value, from any State or private tidal wetlands.</text>
        </paragraph>
        <paragraph num="(16)">
          <text>“Emergency condition” means a sudden, unforeseen occurrence caused by act of God, natural disaster, or other similar natural event or catastrophe when the health, safety, or welfare of the citizens of the State would be jeopardized by a delay in issuance of a license or permit.</text>
        </paragraph>
        <paragraph num="(17)">
          <text>“Endangered species” has the meaning stated in COMAR 08.03.08.01.</text>
        </paragraph>
        <paragraph num="(17-1)">
          <text>“Fetch” means the linear distance of open water over which wind-generated waves of a certain direction, speed, and duration travel unobstructed before reaching a shoreline.</text>
        </paragraph>
        <paragraph num="(18)">
          <text>Filling.</text>
          <paragraph num="(a)">
            <text>“Filling” means the:</text>
            <paragraph num="(i)">
              <text>Displacement of navigable water by the depositing of soil, sand, gravel, shells, or other materials, including pilings, piers, boathouses, deadweights, or riprap into State or private tidal wetlands;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Artificial alteration of tidal water levels by any physical structure, drainage ditch, or otherwise; or</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Discharge of water from storm drainage projects directly into tidal waters of the State.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>“Filling” does not include:</text>
            <paragraph num="(i)">
              <text>Drainage of agricultural land;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>In-place replacement or repair of functional shore erosion control structures using substantially similar materials and construction design;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Planting of wetlands vegetation when no grading or fill in State or private wetlands is necessary; or</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Marking channels and harbors and establishing aids to navigation if approval has been granted by the United States Coast Guard.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(19)">
          <text>“Fish” has the meaning stated in Natural Resources Article, §4-101, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(20)">
          <text>“Functional” means performing at least 85 percent of the action that a structure was originally designed to perform.</text>
        </paragraph>
        <paragraph num="(21)">
          <text>“General wetlands license” means written authorization from the Department based on a standing authorization by the Board for recurrent or minimally disruptive activities conducted in State tidal wetlands.</text>
        </paragraph>
        <paragraph num="(22)">
          <text>“General wetlands permit” means written authorization from the Department for activities conducted in private tidal wetlands that cause only minimal individual and cumulative adverse impacts.</text>
        </paragraph>
        <paragraph num="(22-1)">
          <text>“Groin” means a structural shoreline stabilization measure comprised of stone, wood, plastic, steel, or other similar material that is:</text>
          <paragraph num="(a)">
            <text>Typically placed perpendicular to the shoreline; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Designed to trap sand and reduce erosion.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(23)">
          <text>“Historic property” means a district, site, building, structure, monument, or object significant in the prehistory, history, upland and underwater archeology, architecture, engineering, and culture of the State, including artifacts, records, and remains related to a district, site, building, structure, or object.</text>
        </paragraph>
        <paragraph num="(24)">
          <text>“In kind” means having characteristics closely approximating original characteristics, including those of a vegetated tidal wetland before that wetland was adversely impacted, or replacement of a structure with a structure of similar materials and dimensions.</text>
        </paragraph>
        <paragraph num="(25)">
          <text>“In the dry” means activities performed above or landward of the mean high water line and all tidal wetland vegetation.</text>
        </paragraph>
        <paragraph num="(25-1)">
          <text>“Jetty” means a structural shoreline stabilization measure comprised of stone, wood, plastic, steel, or other similar material that is:</text>
          <paragraph num="(a)">
            <text>Placed at inlets; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Designed to:</text>
            <paragraph num="(i)">
              <text>Stabilize the position of a channel;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Shield vessels from wave forces; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Control the movement of sand along adjacent beaches by minimizing the movement of sand into a channel.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(26)">
          <text>“Landward boundary of tidal wetlands” means the common boundary between upland or nontidal wetlands, and State or private wetlands, as defined in this subtitle.</text>
        </paragraph>
        <paragraph num="(27)">
          <text>“License” means written authorization by the Board or by the Department under delegation from the Board to dredge, fill, construct structures, or conduct other activities involving State tidal wetlands which conveys a limited property interest.</text>
        </paragraph>
        <paragraph num="(28)">
          <text>“Maintenance dredging” means the removal or displacement by any means of soil, sand, gravel, shells, or other material, whether or not of intrinsic value, from any State or private tidal wetlands, that restores a navigation channel, marina, or mooring basin to depths confirmed after 1972.</text>
        </paragraph>
        <paragraph num="(29)">
          <text>“Marina” means a facility for the mooring, docking, or storing of more than ten vessels on tidal navigable waters, including a commercial, noncommercial, or community facility.</text>
        </paragraph>
        <paragraph num="(30)">
          <text>“Mean higher high water” means the average of the higher high water height of each tidal day observed over the national tidal datum epoch, including a spring tide.</text>
        </paragraph>
        <paragraph num="(31)">
          <text>“Mean high water” means the average of all the high water levels observed over the national tidal datum epoch.</text>
        </paragraph>
        <paragraph num="(32)">
          <text>“Mean high water line” means the line where the land meets the water surface at the elevation of mean high water.</text>
        </paragraph>
        <paragraph num="(33)">
          <text>“Mean low water” means the average of all the low water levels observed over the national tidal datum epoch.</text>
        </paragraph>
        <paragraph num="(34)">
          <text>“Mitigation” means the creation, restoration, or enhancement of tidal wetlands lost or damaged due to dredging or filling.</text>
        </paragraph>
        <paragraph num="(35)">
          <text>“National tidal datum epoch” means the specific 19-year period adopted by the National Ocean Service as the official time segment over which tidal observations are taken and reduced to obtain mean values for tidal datums.</text>
        </paragraph>
        <paragraph num="(35-1)">
          <text>Nonstructural Shoreline Stabilization Measure.</text>
          <paragraph num="(a)">
            <text>“Nonstructural shoreline stabilization measure” means an erosion control measure that is dominated by tidal wetland vegetation and is designed to preserve the natural shoreline, minimize erosion, and establish aquatic habitat.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Nonstructural shoreline stabilization measure” includes a living shoreline.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(36)">
          <text>“Nontidal wetland” has the meaning stated in COMAR 26.23.01.01.</text>
        </paragraph>
        <paragraph num="(37)">
          <text>“Non-water-dependent structure or activity” means a temporary or permanent structure or activity, which by reason of its intrinsic nature or operation does not require location in or over State or private tidal wetlands.</text>
        </paragraph>
        <paragraph num="(38)">
          <text>“Out of kind” means having characteristics not closely approximating those of a tidal wetland before that wetland was adversely impacted, or replacement of a structure with a structure of dissimilar materials or dimensions.</text>
        </paragraph>
        <paragraph num="(39)">
          <text>“Permit” means written authorization by the Department to dredge, fill, construct structures, or to conduct certain other activities involving private tidal wetlands.</text>
        </paragraph>
        <paragraph num="(40)">
          <text>“Person” means any natural person, partnership, joint stock company, unincorporated association or society, the federal government, the State, any unit of the State, a political subdivision, or other corporation of any type.</text>
        </paragraph>
        <paragraph num="(41)">
          <text>Pier.</text>
          <paragraph num="(a)">
            <text>“Pier” means any fixed or floating pier, wharf, dock, walkway, or other similar water-dependent structure constructed on or over State or private tidal wetlands for the purpose of gaining access to the navigable waters of the State.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Pier” does not include a structure on pilings or stilts that was constructed before December 2, 1985, landward of the tidal wetland boundaries.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(42)">
          <text>“Private tidal wetlands” means:</text>
          <paragraph num="(a)">
            <text>Land not considered State wetland bordering on or lying beneath tidal waters, which is subject to regular or periodic tidal action and supports aquatic growth;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Tidal wetlands transferred by the State by a valid lease, patent, or grant confirmed by Article 5 of the Maryland Declaration of Rights, to the extent of the interest transferred; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Tidal waters created by the excavation of upland unless conveyed to the State.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(43)">
          <text>“Public informational hearing” means a meeting, open to the public, at which the applicant or the Department presents information concerning a permit or license and the Department receives oral and written comments concerning a decision to issue or deny a permit or a license. A public informational hearing is not a contested case hearing under State Government Article, §10-202(d), Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(44)">
          <text>“Regular or periodic tidal action” means the rise and fall of the sea produced by the attraction of the sun and the moon uninfluenced by wind or any other circumstances.</text>
        </paragraph>
        <paragraph num="(45)">
          <text>Repair.</text>
          <paragraph num="(a)">
            <text>“Repair” means an activity that restores the scope, size, and design of a functional structure to its previously authorized, undamaged condition.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Repair” does not include activities that change the size or scope of a project beyond the original design and dredge or fill tidal wetlands that were not previously impacted by the project.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(46)">
          <text>“Restoration” means reestablishment of tidal wetlands on former tidal wetland sites.</text>
        </paragraph>
        <paragraph num="(47)">
          <text>“Revetment” means a structural shoreline stabilization measure comprised of stone, broken concrete, or other similar material that is:</text>
          <paragraph num="(a)">
            <text>Typically placed parallel to the shoreline; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Designed to:</text>
            <paragraph num="(i)">
              <text>Prevent erosion;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Fortify a bulkhead; or</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Stabilize an embankment.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(48)">
          <text>“Riparian landowner” means a property owner whose land borders on tidal wetlands or waters of the State.</text>
        </paragraph>
        <paragraph num="(49)">
          <text>“Riparian rights” means the rights of an owner of land bordering on tidal wetlands or waters of the State as recognized by Environment Article, Title 16, Annotated Code of Maryland.</text>
        </paragraph>
        <paragraph num="(50)">
          <text>“Shallow water habitat” means aquatic habitat less than 3 feet in depth at mean low water.</text>
        </paragraph>
        <paragraph num="(51)">
          <text>“Species in need of conservation” has the meaning stated in COMAR 08.03.08.01.</text>
        </paragraph>
        <paragraph num="(52)">
          <text>“State tidal wetlands” means any land under the navigable waters of the State below the mean high tide, affected by the regular rise and fall of the tide. Tidal wetlands of this category which have been transferred by the State by a valid lease, patent, or grant confirmed by Article 5 of the Maryland Declaration of Rights are considered private tidal wetlands to the extent of the interest transferred.</text>
        </paragraph>
        <paragraph num="(53)">
          <text>Structural shoreline stabilization measure.</text>
          <paragraph num="(a)">
            <text>"Structural shoreline stabilization measure” means an erosion control measure that uses devices to armor and stabilize an area landward of the measure from further erosion.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>"Structural shoreline stabilization measure” includes the use of a bulkhead, gabion, revetment, groin, breakwater, jetty, sand, beach nourishment, and any other similar structure, or any other device for erosion control or vessel protection.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(54)">
          <text>Structure.</text>
          <paragraph num="(a)">
            <text>“Structure” means building or construction materials, or a combination of those materials, that are purposely assembled or joined together on or over land or water.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Structure” includes a temporary or permanent fixed or floating pier, piling, deck, walkway, dwelling, building, boathouse, platform, gazebo, or shelter for the purpose of marine access, navigation, working, eating, sleeping, or recreating.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(55)">
          <text>Submerged Aquatic Vegetation.</text>
          <paragraph num="(a)">
            <text>“Submerged aquatic vegetation (SAV)” means a vascular hydrophyte, which is rooted or unrooted, that lies entirely beneath the surface of the water except for the flowering parts of some species. Examples include Zannichellia palustris, Ruppia sp., and Potamogeton sp.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>“Submerged aquatic vegetation” does not include algae.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(56)">
          <text>“Threatened species” has the meaning stated in COMAR 08.03.08.01.</text>
        </paragraph>
        <paragraph num="(57)">
          <text>“Tidal wetlands” means all State and private tidal wetlands, marshes, submerged aquatic vegetation, lands, and open water within the Chesapeake Bay and its tidal tributaries, the Coastal Bays and their tidal tributaries, and the Atlantic Ocean to a distance of 3 miles offshore of the low water mark.</text>
        </paragraph>
        <paragraph num="(58)">
          <text>“Tidal wetland boundary map” means a map or aerial photograph on a scale of 1 inch to 200 feet that delineates the landward boundary of tidal wetlands and is adopted by the Department.</text>
        </paragraph>
        <paragraph num="(59)">
          <text>“Unified soil classification system” means a classification system used to classify sedimentary materials by grain size into gravel, silt, and clays. It is the principal classification system used by engineers, and its boundaries correspond to U. S. standard sieve sizes.</text>
        </paragraph>
        <paragraph num="(60)">
          <text>“Upland” means any area that does not qualify as a tidal or nontidal wetland.</text>
        </paragraph>
        <paragraph num="(61)">
          <text>“Utility line” means an underground or overhead transmission line, conduit pipe, cable, or wire for the conveyance of public or private water, sewage, natural gas, or petroleum, or the transmission of electricity or telecommunications.</text>
        </paragraph>
        <paragraph num="(61-1)">
          <text>“Waiver” means a decision by the Department that a person is not required to construct a nonstructural shoreline stabilization measure.</text>
        </paragraph>
        <paragraph num="(62)">
          <text>“Water dependent” means a temporary or permanent structure or activity, which by reason of its intrinsic nature or operation, requires location in or over State or private wetlands.</text>
        </paragraph>
        <paragraph num="(62-1)">
          <text>“Water Quality Certification” means the certification required under COMAR 26.08.02.10.</text>
        </paragraph>
        <paragraph num="(62-2)">
          <text>“Wetlands License” means written authorization by the Board to dredge, fill, construct a structure, or conduct any other activity involving State tidal wetlands that does not qualify for approval under a general wetlands license.</text>
        </paragraph>
        <paragraph num="(62-3)">
          <text>“Wetlands Permit” means written authorization by the Department to dredge, fill, remove, alter, pollute, or conduct any other activity involving private tidal wetlands that does not qualify for approval under a general wetlands permit.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Delegation of Authority from the Board of Public Works.">
      <text>In accordance with COMAR 23.02.04.04A, the Board has delegated to the Department the authority to reject, authorize, modify, condition, or deny applications for construction or replacement of pilings, fixed or floating piers, decks, walkways, boathouses, and related structures on piers.</text>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Public Notice.">
      <paragraph num="A.">
        <text>Exemptions from Public Notice for a State Wetlands License. If the Department recommends to the Board that a State wetlands license be granted, the Board may issue a license without public notice for:</text>
        <paragraph num="(1)">
          <text>Projects which qualify under the general license in COMAR 26.24.02.04;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Construction of a shore erosion control structure other than a revetment, if the fill area is less than 300 feet in length parallel to the upland and as close to the upland as structurally feasible, but not more than 10 feet channelward of the mean high water line;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Repair or replacement of a bulkhead for the purpose of shore erosion control when the bulkhead is presently functional, but is deteriorating or damaged, only if the repair or replacement structure does not extend more than 18 inches channelward of the existing structure measured from the channelward face of the existing piling to the landward face of the proposed sheeting, although replacement may include stone or broken concrete placed along the base of the bulkhead, only if the stone or broken concrete does not extend more than 10 feet channelward of the bulkhead; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Construction or repair of a private, noncommercial boat ramp only if the ramp does not exceed 12 feet in width and extend more than 30 feet channelward of the mean high water line.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Exemptions from Public Notice for Private Wetlands Permits. The Department may:</text>
        <paragraph num="(1)">
          <text>Issue a private wetlands permit without a public notice for the following categories of projects:</text>
          <paragraph num="(a)">
            <text>Projects which qualify under the general permit in COMAR 26.24.02.05,</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Construction of tide gates designed to prevent the encroachment of salt water into agricultural drainage ditches, and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Installation of underground utilities, if the surface of the wetlands is restored substantially to its original condition;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Authorize work in private wetlands without public notice when an emergency exists.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>An applicant shall notify adjoining riparian property owners in writing at the time of application if the proposed project requires public notice. The notification shall include:</text>
        <paragraph num="(1)">
          <text>A copy of the application and plans for the proposed project; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A statement advising the property owner to direct any comments or concerns directly to the Department within 2 weeks of receipt.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>The Department shall issue a public notice of an opportunity to submit written comments, or to request a public informational hearing about the application for a State wetlands license or private wetlands permit. Public notice is not required for activities exempted under §§A and B of this regulation.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The notice in §D of this regulation shall:</text>
        <paragraph num="(1)">
          <text>Contain:</text>
          <paragraph num="(a)">
            <text>The name of the applicant;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A general description of the nature and location of the proposed activity including the street address of the proposed activity;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Instructions for submission of written comments or a request for a public informational hearing;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The expiration date for the opportunity to comment or to request a public informational hearing; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>The address and telephone number of an individual in the Department from whom information about the application may be obtained;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Be given by:</text>
          <paragraph num="(a)">
            <text>Publication in a daily newspaper distributed in one or more counties which the Department determines may be directly affected by the proposed activity, or if there is no local daily newspaper, in a newspaper of general circulation in that county;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Publication in the Maryland Register;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Joint notice with other units or programs reviewing applications for other approvals within the Department; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Selected mailing to federal, State, county, or municipal authorities, and other list of interested persons, including anyone who has:</text>
            <paragraph num="(i)">
              <text>Submitted written comments on the specific project in question,</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Requested to be kept informed about the specific project, or</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Requested receipt of public notices for tidal wetlands licenses and permits.</text>
            </paragraph>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Public Informational Hearings.">
      <paragraph num="A.">
        <text>An interested person may request the Department or the Board to hold a public informational hearing on a project requiring public notice. A request shall be in writing to the Department.</text>
      </paragraph>
      <paragraph num="B.">
        <text>If a hearing is requested, the Department shall set the date, time, and place for the hearing. Notice of the hearing shall be given by:</text>
        <paragraph num="(1)">
          <text>Publication in a daily newspaper distributed in one or more counties which the Department determines may be directly affected by the project, or if there is no local daily newspaper, in a newspaper of general circulation in that county;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Publication in the Maryland Register; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Selected mailing to federal, State, county, or municipal authorities, and other list of interested persons.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The hearing shall take place not less than 14 calendar days after publication of the public notice of the public informational hearing.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The hearing shall be conducted by a representative of the Board or the Department's designee. The individual authorized to conduct the public hearing shall be designated as the hearing officer.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The applicant and interested persons shall be given an opportunity at the informational hearing to present facts and make statements for or against granting the license or permit. Questions may be asked of, and directed to, the hearing officer, but cross-examination may not be conducted. The hearing is not a contested case hearing under State Government Article, Title 10, Subtitle 2, Annotated Code of Maryland.</text>
      </paragraph>
      <paragraph num="F.">
        <text>The order of the presentation is determined by the hearing officer and may be conducted as follows:</text>
        <paragraph num="(1)">
          <text>Introduction of the activity and participants by the hearing officer;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Statement of legal authorities, public policy, and procedures by the hearing officer;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Presentation of the proposed project by the applicant;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Questions about the activity;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Statements by public officials;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Statements in opposition;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Statements in support; and</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Closing of the hearing by the hearing officer.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>The hearing officer has the authority and duty to:</text>
        <paragraph num="(1)">
          <text>Conduct a full and fair public informational hearing;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Act to avoid unnecessary delay and to maintain order;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Regulate the course of the public hearing and the conduct of the participants;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Extend the time period for providing supplemental written comments or information for inclusion in the hearing record; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Rule upon a request for a continuance of the hearing.</text>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>At the close of the public comment period, the hearing officer shall prepare an official record of the public informational hearing or comments.</text>
      </paragraph>
      <paragraph num="I.">
        <text>A tape recording or notes of the public informational hearing, if any, may be transcribed if the Department, the applicant, or a participant in the public hearing requests a transcript within 5 working days of the public informational hearing. Costs shall be paid by the requester.</text>
      </paragraph>
      <paragraph num="J.">
        <text>After a public hearing, the Wetlands Administrator for the Board shall present the proposed project at a public meeting of the Board. The Board shall make a final decision under COMAR 23.02.04.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Violations of Statutory, Regulatory, License, or Permit Requirements.">
      <paragraph num="A.">
        <text>Determination of Violation. The Department shall serve a written complaint on a violator if it determines that there has been a violation of:</text>
        <paragraph num="(1)">
          <text>Any provision of Environment Article, §§16-101—16-503, Annotated Code of Maryland;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A regulation in this subtitle;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A license or permit condition; or</text>
        </paragraph>
        <paragraph num="(4)">
          <text>An administrative order.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Complaints. A complaint shall comply with the notice requirements under COMAR 08.01.04.05.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Orders. At any time, including during an enforcement action, the Department may issue an administrative order requiring the violator to take corrective action within a certain time period. The order may require the violator to:</text>
        <paragraph num="(1)">
          <text>Cease the violation;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Stabilize the site;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Stop all construction work at the site of a regulated activity;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Restore unlawfully affected State or private wetlands; or</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Submit a written report or plan concerning the violation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Suspension or Revocation.</text>
        <paragraph num="(1)">
          <text>Grounds for License or Permit Suspension or Revocation. The Department or the Board may suspend or revoke a permit or license if the Department determines that any of the following have occurred:</text>
          <paragraph num="(a)">
            <text>A violation of the provisions of Environment Article, §§16-101—16-503, Annotated Code of Maryland, this subtitle, or COMAR 23.02.04;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Failure of a licensee or permittee to comply with the requirements of an administrative action or order under this subtitle;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Requirements and conditions of the license or permit have been violated;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Misrepresentation in the license or permit application process or failure to disclose a relevant or material fact has occurred;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>There has been a substantial deviation from the plans, specifications, or requirements of the license or permit;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>The licensee or permittee has prevented a representative of the Department from entering the site to make reasonable inspections;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>The licensee or permittee's rights under the license or permit have not been vested and new information, changes in site conditions, or amended regulatory requirements necessitate revocation; or</text>
          </paragraph>
          <paragraph num="(h)">
            <text>The licensee or permittee has failed to post or maintain financial assurances required under COMAR 26.24.05.02.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Notice. Except for emergency actions under §H of this regulation, a tidal wetlands license or permit may not be suspended, modified, or revoked unless the Department or the Board first gives the permittee or licensee written notice by certified mail of the specific facts that warrant suspension or revocation.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Hearings.</text>
          <paragraph num="(a)">
            <text>Upon receipt of written notice to suspend, modify, or revoke a permit, the permittee or surety has 10 calendar days to request a contested case hearing.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A hearing under this subsection shall be conducted in conformance with State Government Article, Title 10, Subtitle 2, Annotated Code of Maryland, and COMAR 08.01.04.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>An appeal from a license suspension or revocation shall be in accordance with COMAR 23.02.04.</text>
          </paragraph>
          <paragraph num="(d)">
            <text>If the Department does not receive a request for a hearing, the permit shall be suspended, modified, or revoked, and the right to appeal shall be waived.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Bond Forfeiture. If the Department finally determines that a permit shall be revoked, the Department may immediately forfeit the bond and notify the permittee and surety in writing. An appeal of the final decision to forfeit a bond shall be to the circuit court.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Service.</text>
        <paragraph num="(1)">
          <text>A complaint, order, or other administrative notice issued by the Department may be served on a violator personally or by certified mail to the violator's last known address.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An order issued under this regulation is effective immediately.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>Hearings.</text>
        <paragraph num="(1)">
          <text>The Department shall hold a hearing under this regulation in conformance with State Government Article, Title 10, Subtitle 2, Annotated Code of Maryland, and COMAR 08.01.04.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Within 10 calendar days of service of a written complaint under this regulation, a violator may request a hearing in writing.</text>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Emergency Action.</text>
        <paragraph num="(1)">
          <text>License Recommendations. The Department may recommend that the Board take action to immediately suspend a license if the Department:</text>
          <paragraph num="(a)">
            <text>Finds that the public health, safety, or welfare imperatively requires immediate suspension; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Promptly gives the licensee written notice of the recommendation which shall include:</text>
            <paragraph num="(i)">
              <text>Specific facts upon which the immediate suspension is based, and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The licensee's opportunity to appeal in accordance with COMAR 23.02.04.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Permit Actions.</text>
          <paragraph num="(a)">
            <text>The Department may order an immediate suspension of a permit if the Department:</text>
            <paragraph num="(i)">
              <text>Finds that the public health, safety, or welfare imperatively requires the immediate suspension; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Promptly gives the permittee written notice of the suspension.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>A notice of immediate suspension shall include a statement of:</text>
            <paragraph num="(i)">
              <text>Specific facts on which the immediate suspension is based; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The permittee's opportunity to be heard in accordance with §D of this regulation.</text>
            </paragraph>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="Waivers.">
      <paragraph num="A.">
        <text>If the Department determines, from the information submitted with an application for a private wetlands permit, that a waiver of a regulation of this subtitle is in the public interest, the Department may grant relief from the requirement upon request.</text>
      </paragraph>
      <paragraph num="B.">
        <text>If a waiver results in the loss of tidal wetlands, the applicant is required to mitigate for that loss in accordance with COMAR 26.24.05.01.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, Title 16, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: February 14, 1994 (21:3 Md. R. 184)</annotation>
      <annotation type="History" subtype="Administrative History">(Wetlands regulations before February 14, 1994, appeared under COMAR 08.05.07)</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .01—.07 were recodified from Regulations .01, .02, .13, .24, .25, .27, and .28, respectively, under COMAR 08.05.05 Tidal Wetlands, June 1996</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02B amended as an emergency provision effective March 9, 2007 (34:7 Md. R. 695); emergency expired September 5, 2007</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .02B amended effective February 4, 2013 (40:2 Md. R. 73)</annotation>
    </annotations>
  </chapter>
  <chapter num="02" heading="Permits and Licenses">
    <regulation prefix="Regulation" num=".01" heading="General Requirements for a State Tidal Wetlands License or Private Tidal Wetlands Permit.">
      <paragraph num="A.">
        <text>License or Permit Required. Except as set forth in §C of this regulation, before beginning any work, a person who proposes to construct or reconstruct structures, or to dredge or fill a State or private tidal wetland, shall obtain a:</text>
        <paragraph num="(1)">
          <text>License from the Board; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>License, general license, general permit, or permit from the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Uses and Activities Prohibited on State or Private Tidal Wetlands Without a License or Permit. Except when authorized, a person may not:</text>
        <paragraph num="(1)">
          <text>Fill, place, dump, or discharge on tidal wetlands any:</text>
          <paragraph num="(a)">
            <text>Loam, peat, sand, gravel, soil, or other similar substance, or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Trash, garbage, debris, junk, or other polluting substance;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Drain, excavate, or dredge the tidal wetlands encompassed by this subtitle, or remove from the tidal wetlands loam, peat, sand, gravel, soil, or other similar substance;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Construct any structure in, on, over, or under tidal wetlands; or</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Perform an act or use involving tidal wetlands in a manner which would destroy the natural vegetation or existing patterns of tidal flow, or alter the natural and beneficial character of the tidal wetland.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Exemptions from a State Tidal Wetlands License and a Private Tidal Wetlands Permit. The following activities are exempted from the requirement to obtain a license from the Board or a license, general license, general permit, or permit from the Department under this subtitle:</text>
        <paragraph num="(1)">
          <text>Dredging of seafood products by any licensed operator including normal leased bottom activities permitted under Natural Resources Article, Title 4, Subtitle 11, Annotated Code of Maryland, and COMAR 08.02.08.12, or the harvesting of submerged aquatic vegetation provided the root system is not affected;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Trapping, hunting, fishing, and catching shellfish, if legally permitted;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Mosquito control and abatement projects as approved by the Department of Agriculture;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Improvement of agricultural drainage ditches as approved by the Department of Agriculture;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Routine maintenance, repair, or replacement of a highway structure, pier, boathouse, a structure on a pier, bulkhead, revetment, tidal impoundment dike, water control structure, aboveground transmission facility, agricultural drainage ditch, or highway drainage ditch when the existing structure is functional and there is no increase in the original length, width, height, or channelward encroachment;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Channel and harbor navigation aids, if approval has been granted by the United States Coast Guard;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Private piers that meet the criteria in COMAR 26.24.04.02;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Control of exotic plant species such as Phragmites australis, if a toxic materials permit under COMAR 26.08.03.02 is obtained;</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Temporary installation of bass spawning boxes from March 1 through June 15 annually outside of marked navigation channels.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Application Requirements.">
      <paragraph num="A.">
        <text>Who May Apply. An applicant for a license or permit is a person:</text>
        <paragraph num="(1)">
          <text>With a riparian interest in private tidal wetlands or upland adjacent to State tidal wetlands, or an agent designated by the person with riparian interest; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Seeking approval for navigation, mining, aquaculture, archeology, or similar projects in tidal wetlands.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Application Form.</text>
        <paragraph num="(1)">
          <text>The application form shall be a joint federal and State application for the regulation of activities in tidal wetlands in Maryland.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An applicant for a tidal wetlands license or permit shall submit all of the information required by the Department in a manner and form acceptable to the Department before final action on the application is taken.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>For additional information requirements for specific project types, see COMAR 26.24.03 and 26.24.04.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The application form is available at the following government agencies:</text>
          <paragraph num="(a)">
            <text>Department of the Environment;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>U. S. Army Corps of Engineers, Baltimore District;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>An agency designated by each county or municipality; or</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Department of the Environment, Water Management Administration.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>The person who signs an application form shall be:</text>
          <paragraph num="(a)">
            <text>An individual or an individual's authorized agent;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>An officer or authorized agent of a corporation;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>An authorized official of a State or local government; or</text>
          </paragraph>
          <paragraph num="(d)">
            <text>An authorized member of an association or partnership.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>The person who signs an application is responsible for the truth, accuracy, and completeness of all information in the application.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>The Department shall acknowledge receipt of an application in writing by regular mail, and shall advise the applicant of the public notice requirements under COMAR 26.24.01.04.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The Department shall review an application to determine whether it is complete for processing. An application is complete if it contains all the information required in this subtitle. The Department shall notify an applicant within 45 days by telephone or in writing of the additional information required in an incomplete application. If the Department fails to notify an applicant within 45 days, an application is considered complete. The Department may require additional information from an applicant as a result of the administrative review process.</text>
      </paragraph>
      <paragraph num="E.">
        <text>For purposes of an application, mean high water and mean low water are:</text>
        <paragraph num="(1)">
          <text>Referenced in feet to a benchmark elevation based upon:</text>
          <paragraph num="(a)">
            <text>The National Geodetic Vertical Datum of 1929 (NGVD) which is incorporated by reference under 41 FR 20202 (1976);</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The North American Vertical Datum of 1988 (NAVD) which is incorporated by reference under 48 FR 50784 (1983); or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A benchmark established and documented by an applicant and approved by the Department;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Determined using one of the following methods:</text>
          <paragraph num="(a)">
            <text>Control tide station data as published by the U. S. Department of Commerce, National Oceanic and Atmospheric Administration;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Derivation of the equivalent high water datum using a comparison of observational records with control tide station data as published by the U. S. Department of Commerce, National Oceanic and Atmospheric Administration; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>An evaluation of the project site conditions based upon the following parameters:</text>
            <paragraph num="(i)">
              <text>Predicted tide range elevations,</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Meteorologic conditions,</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Vegetation and other biological factors at the site including barnacles and algae lines, and</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Physical indicators at the site such as rack lines, stain marks on nearby structures, and beach particle sorting.</text>
            </paragraph>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>The Department may require an applicant to engage a professional engineer, licensed under Maryland law, to certify that the design meets all of the requirements of the Department. This requirement may apply to projects including:</text>
        <paragraph num="(1)">
          <text>Shore erosion control structures; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Dredge material placement sites.</text>
        </paragraph>
      </paragraph>
      <paragraph num="G.">
        <text>The Department may require project plans to include a bathymetric survey that is referenced to a benchmark based on the NGVD of 1929 or NAVD of 1988, or a benchmark established and documented by an applicant and approved by the Department. All survey and topographic information shall be referenced to 0.0 mean low water.</text>
      </paragraph>
      <paragraph num="H.">
        <text>Other Approvals.</text>
        <paragraph num="(1)">
          <text>The Department may suspend processing of an application for a structure or activity if the application is inconsistent with State, federal, or local land use requirements, including federal tidal wetlands authorizations under §404 of the Clean Water Act of 1992 and §10 of the Rivers and Harbors Act of 1899, critical area, zoning, special exception, variance, or conditional use approvals. The Department will make these consistency determinations in cooperation with the appropriate State, federal, and local regulatory agencies. Project approval under this subtitle does not relieve a licensee or permittee of the need to obtain other approvals that may be required.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A person shall obtain a permit to engage in aquaculture activities under COMAR 08.02.14 before the Department will accept an application for construction of an aquaculture facility in tidal wetlands.</text>
        </paragraph>
      </paragraph>
      <paragraph num="I.">
        <text>An applicant shall allow reasonable access for inspection of the project site by representatives of the Department.</text>
      </paragraph>
      <paragraph num="J.">
        <text>An applicant may request in writing, at the time an application is submitted or as soon as possible, that certain information submitted as part of an application not be disclosed. The Department shall determine if the information is confidential under State Government Article, Title 10, Subtitle 6, Annotated Code of Maryland, and other applicable law. If the Department denies a request for nondisclosure, an applicant may withdraw the application or appeal the Department's determination under applicable law. If an applicant withdraws an application, the Department shall, at the request of the applicant, return any documents claimed to be confidential.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Criteria for Evaluating Tidal Wetlands License or Permit Applications.">
      <paragraph num="A.">
        <text>Evaluation Criteria.</text>
        <paragraph num="(1)">
          <text>The criteria in this regulation are presented to assist in preparing an application and to provide a consistent basis for recommendations and decisions for licenses or permits.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>As the basis for a recommendation or final decision, including approval, denial, suspension, or modification of a license or permit, the Department shall take into account ecological, economic, developmental, recreational, and aesthetic values of tidal wetlands in order to preserve tidal wetlands and prevent their despoliation and loss.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>When reviewing an application for a license, the Department considers the proprietary interests of the Board over State tidal wetlands.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Application Evaluation. In evaluating an application, the Department shall consider the degree to which:</text>
        <paragraph num="(1)">
          <text>Dredging and filling activities can be avoided or minimized;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The proposed activity is water-dependent;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The proposed activity will alter or destroy tidal wetlands, including a determination of how the proposed project will:</text>
          <paragraph num="(a)">
            <text>Destroy or adversely affect the value of the tidal wetlands as a source of nutrients or habitat for finfish, crustaceans, mollusks, or wildlife of significant economic or ecologic value,</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Affect potential habitat areas such as historic spawning and nursery grounds for anadromous and semianadromous fisheries species and shallow water areas suitable to support populations of submerged aquatic vegetation,</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Eliminate or substantially reduce marine commerce, recreation, and aesthetic enjoyment,</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Affect the natural ability of tidal wetlands to reduce flood damage and adversely affect the public health and welfare, and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Substantially reduce the capacity of tidal wetlands to trap sediment, and result in increased silting of channel and harbor areas to the detriment of free navigation;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>The proposed activity would alter natural water flow, water temperature, water quality, and natural tidal circulation regimes;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The proposed activity would alter littoral drift;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>The proposed activity enhances the aquatic environment;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>The proposed activity would impact local, regional, and State economic conditions;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>The proposed activity is consistent with State, federal, and local land use plans and laws, including Critical Area laws;</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Alternatives for the disposal of dredged material have been explored;</text>
        </paragraph>
        <paragraph num="(10)">
          <text>The natural, scenic, historic property, and aesthetic values can be retained or enhanced;</text>
        </paragraph>
        <paragraph num="(11)">
          <text>The proposed activity provides facilities for the proper handling of storm water runoff and sanitary wastes;</text>
        </paragraph>
        <paragraph num="(12)">
          <text>Danger may arise because of the location of proposed structures from hurricanes, floods, sea level rise, or other determinable and periodically recurring natural hazards;</text>
        </paragraph>
        <paragraph num="(13)">
          <text>Navigational safety is affected;</text>
        </paragraph>
        <paragraph num="(14)">
          <text>The activity benefits the public, if applicable;</text>
        </paragraph>
        <paragraph num="(15)">
          <text>Shore erosion is controlled;</text>
        </paragraph>
        <paragraph num="(16)">
          <text>Maintenance and operation of the proposed project is assured;</text>
        </paragraph>
        <paragraph num="(17)">
          <text>Recreational and navigational access to beaches and waters of the State is provided;</text>
        </paragraph>
        <paragraph num="(18)">
          <text>The proposed activity would alter the scenic and wild qualities of a designated State scenic and wild river; and</text>
        </paragraph>
        <paragraph num="(19)">
          <text>The proposed activity would impact historic waterfowl staging areas and colonial bird-nesting sites.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="General Tidal Wetlands License.">
      <paragraph num="A.">
        <text>The Board shall issue a general wetlands license for those activities proposed in State tidal wetlands listed in §B of this regulation. A person proposing an activity in State tidal wetlands under the general wetlands license shall apply to the Department. The Department shall consider the ecological, economic, developmental, recreational, and aesthetic values of the proposed project and determine if the proposed project qualifies under the general wetlands license. If a project qualifies for a general wetlands license and does not require mitigation under COMAR 26.24.05.01, the Department may issue the authorization directly to the applicant.</text>
      </paragraph>
      <paragraph num="B.">
        <text>General Wetlands License Projects. Projects which qualify for approval under the general license include projects to:</text>
        <paragraph num="(1)">
          <text>Add stone or broken concrete to a revetment or channelward of a bulkhead if the stone or broken concrete extends not more than 10 feet channelward of the existing structure;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Emplace a revetment for shore erosion control only if it is less than 500 feet in length and it is aligned not more than 10 feet channelward of the mean high water line;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Fill near shore shallow water not more than 35 feet channelward of the mean high water line only if the fill area is less than 500 feet in length and parallel to the upland for the purpose of shore erosion control by tidal vegetated wetland creation;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Maintenance dredge a mooring, boat ramp, or travel lift slip with an area of 1,500 square feet or less and remove 100 cubic yards or less of material, if the licensee complies with the water quality certification required under COMAR 26.08.02;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Reconfigure an existing marina if there is no dredging or no increase in channelward encroachment beyond existing piers and associated structures;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Construct a boat ramp not more than 12 feet wide and 30 feet channelward of the mean high water line;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Armor or strengthen bridges or causeways when the activity extends not more than 10 feet from the existing structure, requires no dredging, and does not impede the flow of the waterway;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Create a new discharge of storm water runoff within 1,000 feet landward of the tidal wetlands boundary, if the drainage system directly discharges to tidal waters and employs stormwater control measures to manage runoff for rate and water quality according to State and local standards which include measures:</text>
          <paragraph num="(a)">
            <text>Designed to control erosive velocities to tidal waters of wetlands, and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Required under COMAR 27.01.01 and 27.02.01 and a State-approved critical area program of a local jurisdiction;;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(9)">
          <text>Clear debris and windfalls from shorelines without dredging State tidal wetlands;</text>
        </paragraph>
        <paragraph num="(10)">
          <text>Install temporary monitoring or research devices; and</text>
        </paragraph>
        <paragraph num="(11)">
          <text>Construct a replacement bulkhead within a maximum of 18 inches channelward of a functional bulkhead.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Term of License. An authorization under a general license expires 3 years after the date of issuance. If the construction or the activity authorized under this general license is not completed within 3 years, a license extension may not be granted by the Department and the licensee shall apply for a new license.</text>
      </paragraph>
      <paragraph num="D.">
        <text>General License Conditions. To obtain authorization under the general license to be valid, an applicant shall:</text>
        <paragraph num="(1)">
          <text>Obtain all required federal, State, county, or local approvals before beginning work on a licensed activity;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>When applicable, obtain an approved sediment and erosion control plan from the local soil conservation district before construction;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Notify the Enforcement Division of the Water Management Administration at least 5 days before beginning work;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Allow representatives of the Department to enter the property at reasonable times to inspect the ongoing or completed work under the license; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Design and construct the authorized work in a manner which minimizes adverse impacts on natural resource values, including water quality, plants, wildlife, and plant and wildlife habitat.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="General Tidal Wetlands Permit.">
      <paragraph num="A.">
        <text>The Department shall issue a general wetlands permit to the Administration for those activities in private wetlands listed in §B of this regulation. A person proposing an activity in private tidal wetlands under the general wetlands permit shall apply to the Administration. The Administration shall consider the ecological, economic, developmental, recreational, and aesthetic values of the proposed project and determine if the project proposed in the application qualifies under the general wetlands permit. If a project qualifies under the general wetlands permit and does not require mitigation under COMAR 26.24.05.01, the Administration may issue the authorization directly to the applicant.</text>
      </paragraph>
      <paragraph num="B.">
        <text>General Wetlands Permit Projects. Projects which qualify for approval under the general permit include projects described in Regulation .04 of this chapter and projects to:</text>
        <paragraph num="(1)">
          <text>Install or maintain underground utilities such as phone, cable television, electricity, or natural gas pipelines not exceeding 12 inches in diameter if the surface of the wetlands is restored to its original elevation and vegetation;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Conserve soil, vegetation, water, fish, shellfish, and wildlife using best management practices; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Improve wildlife habitat as approved by the Administration.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Term of Permit. An authorization under the general permit expires 3 years after the date of issuance. If the construction or activity is not completed within 3 years, the Department may not grant an extension and the permittee shall reapply for authorization.</text>
      </paragraph>
      <paragraph num="D.">
        <text>General Permit Conditions. In order for an authorization under this general permit to be valid, the applicant shall meet the requirements under Regulation .04D of this chapter.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Conditions of a License or Permit.">
      <paragraph num="A.">
        <text>License Conditions. Standard conditions of a tidal wetlands license shall be imposed by the Board in accordance with COMAR 23.02.04.13.</text>
      </paragraph>
      <paragraph num="B.">
        <text>The Department may recommend that the Board include special conditions, including requirements for maintenance dredging, mitigation, compensation, and financial assurances, in accordance with COMAR 23.02.04.14. The Department shall use the guidelines in §§C—L of this regulation in recommending conditions to the Board.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The licensee shall submit a construction schedule to the Department 10 days before the beginning of construction.</text>
      </paragraph>
      <paragraph num="D.">
        <text>The use of construction equipment or other temporary structural barriers may not decrease the width of the navigable waterway by more than 50 percent during construction, unless approved by the Department.</text>
      </paragraph>
      <paragraph num="E.">
        <text>The Department may prohibit dredging during certain times to protect shellfish. The Department may determine time restrictions in accordance with the following:</text>
        <paragraph num="(1)">
          <text>Factors including the type of project, nature of the bottom substrate, location, and other physical site characteristics of the site;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Mechanical dredging within 500 yards of shellfish areas is prohibited from December 16 through March 14, and June 1 through September 30; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Hydraulic dredging within 500 yards of shellfish areas is prohibited from June 1 through September 30.</text>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Dredge restrictions in other identified shellfish areas shall be determined on a case-by-case basis by the Department.</text>
      </paragraph>
      <paragraph num="G.">
        <text>Dredging may be prohibited during certain periods by the Department to protect identified finfish-spawning and nursery areas. The Department shall determine dredging time restrictions in accordance with the following:</text>
        <paragraph num="(1)">
          <text>Restrictions during the nursery period of finfish species shall be determined by the Department using factors including target species, type of project, location, and other physical site characteristics;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Dredging is prohibited from:</text>
          <paragraph num="(a)">
            <text>February 15 through June 15 in areas where yellow perch have been documented to spawn, and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>March 1 through June 15 in areas where other important finfish species identified by the Department have been documented to spawn.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Dredging is prohibited within 500 yards of SAV from April 15 through October 15.</text>
      </paragraph>
      <paragraph num="I.">
        <text>Detailed final project plans and specifications shall be submitted to and approved by the Administration before the project begins.</text>
      </paragraph>
      <paragraph num="J.">
        <text>The Department may prohibit the construction of structures on, in, or over shore erosion control structures unless specifically licensed by the Board of Public Works.</text>
      </paragraph>
      <paragraph num="K.">
        <text>Other specific conditions may be recommended by the Department on a case-by-case basis.</text>
      </paragraph>
      <paragraph num="L.">
        <text>Permit Conditions.</text>
        <paragraph num="(1)">
          <text>Standard conditions of a private permit shall be imposed by the Department, which at a minimum address the following:</text>
          <paragraph num="(a)">
            <text>Protection of property rights;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Construction time period;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Term of permit;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Compliance with plans and specifications;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Maintenance of permitted project;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Protection and management of natural resources;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Use of navigable waters; and</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Other approvals required.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The Department may include special conditions such as requirements for maintenance dredging, mitigation, financial assurances, or other approvals. The Department shall use the guidelines in §B of this regulation in establishing special conditions.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".07" heading="License or Permit Modifications or Extensions.">
      <paragraph num="A.">
        <text>Requests for License or Permit Modifications.</text>
        <paragraph num="(1)">
          <text>Upon written request for a license or permit modification, the Department shall determine if the modification is major or minor.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Minor modifications to a license may be recommended to the Board or made to a permit by the Department if the modification involves:</text>
          <paragraph num="(a)">
            <text>A change in land ownership;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A reduction in the scope of the originally authorized work;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Revisions to the project plans or specifications that would otherwise be approved; or</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Structures, activities, or the conditions of a license or permit which require modification to correct adverse environmental impacts.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Major modifications to a license or permit require a new application as described in Regulation .02 of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Requests for Construction Period Extensions.</text>
        <paragraph num="(1)">
          <text>The Department may not extend the construction period for maintenance dredging projects.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The construction period of a tidal wetlands license or permit may be extended for a valid reason. Only one extension for construction authorized under a license or permit may be granted. An extension shall be for a period up to 3 years. A request for extension shall be made in writing to the Department and shall include the following:</text>
          <paragraph num="(a)">
            <text>The reason the project could not be completed within the construction period in the original license or permit;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Revised schedule for start and completion of construction;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Assurances that all other State, federal, and local approvals have not expired or have been authorized;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Evidence of a substantial effort made to construct the authorized works within the construction period specified in the license or permit;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Evidence that the project is to be constructed in phases over a number of years; or</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Evidence of undue hardship due to circumstances beyond the applicant's control.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Requests for Reinstatements. A wetlands license or permit that has expired may not be reinstated and requires a new application as described in Regulation .02 of this chapter.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Modifications. If the Department determines that a modification to a project is necessary, the Department may revise a permit or request a revision of the license by the Board. If conditions are revealed which will not permit safe construction, the license or permit may be suspended or revoked in accordance with COMAR 26.24.01.06.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".08" heading="Appeals.">
      <paragraph num="A.">
        <text>License Decisions. A party aggrieved by a decision of the Board may petition the circuit court in the county where the land is located within 30 days after receiving the decision. An aggrieved party's impacted interests shall be specific and different from the interests of the public, and the right to an appeal is limited by law to aggrieved parties.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Permit Decisions.</text>
        <paragraph num="(1)">
          <text>An applicant who is adversely affected by a decision of denial, suspension, revocation, or condition of a permit by the Department may, within 30 days of receipt of the administrative action, file with the Director written exceptions and a request to present oral argument. After considering the written exceptions, the Director may hear argument and shall issue a written final decision.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The applicant, the county, or the municipal government where the land is located may appeal the final decision of the Director to the circuit court in the county where the land is located within 30 days of the final decision.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>An applicant may not reapply for a permit under this subtitle until after the expiration of 18 months from the date of the denial, or the final determination of an appeal from the denial.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, Title 16, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: February 14, 1994 (21:3 Md. R. 184)</annotation>
      <annotation type="History" subtype="Administrative History">(Wetlands regulations before February 14, 1994, appeared under COMAR 08.05.07)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .18B amended as an emergency provision effective August 1, 1995 (22:17 Md. R. 1309); amended permanently effective December 4, 1995 (22:24 Md. R. 1894)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .19A amended as an emergency provision effective August 1, 1995 (22:17 Md. R. 1309); amended permanently effective December 4, 1995 (22:24 Md. R. 1894)</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .01—.08 were recodified from Regulations .03—.05, .18—.20, .23, and .26, respectively, under COMAR 08.05.05 Tidal Wetlands, June 1996</annotation>
    </annotations>
  </chapter>
  <chapter num="03" heading="Dredging and Filling">
    <regulation prefix="Regulation" num=".01" heading="Maintenance Dredging.">
      <paragraph num="A.">
        <text>In addition to the requirements of COMAR 26.24.02.02, an applicant proposing to maintenance dredge, or to dredge to maintain an existing use, in State or private tidal wetlands shall submit the following information at the time of application:</text>
        <paragraph num="(1)">
          <text>A plan depicting the dimensions, including the existing and proposed depths and location of the main channel and all the spur channels proposed to be dredged;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Quantity of material to be dredged;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Documentation detailing when the site was last dredged and the dimensions of the channel, if applicable;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Evidence of historical boat use since January 1, 1972;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Texture characterization of material to be dredged; and</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Dredge material placement information in accordance with Regulation .03 or .05 of this chapter;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Except for emergency dredging projects as determined by the Department, a map depicting:</text>
          <paragraph num="(a)">
            <text>Current submerged aquatic vegetation populations within the area to be dredged, and a 500-yard buffer, if appropriate;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Date of the submerged aquatic vegetation survey;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Method of sampling; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(8)">
          <text>Justification for classifying the proposed maintenance dredging as an emergency.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The Department may recommend that a wetland license contain a condition to allow for periodic maintenance dredging of quantities less than 500 cubic yards.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Dredging — General.">
      <paragraph num="A.">
        <text>Required Information. In addition to the requirements of Regulations .03 and .05 of this chapter and COMAR 26.24.02.02, an applicant proposing to perform dredging in State or private tidal wetlands that have never been dredged shall submit the following information at the time of application:</text>
        <paragraph num="(1)">
          <text>A description of the purpose for the dredging and a discussion of alternatives considered, including an evaluation of the no action alternative;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A plan of the proposed project, showing the:</text>
          <paragraph num="(a)">
            <text>Extent of the area to be dredged;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Existing and proposed depths;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Volume of material to be removed;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Extent of tidal wetlands to be impacted; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Identification of a dredged material disposal site;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>The method of dredging and anticipated work schedule; and</text>
        </paragraph>
        <paragraph num="(4)">
          <text>A map depicting current submerged aquatic vegetation populations within and adjacent to the area to be dredged, date of the submerged aquatic vegetation survey, and the method of sampling.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Additional Information Requirements.</text>
        <paragraph num="(1)">
          <text>Based on project size and scope, environmental sensitivity of the project site, and potential adverse impacts to tidal wetlands, the Department may, with notice to the applicant by telephone, letter, or meeting, require information in addition to that in §A of this regulation. The Department recommends that an applicant consult with the Department before developing and submitting the information listed in §B(2)—(5) of this regulation.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A description of the predicted short-term and long-term impacts of dredging activities on water circulation, water quality, tidal wetland values, and aquatic biota may be required.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Bathymetric Survey.</text>
          <paragraph num="(a)">
            <text>A bathymetric survey of existing depths may be required.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The survey shall reflect current conditions in the area to be dredged and shall be dated.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The survey shall relate to mean low water (MLW) as 0.0 and be referenced to a recoverable vertical bench mark. Soundings may be poled or recorded by fathometer and shall be taken to an accuracy of 0.5 foot unless otherwise specified by the Department. The survey shall clearly identify low point elevations and shall extend 100 feet beyond the limits of the project or to the controlling depth contour in the adjoining waterway, whichever boundary leads to the larger survey area.</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Survey data shall be plotted on a grid at a minimum scale of 1 inch equals 100 feet with 1-foot contour intervals and spot elevations at a minimum of every 25 feet unless otherwise specified by the Department. The survey shall be referenced to two recoverable horizontal control points.</text>
          </paragraph>
          <paragraph num="(e)">
            <text>A bathymetric survey of the project area upon completion of the authorized dredging may be required.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>A plan drawing may be required that includes property lines and their bearings, bathymetric survey data, the proposed alignment and bearing of navigation channels or permanent structures that extend into State waters, and horizontal and vertical control points. The plan shall be certified by a registered professional engineer or registered land surveyor unless otherwise specified by the Department.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Provisions for monitoring and enhancing water quality may be required in accordance with applicable water quality standards established by the Department.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Design Guideline Requirements.</text>
        <paragraph num="(1)">
          <text>Dredging of channels, canals, and boat basins shall be designed to provide:</text>
          <paragraph num="(a)">
            <text>Adequate flushing and elimination of stagnant water pockets; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A demonstrated public benefit.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Navigational access projects shall when possible be designed to use piers to reach deep waters rather than to use dredging.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Navigational access channels to serve individual or small groups of riparian landowners shall be designed to prevent unnecessary channels. A central access channel with short spur channels shall be considered over separate access channels for each landowner.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Navigational access channels shall be designed to minimize alteration of State or private tidal wetlands. The channel shall provide a minimum width, length, and depth consistent with historic boating use or access.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The channel alignment shall make maximum use of natural or existing channels and bottom contours.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>The alignment of the channel shall first avoid and then minimize impacts to shellfish beds, submerged aquatic vegetation, and vegetated tidal wetlands. When feasible, the alignment shall be located the maximum distance feasible from shellfish beds, submerged aquatic vegetation, and other vegetated tidal wetlands.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>New Channels.</text>
          <paragraph num="(a)">
            <text>Channels through uplands, canals, or basins connecting to State waters for navigational access shall be considered only when the:</text>
            <paragraph num="(i)">
              <text>Applicant is a riparian landowner who demonstrates a need for access to State waters;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Proposed channel represents the smallest dimensions necessary to connect a basin created from upland, or is a public boat ramp to navigable waters if all other requirements of this subtitle are met; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Proposal is the best alternative means of providing reasonable access to navigable waters or no other alternative location exists that would cause less destruction or alteration of tidal wetlands.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>New channels shall be designed to comply with Maryland water quality standards and to avoid pockets of stagnant water having inadequate tidal flushing. The channel design shall include provisions for adequate water circulation.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Upland excavation that would open to State waters shall be performed in the dry and the banks shall be stabilized through wetland creation or the placement of stone before a connection to tidal waters is made.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(8)">
          <text>Provisions shall be included in the design for protection of the channel or canal banks against erosion by waves and boat wakes.</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Dredging to obtain material for beach nourishment may be approved if an environmental analysis determines there will be no adverse impacts to the environment, and the requirements of Regulation .06 of this chapter are fulfilled.</text>
        </paragraph>
        <paragraph num="(10)">
          <text>Dredging for sand, gravel, or fill material may be approved when an environmental analysis determines that there will be no adverse impact on the environment, and no alternative fill material is available.</text>
        </paragraph>
        <paragraph num="(11)">
          <text>The use of explosives to create waterfowl potholes or to clear drainage blockages may be approved when an environmental analysis determines no significant impact to the surrounding habitat will occur, and when performed by a licensed expert.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Dredging Prohibitions for New Dredging Projects.</text>
        <paragraph num="(1)">
          <text>A person may not dredge for projects that are non-water-dependent.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A person may not dredge by means of a vessel's propeller.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A person may not dredge in shallow water areas 3 feet or less at mean low water unless:</text>
          <paragraph num="(a)">
            <text>Historic boat use since January 1, 1972 is documented by:</text>
            <paragraph num="(i)">
              <text>Photographs showing the presence of a functional pier, boat, or mooring, and a written report from the applicant that describes the types of boats, their draft, and dates of use at the site;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>A navigational chart or a bathymetric survey, certified by a professional engineer or land surveyor licensed under Maryland law, that verifies the water depth;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>National Oceanic and Atmospheric Administration navigation charts;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>State and federal permits and licenses for dredging projects issued since January 1, 1972; or</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Other information considered appropriate by the Department;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>The proposed channel represents the smallest dimensions necessary to connect a basin created from upland, or a public boat ramp to navigable waters if all other requirements of this subtitle are met;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The proposed channel is necessary for construction of shore erosion control projects as described in COMAR 26.24.04.01;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The proposed channel is necessary for construction of navigational improvement projects such as jetties or breakwaters; or</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Otherwise determined by the Department.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Upland Disposal of Dredged Material.">
      <paragraph num="A.">
        <text>Exemptions.</text>
        <paragraph num="(1)">
          <text>Previously Approved Disposal Facility. The requirements of §§B—C of this regulation may be waived for a dredge disposal facility previously approved by the Department if it can be demonstrated that the facility is capable of adequately containing the dredged material. Before authorizing the use of a previously approved upland disposal facility, the Department may require:</text>
          <paragraph num="(a)">
            <text>A written report stating that the facility is capable of accepting the volume of material to be dredged considering freeboard constraints, bulking, and remaining capacity;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>An evaluation regarding the safety and effectiveness of the facility to impound additional dredge material, and stability of outlet structures and embankments; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A currently approved soil conservation district plan.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Landfills. Use of an existing landfill may be approved by the Department, and the requirements of §§B—C of this regulation may be waived, if the licensee submits:</text>
          <paragraph num="(a)">
            <text>Documentation that the landfill proposed to be used is being operated in full compliance with local, State, and federal regulations; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Written approval from the landfill owner, or the owner's legal representative, accepting the quantity and type of material to be dredged.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Nonforested Upland Fields. Use of nonforested upland fields may be approved by the Department, and the requirements of §§B—C of this regulation may be waived, if:</text>
          <paragraph num="(a)">
            <text>The elevation of the dredge material is less than 3 feet in height; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The applicant submits:</text>
            <paragraph num="(i)">
              <text>An approved sediment and erosion control plan from the soil conservation district; and</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Written approval from the property owner, or the owner's legal representative, accepting the quantity and type of material to be dredged.</text>
            </paragraph>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>General Requirements.</text>
        <paragraph num="(1)">
          <text>In addition to the requirements of Regulation .02 of this chapter and COMAR 26.24.02.02, an applicant proposing to dispose of dredged material on upland is required to submit the following information at the time of application:</text>
          <paragraph num="(a)">
            <text>Grain size analysis;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A detailed dredge disposal plan that includes the proposed disposal area and:</text>
            <paragraph num="(i)">
              <text>Property lines;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Existing and proposed topography and bathymetry;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Mean high water line;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Location of all tidal and nontidal wetlands and tributaries within 100 feet of any site disturbance;</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Limits of critical area buffers as defined in COMAR 27.01.09, COMAR 27.02.05, and the State-approved critical area program of a local jurisdiction;</text>
            </paragraph>
            <paragraph num="(vi)">
              <text>Stabilized access to the site;</text>
            </paragraph>
            <paragraph num="(vii)">
              <text>The method of dredge material transport to the disposal site, including the alignment of the pipe or the proposed route and staging areas as appropriate;</text>
            </paragraph>
            <paragraph num="(viii)">
              <text>Spillway location;</text>
            </paragraph>
            <paragraph num="(ix)">
              <text>Sediment and erosion control plan approval by the local soil conservation district; and</text>
            </paragraph>
            <paragraph num="(x)">
              <text>A vicinity map identifying the area to be dredged, and the surrounding land areas and water bodies within 100 feet of any disturbance;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(c)">
            <text>Proof of ownership or right to use the disposal site, including:</text>
            <paragraph num="(i)">
              <text>An executed deed conveying title of the site to the licensee;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>An executed easement;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Written consent of the landowner; or</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>A fully executed option agreement, long-term lease agreement, or contract sale of the site;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(d)">
            <text>Methods to ensure that water discharged from the disposal area does not adversely impact water quality, tidal wetlands, or aquatic habitat;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Methods to protect waters during construction operation and dewatering; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Methods to control or divert runoff and erosion from upland disposal sites.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Based on project size and scope, environmental sensitivity of the project site, potential adverse impacts to the environment, and the welfare and safety of the public, the Department may, with notice to the applicant by telephone, letter, or meeting, request the information in §C(1)—(5) of this regulation, in addition to other requirements of this subtitle. This information is required for all dredging projects proposing to dispose of hydraulically dredged material in a contained placement site. The Department recommends that an applicant consult with the Department before developing and submitting the following information listed in §C(1)—(5) of this regulation:</text>
        <paragraph num="(1)">
          <text>Composition of dredge material;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An analysis of alternative disposal methods, including beneficial uses and site selection;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A geotechnical evaluation or more detailed report prepared in support of the project which:</text>
          <paragraph num="(a)">
            <text>Demonstrates feasibility of the site for the intended use; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Provides geotechnical information regarding on-site soils intended for embankment construction, with the unified soil classification system being used to identify all materials intended for embankment construction,</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Provides geotechnical recommendations regarding the degree of embankment compaction to be achieved, design provisions to address hydrologic conditions at the site, and any other special provisions to address seepage control including the use of impermeable liners;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Identifies the location and results of all soil borings taken along the centerline of the proposed embankment and the area from which embankment material will be obtained, with a sufficient number of soil borings being taken to evaluate material quality and availability.</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Summarizes all geotechnical sampling information shown on the design plans including construction requirements that address unique surface and subsurface conditions of the site; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>References design standards;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>The type and settling characteristics of sediments to be dredged based upon the “Standard Method of Particle Size Analysis of Soils, AASHTO Designation T 88-90”, which is incorporated by reference as found in Standard Specifications for Transportation Materials and Methods of Sampling and Testing, Part II Tests, Fifteenth Edition, American Association of State Highway and Transportation Officials, (1990); and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>A detailed plan including:</text>
          <paragraph num="(a)">
            <text>Notes related to vegetative stabilization, sediment and erosion control, and water quality;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Temporary and permanent vegetative stabilization specifications;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A detailed sequence of construction and operation;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>A water quality monitoring schedule;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Discharge return route to tidewater and outfall protection;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Drainage swales;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Utilities;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Sediment and erosion controls;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Identified ecologic, archaeologic, or historic features;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Limits of disturbance and stockpile areas;</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Cross section, height, and settlement of embankments;</text>
          </paragraph>
          <paragraph num="(l)">
            <text>Stage-storage curves or table;</text>
          </paragraph>
          <paragraph num="(m)">
            <text>Inflow point or points;</text>
          </paragraph>
          <paragraph num="(n)">
            <text>Outlet structures and the barrel location in the embankment;</text>
          </paragraph>
          <paragraph num="(o)">
            <text>Seepage controls;</text>
          </paragraph>
          <paragraph num="(p)">
            <text>Details and dimensions of dewatering structure;</text>
          </paragraph>
          <paragraph num="(q)">
            <text>Barrel type, size, and specifications and methods to obtain watertight joints;</text>
          </paragraph>
          <paragraph num="(r)">
            <text>Signature and seal by a professional engineer licensed to practice in Maryland;</text>
          </paragraph>
          <paragraph num="(s)">
            <text>Location of all subsurface borings;</text>
          </paragraph>
          <paragraph num="(t)">
            <text>Date of plan or plan revision; and</text>
          </paragraph>
          <paragraph num="(u)">
            <text>Soil conservation district approval.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Guidelines for Upland Disposal of Dredged Material.">
      <paragraph num="A.">
        <text>Disposal sites shall be designed to have the least impact on:</text>
        <paragraph num="(1)">
          <text>Public safety;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Adjacent properties; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The environment.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Dredged Material Placement Facilities.</text>
        <paragraph num="(1)">
          <text>Dredged material placement facilities shall be designed with the specifications set forth in §B(2)—(12) of this regulation unless otherwise determined by the Department.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>All plans, reports, and supporting documentation shall be dated, sealed, and signed by a professional engineer licensed to practice in Maryland. All revisions shall be noted on the plans.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Soils shall be classified using the unified soil classification system.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The minimum top width of an embankment is as follows:</text>
          <paragraph num="(a)">
            <text>Less than 5 feet high embankment, top width = 4 feet;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>6—10 feet high, top width = 6 feet; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Greater than 10 feet, top width shall be determined by the engineer approving the design.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>A weir box and antiflotation devices shall have a minimum safety factor of 1.2.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>There shall be a minimum 2-foot freeboard to the settled top of an embankment.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Embankment cross-section side slopes dimensions shall be a minimum of 2 horizontal:1 vertical inside and 3 horizontal:1 vertical outside.</text>
        </paragraph>
        <paragraph num="(8)">
          <text>The placement facility shall have a controlled overflow structure design that removes excess ponded water from the facility and that is capable of completely stopping the flow of any effluent. The weir overflow shall have an adjustable crest elevation to remove surface water while assuring that the effluent is in compliance with water quality requirements under COMAR 26.08.02—.04, as established by the Department.</text>
        </paragraph>
        <paragraph num="(9)">
          <text>The placement shall have a pipe outlet design that:</text>
          <paragraph num="(a)">
            <text>Specifies that the minimum size is 8 inches in diameter;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Includes measures to control scour and erosion;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Provides an outlet channel that withstands the maximum outlet velocity anticipated; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Provides watertight joints.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(10)">
          <text>Size of Disposal Facility.</text>
          <paragraph num="(a)">
            <text>The design of the disposal facility shall address effluent water quality based on surface area, embankment height, settling time, and sediment consolidation. When sizing the facility, allowances shall be incorporated in the design for ponding depth and freeboard requirements.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A stage-storage curve or table is required.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The size of the disposal facility shall be calculated using one of the procedures in §B(10)(d), (e), or (f) of this regulation.</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Formula:</text>
            <paragraph num="(i)">
              <text>V = (Qd)(B), where V equals total disposal volume required in cubic yards, Qd is the quantity of material to be dredged in cubic yards, and B is the bulking (expansion) factor.</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Figure 1 in §B(10)(d)(iii) of this regulation shall be used when selecting a bulking factor for hydraulic dredgings. A bulking factor of 1.4 shall be used for mechanical dredging.</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Figure 1 (Hydraulic Dredged Material Bulking Factors/Percent Passing #200 Sieve).</text>
            </paragraph>
          </paragraph>
          <paragraph num="(e)">
            <text>Size calculations may be made according to the “Confined Disposal of Dredged Material, EM 1110-2-5207, U. S. Army Engineer Waterways Experiment Station, Vicksburg, MS (1987)”, which is incorporated by reference.</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Size calculations may be made according to the “Environmental Effects of Dredging Technical Notes, Confined Disposal Guidance for Small Hydraulic Maintenance Dredging Projects-Design Procedures, EEDP-02-8, U. S. Army Engineer Waterways Experiment Station, Vicksburg, MS (December, 1988)”, which is incorporated by reference.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(11)">
          <text>Soils containing organic matter shall be rejected for use in the embankment of disposal facilities.</text>
        </paragraph>
        <paragraph num="(12)">
          <text>The design of the disposal facility shall include regulating provisions for the flow of dredge material into the basin or increasing the depth of ponded water at the overflow weir if the concentration of suspended solids in the effluent increases above acceptable limits.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Construction Requirements.</text>
        <paragraph num="(1)">
          <text>The Department may require that construction of a disposal facility:</text>
          <paragraph num="(a)">
            <text>Is under the supervision of a professional engineer licensed to practice in Maryland under Business Occupations and Professions Article, Title 14, Subtitle 3, Annotated Code of Maryland; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Meets all provisions of this subtitle.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Materials failing to meet specifications in this subtitle shall be removed.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Design changes shall be reported to the Department for approval in accordance with COMAR 26.24.02.07 before proceeding with construction.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>When construction of a disposal facility is complete, the Department may require submittal of a report that includes:</text>
          <paragraph num="(a)">
            <text>Date, location, and results of all material tests made;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Narrative of construction, including any problems and design changes; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>“As built” plans sealed and signed by a professional engineer licensed to practice in Maryland.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Conditions. Disposal facilities are prohibited in the critical area buffer unless approved in accordance with COMAR 27.01.03.04B, COMAR 27.02.05.04B, and a State-approved critical area program of a local jurisdiction.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".05" heading="Placement of Dredged Material in Open Water.">
      <paragraph num="A.">
        <text>Applicants proposing marsh creation or beach nourishment projects are exempt from the requirements of §B of this regulation.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Overboard Disposal.</text>
        <paragraph num="(1)">
          <text>In addition to the requirements of Regulation .02 of this chapter and COMAR 26.24.02.02, an applicant proposing overboard disposal of dredged material into open water is required to submit the information in §B(2)—(8) of this regulation at the time of application.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An environmental study shall be submitted that includes measures to preserve or enhance the aesthetic, scenic, environmental, and natural resource values of the disposal site.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Test results of the physical and chemical parameters of the material to be dredged shall be submitted. Testing shall include physical characteristics of the material to be dredged, including material identification in accordance with the unified soil classification system and grain-size distribution.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Chemical characteristics, including the concentration of metals, organic compounds, oil and greases, nutrients, bacteria, and toxic compounds and their potential short-term and long-term release into the water column shall be submitted.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>A current bathymetric survey of the site where the proposed dredged material is to be placed, in accordance with the criteria of Regulation .02B(3) of this chapter, shall be submitted. In addition, the survey shall meet the following criteria:</text>
          <paragraph num="(a)">
            <text>Soundings shall be taken in sufficient quantity to clearly identify low point elevations within 500 feet beyond the limits of the proposed project; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Survey data shall be plotted at a scale not less than 1 inch equals 200 feet.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>A plan shall be submitted which depicts the following:</text>
          <paragraph num="(a)">
            <text>Adjacent land features;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Existing navigation channels;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Archaeological sites; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Permanent structures that extend into State waters.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(7)">
          <text>A hydrodynamic study of the impacts of the potential long-term movement of all material placed in tidal waters shall be submitted.</text>
        </paragraph>
        <paragraph num="(8)">
          <text>A monitoring program shall be submitted that includes the collection and analysis of data before, during, and after the disposal operation, including:</text>
          <paragraph num="(a)">
            <text>Aquatic biota, including benthos, shellfish, and finfish;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Water quality parameters, including temperature, salinity, dissolved oxygen, conductivity, and pH;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Turbidity within the disposal site and specified adjacent areas;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Nutrients, including ammonia and phosphate;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>An assessment of volume reductions in the dredged material following placement, including sediment resuspension and transport through tidal and wave current interactions, fluid mud movement, and material consolidation; and</text>
          </paragraph>
          <paragraph num="(f)">
            <text>An assessment of the post-depositional benthos community recolonization.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Beneficial Uses of Dredged Material. Dredged material may be allowed for use in establishing substrate for marsh creation projects and beach nourishment projects, if the following parameters are met:</text>
        <paragraph num="(1)">
          <text>The dredged material is equal to or larger in size than sediments at the placement location, unless measures are taken to control its movement, including:</text>
          <paragraph num="(a)">
            <text>Breakwaters;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Groins; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Other similar structures;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The dredged material is relatively free of organic material; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>It can be documented that the site is properly suited to maintain the sediments placed at the site.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Design Guideline Requirements for Overboard Disposal and Beneficial Use of Dredged Material.</text>
        <paragraph num="(1)">
          <text>Proposed material placement may not cause adverse impacts to existing navigation channels, longshore current patterns, or adjacent properties.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Dredged material may not contain more than 10 percent silts and clays unless measures are taken to control the dredged material's movement as described in §C(1) of this regulation.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Floating debris or other objects shall be prevented from entering tidal waters.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Turbidity shall be minimized during the disposal operation.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Adverse impacts on fish spawning, nursery, and migration patterns shall be prevented.</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Adverse impacts on commercial and sport fishing shall be minimized.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Adverse impacts on vegetated tidal wetlands, submerged aquatic vegetation, charted natural oyster bars, and anadromous fish spawning and nursery grounds shall be minimized.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".06" heading="Filling.">
      <paragraph num="A.">
        <text>In addition to the requirements of COMAR 26.24.02.02, an applicant proposing to fill State or private tidal wetlands for purposes other than shore erosion control as described in COMAR 26.24.04.01 shall submit an 8-1/2-inch by 11-inch site plan drawn to a minimum scale of 1 inch equals 100 feet depicting the following information:</text>
        <paragraph num="(1)">
          <text>Fill location referenced to existing landmarks;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Location of pilings and associated structures;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Existing topography and bathymetry that is referenced to mean low water;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Property lines;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Land use features;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Type of fill;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Surface water bodies including swales;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Location of all tidal and nontidal wetlands;</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Mean high water line;</text>
        </paragraph>
        <paragraph num="(10)">
          <text>Utilities; and</text>
        </paragraph>
        <paragraph num="(11)">
          <text>A vicinity map that identifies the surrounding land areas and water bodies in the vicinity of the project.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Based on project size and scope, environmental sensitivity of the project site, and potential adverse impacts to tidal wetlands, the Department may, with notice to the applicant by telephone, letter, or meeting, require information in addition to that in §A of this regulation. The Department recommends that an applicant consult with the Department before developing and submitting the following information:</text>
        <paragraph num="(1)">
          <text>An alternatives analysis of the proposed project, including the “no action” and other alternatives that avoid and minimize adverse impacts on tidal wetlands, with the analysis including an evaluation of alternatives that have the least impact on public safety, adjoining properties, and the aquatic environment;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>An estimation of the public and private benefits from the project;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Additional site plan information, including;</text>
          <paragraph num="(a)">
            <text>Location of any submerged aquatic vegetation;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Location of shellfish beds;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Limits of critical area buffer as defined in COMAR 27.01.09.01;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Other significant ecological or historical features; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Location of all subsurface borings or other tests associated with any feasibility report prepared for the project;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>Predicted impacts of the fill on tidal wetlands, water quality, and aquatic habitat, including leaching or dispersion of pollutants;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Methods to protect surface water and ground water from pollution;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>A statistical comparison between existing beach sediments and the proposed borrow material for beach nourishment and marsh creation projects;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Storm drain plans, details, and supporting documentation, reports, and design calculations;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Methods to control upland runoff; and</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Methods to ensure that the fill does not adversely affect water quality during and after construction.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Reclamation of Lost Upland. Projects designed to reclaim lost upland by filling shall meet the following requirements:</text>
        <paragraph num="(1)">
          <text>A person who is the owner of land bounding on tidal water is entitled to reclaim upland lost by erosion or avulsion during the person's ownership of the land to the extent of provable boundaries;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The right to reclaim lost upland relates only to upland lost after January 1, 1972; and</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The burden of proof that the loss of upland occurred after January 1, 1972 is the responsibility of the owner of the land, and the riparian property owner may demonstrate the loss of upland through the use of historical photographs and land survey data.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Beach Nourishment. Beach nourishment projects shall meet the following requirements:</text>
        <paragraph num="(1)">
          <text>The fill material grain size shall be equal to or greater in grain size and character to the existing beach material, or determined otherwise to be compatible with existing site conditions and acceptable to the Department;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The fill material shall be relatively free of organic material, floating debris, or other objects;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Silt and clay fills that change the sandy nature of the existing beach materials are not acceptable;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Gravel fill may be acceptable, if particle sizes are equal to or greater than the existing beach materials; and</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Fill material shall be placed above the mean high water line before final grading to achieve the desired beach profile, unless site conditions prohibit the placement of fill material above the mean high water line and specific measures are designed to prevent material from washing away from the site.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Storm Drain Projects.</text>
        <paragraph num="(1)">
          <text>Exemptions. The following storm drain projects are exempt from the design guidelines of §E(2) of this regulation:</text>
          <paragraph num="(a)">
            <text>The extension of storm drains which directly discharge into tidal wetlands through new or replacement shore erosion control structures; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Storm drain projects which manage runoff from an individual lot with one dwelling.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Design Guidelines Requirements.</text>
          <paragraph num="(a)">
            <text>New storm drain systems shall be designed to manage the rate of runoff and improve water quality. At a minimum, a 10 percent improvement in water quality shall be achieved.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Storm drain systems shall:</text>
            <paragraph num="(i)">
              <text>Comply with applicable State or local design standards;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Be designed to follow natural drainage patterns and incorporate swales, filter strips, and sediment traps wherever feasible; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Include measures to prevent scouring from increased water velocities at their outlet.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(c)">
            <text>The licensee or permittee is responsible for the removal of any sediment deposited in the waters of the State as a result of the construction of an approved storm drain system or on-site grading and development activities.</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The licensee or permittee shall submit a preconstruction depth survey of any tidal wetlands within the project vicinity for approval by the Department before construction. The survey shall be referenced to mean low water at a fixed benchmark on the adjoining land, or an adjoining structure such as a bulkhead.</text>
          </paragraph>
          <paragraph num="(e)">
            <text>The licensee or permittee shall submit a post-construction depth survey for review and verification by the Administration at any time after construction has begun, if required by the Administration. The survey shall be referenced to the same benchmark and elevation used for determining preconstruction depths.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, Title 16, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: February 14, 1994 (21:3 Md. R. 184)</annotation>
      <annotation type="History" subtype="Administrative History">(Wetlands regulations before February 14, 1994, appeared under COMAR 08.05.07)</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .01—.06 were recodified from Regulations .06—.11, respectively, under COMAR 08.05.05 Tidal Wetlands, June 1996</annotation>
    </annotations>
  </chapter>
  <chapter num="04" heading="Structures">
    <regulation prefix="Regulation" num=".01" heading="Shore Erosion Control.">
      <paragraph num="A.">
        <text>The Department may not authorize an erosion control project if:</text>
        <paragraph num="(1)">
          <text>There is no evidence of erosion and the applicant is unable to document a claim of erosion;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Existing State or private tidal wetlands are effectively preventing erosion; or</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The proposed project may adversely affect:</text>
          <paragraph num="(a)">
            <text>An adjacent property;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Navigation, and the applicant has not adequately offset these impacts;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Threatened or endangered species, species in need of conservation, or significant historic or archaeological resources; or</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Natural oyster bars or private oyster leases.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>A person proposing a shoreline stabilization measure in State or private tidal wetlands that requires a wetlands license from the Board or a general wetlands license, wetlands permit, or general wetlands permit from the Department shall first consider:</text>
        <paragraph num="(1)">
          <text>No action; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Relocation of structures threatened by erosion.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Except as authorized under §E of this regulation, if the Department is satisfied that neither option listed under §B of this regulation is feasible, the person shall use a nonstructural shoreline stabilization measure.</text>
      </paragraph>
      <paragraph num="D.">
        <text>If a structural component is necessary in order to preserve the natural shore, minimize erosion, and establish aquatic habitat, a nonstructural shoreline stabilization measure may include the use of:</text>
        <paragraph num="(1)">
          <text>A breakwater, sand containment structure, or sill that is acceptable to the Department; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>A beach that is acceptable to the Department, when used for the purpose of habitat enhancement.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>A person may use a structural shoreline stabilization measure:</text>
        <paragraph num="(1)">
          <text>In an area identified as appropriate for structural shoreline stabilization measures by the Department, in coordination with the Maryland Department of Natural Resources, and shown on a map approved by the Department under Regulation .01-1 of this chapter; or</text>
        </paragraph>
        <paragraph num="(2)">
          <text>At a site where the person has obtained a waiver from the Department in accordance with Regulation .01-2 of this chapter by demonstrating to the Department’s satisfaction that a nonstructural shoreline stabilization measure is not feasible.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".01-1" heading="Structural Shoreline Stabilization Maps.">
      <paragraph num="A.">
        <text>The Department shall develop and maintain maps on its website that:</text>
        <paragraph num="(1)">
          <text>Display the areas that are appropriate for structural shoreline stabilization measures; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Are readily available to the public.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>When determining the areas appropriate for structural shoreline stabilization measures, the Department shall consider:</text>
        <paragraph num="(1)">
          <text>The presence or absence of a natural shoreline;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Proximity to channels;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>As determined by the Department based on site conditions, the presence of high energy waves or a severely eroding shore that would render a nonstructural stabilization measure infeasible;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The extent to which a water-dependent facility requires a bulkheaded shoreline for loading and unloading operations, such as the berthing of commercial vessels;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Impacts to rare, threatened and endangered species, and species in need of conservation; and</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Any other site-specific factor, as determined relevant by the Department.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".01-2" heading="Nonstructural Shoreline Stabilization Waiver Process.">
      <paragraph num="A.">
        <text>A person who applies for a waiver from the requirement to construct a nonstructural shoreline stabilization measure under Regulation .01C of this chapter shall:</text>
        <paragraph num="(1)">
          <text>Use the form provided by the Department; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Complete the waiver process before submitting an application to obtain a wetlands license from the Board or a general wetlands license, wetlands permit, or general wetlands permit from the Department under COMAR 26.24.02.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>When evaluating a person’s request for a waiver, the Department shall determine whether the site is suitable to support a nonstructural shoreline stabilization measure by considering:</text>
        <paragraph num="(1)">
          <text>The width of the waterway;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The bottom elevation and slope at mean low water;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The bottom substrate:</text>
        </paragraph>
        <paragraph num="(4)">
          <text>The fetch;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The bank elevation and orientation;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>The degree of erosion;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>The height and regularity of tides;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Any other physical constraints that would impede or prevent successful establishment of a nonstructural shoreline stabilization measure; and</text>
        </paragraph>
        <paragraph num="(9)">
          <text>Any other relevant environmental resources, including a Critical Area buffer and other plant, fish, and wildlife habitat, and the likely adverse or protective impact of a nonstructural shoreline stabilization measure on those resources in comparison to the likely adverse or protective impact of a structural shoreline stabilization measure on those resources.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>A person may obtain a waiver from the requirement to use a nonstructural shoreline stabilization measure if, to the Department's satisfaction, a structural shoreline stabilization measure is the only feasible alternative that will protect and maintain the person’s shoreline.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".01-3" heading="Application Requirements.">
      <paragraph num="A.">
        <text>In addition to the requirements of COMAR 26.24.02.02, a person proposing a shoreline stabilization measure shall submit the following information at the time of application:</text>
        <paragraph num="(1)">
          <text>An 8-1/2 by 11-inch plan, with dimensions, of the proposed project showing:</text>
          <paragraph num="(a)">
            <text>Location;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Land ownership;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Existing and proposed contours;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Existing mean high water line and, if applicable, existing landward boundary of State and private tidal wetlands, each as field-verified by the applicant;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>For a nonstructural shoreline stabilization measure, the proposed mean high water line and the proposed landward boundary of State and private tidal wetlands;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Existing and proposed structures, including:</text>
            <paragraph num="(i)">
              <text>A septic system;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>A utility-related structure;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>A building;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>A road;</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Drainage features; and</text>
            </paragraph>
            <paragraph num="(vi)">
              <text>An equipment storage area;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(g)">
            <text>Adjacent shoreline features;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Best management practices to control any upland runoff which contributes to erosion;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Type of materials to be used in construction; and</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Site bathymetry;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>A waiver, if the project qualifies for a structural shoreline stabilization measure under Regulation .01-2 of this chapter;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Photographs of the project site, the adjoining shoreline, and existing structures;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>In accordance with the requirements of COMAR 27.01.09.01-3, the proposed major or minor buffer management plan that will address disturbance of the buffer, including any disturbance to stabilize a bank or slope or to control erosion above mean high water;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Critical Area Buffer Notification Form signed by the property owner;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>If required by the Department, a design report that includes:</text>
          <paragraph num="(a)">
            <text>A foundation investigation;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A structural analysis;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The structural properties of the materials to be used to construct the proposed project;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The estimated economic, environmental, and other benefits to be derived from the project;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>The design life expectancy of the project;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>The sequence of construction;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>A description of the method of construction that includes:</text>
            <paragraph num="(i)">
              <text>Estimated beginning and completion dates;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The equipment to be used;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>The proposed access to the site;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>The foundation excavations;</text>
            </paragraph>
            <paragraph num="(v)">
              <text>The means for diverting water away from the project during construction; and</text>
            </paragraph>
            <paragraph num="(vi)">
              <text>The means for controlling the dewatering discharges;</text>
            </paragraph>
          </paragraph>
          <paragraph num="(h)">
            <text>Specific references and benchmarks used by the designer;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Estimated impact, if any, of the project on adjacent properties;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>Estimated impact, if any, of the project on public access to the shore;</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Written specifications for the quality of the materials and methods of construction to ensure that design criteria will be met or exceeded;</text>
          </paragraph>
          <paragraph num="(l)">
            <text>A description of how the reclamation of lost upland meets the requirements of COMAR 26.24.03.06C, if applicable; and</text>
          </paragraph>
          <paragraph num="(m)">
            <text>A description of measures to be taken to avoid and minimize impacts to plant, fish, and wildlife habitat before, during, and after construction; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(7)">
          <text>If required by the Department, an alternatives analysis, including:</text>
          <paragraph num="(a)">
            <text>The justification for rejecting the options required to be considered under COMAR 26.24.04.01B;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The justification for the selected shoreline stabilization measure; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>For a structural shoreline stabilization measure, proof of consideration of each alternative, including an analysis of habitat impact for each alternative, in the following order of preference:</text>
            <paragraph num="(i)">
              <text>Beach nourishment;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Breakwater;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Groin, jetty, or a similar structure;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Revetment; and</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Bulkhead.</text>
            </paragraph>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Based on project size and scope, environmental sensitivity of the project site, and potential adverse impacts to State or private tidal wetlands, the Department may, with notice to the applicant by telephone, letter, email, or meeting, require information in addition to §A of this regulation.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".01-4" heading="Design of Structural Shoreline Stabilization Measures.">
      <paragraph num="A.">
        <text>A person proposing a structural shoreline stabilization measure that employs a jetty, groin, breakwater, or other offshore structure, shall design the project to:</text>
        <paragraph num="(1)">
          <text>Allow natural littoral movement of sand along the shore;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Minimize erosion and undesirable shoaling;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Use materials that are:</text>
          <paragraph num="(a)">
            <text>Of adequate size, weight, and strength to function as intended;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Free of protruding objects, debris, and contaminants; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Selected to minimize impacts to water quality and plant, fish, and wildlife habitat;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>Use backfill material free of litter, refuse, junk, metal, tree stumps, logs, or other unsuitable materials;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Prevent damage due to scour; and</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Minimize grading and other impacts on riparian habitat.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>The Department may not authorize encroachment into State or private tidal wetlands unless:</text>
        <paragraph num="(1)">
          <text>The encroachment is limited to that which is structurally necessary and is verified by a design report or other documentation, as required by the Department; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>For a bulkhead:</text>
          <paragraph num="(a)">
            <text>The encroachment is three feet or less beyond the mean high water line; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Other nonstructural and structural shoreline stabilization measures are infeasible, as determined by the Department.</text>
          </paragraph>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Piers and Boathouses.">
      <paragraph num="A.">
        <text>Exemptions. Private noncommercial piers, boat hoists or lifts, mooring piles, and osprey poles that meet all of the following criteria are exempt from the requirement to obtain a license from the Board of Public Works or a license or permit from the Department under this subtitle:</text>
        <paragraph num="(1)">
          <text>Only one pier per property;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The width of the main section of the pier may not be greater than 6 feet;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Fixed or floating platforms, including Ts, Ls, and step-down platforms may not:</text>
          <paragraph num="(a)">
            <text>Exceed 200 square feet in area including the segment of the main pier section to which the platform is attached;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Be located over vegetated tidal wetlands, including submerged aquatic vegetation; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Be constructed on the landward 50 percent of the main pier section, except in canals and similar narrow water bodies as considered appropriate by the Department.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>The project may not include more than six mooring piles or create more than four boat slips;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>The project may not include more than two osprey poles per property;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>A maximum of two, 3-foot wide finger piers not exceeding 50 percent of the proposed slip length may be constructed on the landward side of the end of a private pier;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>The project shall meet the minimum extended property line setback requirements established by the local jurisdiction in which the activity is proposed;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>The project may not be constructed in a location that will impede navigation or block ingress to and egress from adjoining properties;</text>
        </paragraph>
        <paragraph num="(9)">
          <text>The project may not obstruct the flow of the tide;</text>
        </paragraph>
        <paragraph num="(10)">
          <text>The pier may not extend within 100 feet of a ski course approved by the Department;</text>
        </paragraph>
        <paragraph num="(11)">
          <text>The pier may not extend more than 100 feet channelward of the tidal wetlands boundary line, or a distance of 25 percent of the width of the waterway, whichever is less;</text>
        </paragraph>
        <paragraph num="(12)">
          <text>Piers over vegetated tidal wetlands shall be constructed a minimum of 3 feet above the wetlands; and</text>
        </paragraph>
        <paragraph num="(13)">
          <text>The owner or owner's agent shall notify the Department on a form provided by the Department within 10 days before construction of the pier or any auxiliary structure.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>Pier Criteria.</text>
        <paragraph num="(1)">
          <text>The Department may issue, deny, modify, or condition a license in accordance with COMAR 26.24.01.03 for the construction of fixed or floating piers, decks, walkways, and related structures. The Department may not issue a license for a fixed or floating pier, deck, walkway, or related structure which adversely affects shallow water habitat, submerged aquatic vegetation, shellfish, or vegetated tidal wetlands. The Department shall use all the criteria in §B(2)—(4) of this regulation in making final decisions on fixed or floating piers, decks, walkways, or other related structures not exempted in COMAR 26.24.02.01C(7) and §A of this regulation.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Private Noncommercial Piers.</text>
          <paragraph num="(a)">
            <text>The main section of a pier may not be wider than 6 feet.</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A pier shall meet the minimum extended property line set-back requirements established by the local jurisdiction in which the activity is proposed.</text>
          </paragraph>
          <paragraph num="(c)">
            <text>A pier may not:</text>
            <paragraph num="(i)">
              <text>Be constructed in a location that will impede navigation or block ingress and egress to adjoining properties;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Obstruct the flow of the tide;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Extend within 100 feet of a ski course approved by the Department;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Extend more than 25 percent across a waterway unless it is determined by the Department that the pier will not adversely affect navigation, recreation, aesthetics, or the biological character of the area; or</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Include more than six mooring piles, four boat lifts or hoists, or four boat slips.</text>
            </paragraph>
          </paragraph>
          <paragraph num="(d)">
            <text>Piers over vegetated tidal wetlands shall be constructed a minimum of 3 feet above the wetland substrate.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Private, Noncommercial Pier Platforms. The total area of fixed or floating platforms such as Ts and Ls, and step-down platforms:</text>
          <paragraph num="(a)">
            <text>Shall include the segment of the main pier section to which the platform is attached and may not exceed 200 square feet;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>May not be located over vegetated tidal wetlands, including submerged aquatic vegetation; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>May not be constructed on the landward 50 percent of the main pier except in canals and other similar narrow water bodies as deemed appropriate by the Department.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>Private, Noncommercial Finger Piers. Two, 3-foot wide finger piers may be constructed on the landward side of the end of the main pier. Finger piers may be constructed in addition to other fixed or floating platforms and may not be included in calculating the area for purposes of the exemption in §A(3) of this regulation.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Boathouses.</text>
        <paragraph num="(1)">
          <text>Routine repair and maintenance of existing boathouses is exempt under COMAR 26.24.02.01C(5) if there is no increase in width, length, height, or channelward encroachment.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Except at commercial marinas, a person may not construct a new boathouse in or over State or private wetlands.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Appeals. A person aggrieved by a final decision of the Administration may appeal the decision in accordance with COMAR 26.24.02.08.</text>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".03" heading="Marinas.">
      <paragraph num="A.">
        <text>In addition to the requirements of COMAR 26.24.02.02, an applicant for a new marina or marina expansion is required to submit the following information at the time of application:</text>
        <paragraph num="(1)">
          <text>An alternatives analysis, including the alternative of no action, with the potential impacts on water quality, tidal wetland values, and aquatic habitat discussed for each alternative for:</text>
          <paragraph num="(a)">
            <text>Marina location;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Construction methods;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Configuration of project components;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Dimensions; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Related facilities;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>A bathymetric survey of the proposed marina site;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A description of the marina facility, including the number of slips, breakwaters, or jetties;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>A description of:</text>
          <paragraph num="(a)">
            <text>Marina support facilities including:</text>
            <paragraph num="(i)">
              <text>Parking;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Storm water management facilities;</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Concessions;</text>
            </paragraph>
            <paragraph num="(iv)">
              <text>Boat sales;</text>
            </paragraph>
            <paragraph num="(v)">
              <text>Boat repair;</text>
            </paragraph>
            <paragraph num="(vi)">
              <text>Hauling;</text>
            </paragraph>
            <paragraph num="(vii)">
              <text>Dry storage;</text>
            </paragraph>
            <paragraph num="(viii)">
              <text>Sewage pumpout facilities;</text>
            </paragraph>
            <paragraph num="(ix)">
              <text>Utilities;</text>
            </paragraph>
            <paragraph num="(x)">
              <text>Swimming pools;</text>
            </paragraph>
            <paragraph num="(xi)">
              <text>Restaurants; and</text>
            </paragraph>
            <paragraph num="(xii)">
              <text>Lodging facilities; and</text>
            </paragraph>
          </paragraph>
          <paragraph num="(b)">
            <text>Techniques to minimize the adverse environmental impacts of the facilities in §A(4)(a) of this regulation;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>A description of the impact of the marina on State or federal navigation channels located within 3,000 feet of the project;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>A description of the existing site characteristics, including water quality in the project area;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Location of materials such as submerged cables, piles, pipelines, or debris to be removed during construction, as well as measures for disposal;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>Location of boat repair, cleaning, wet and dry storage facilities, fueling facilities, and other boat service facilities;</text>
        </paragraph>
        <paragraph num="(9)">
          <text>The location of the areas in which antifouling compounds for boat bottom painting, waste oil, washwater, and other pollutants are used;</text>
        </paragraph>
        <paragraph num="(10)">
          <text>A description and plan of the method proposed to manage water quality associated with storm water runoff; and</text>
        </paragraph>
        <paragraph num="(11)">
          <text>A flushing study for basins dredged into upland.</text>
        </paragraph>
      </paragraph>
      <paragraph num="B.">
        <text>If the proposed new marina or marina expansion includes dredging and dredge disposal, the information requirements and design guidelines in COMAR 26.24.03.02—.05 shall be met.</text>
      </paragraph>
      <paragraph num="C.">
        <text>Based on project size and scope, environmental sensitivity of the project site, and potential adverse impacts to tidal wetlands, the Department may, with notice to the applicant by telephone, letter, or meeting, require information in addition to §§A and B of this regulation. The Department recommends that an applicant consult with the Department before developing and submitting the following information:</text>
        <paragraph num="(1)">
          <text>The predicted short-term and long-term direct and indirect impacts on water quality, tidal wetland values, and aquatic habitat;</text>
        </paragraph>
        <paragraph num="(2)">
          <text>Increased noise levels, boat wakes, pollutant loading, and other project-related impacts;</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Possible interference with water currents and impacts on littoral drift, sediment deposition, and shoaling;</text>
        </paragraph>
        <paragraph num="(4)">
          <text>Impacts on water circulation and flushing within the project area;</text>
        </paragraph>
        <paragraph num="(5)">
          <text>Other alterations of tidal wetlands and the impact on biological productivity;</text>
        </paragraph>
        <paragraph num="(6)">
          <text>Schedules, monitoring programs, or other provisions to be used during construction, operation, and maintenance to reduce or avoid adverse environmental impacts and to keep erosion, turbidity, and siltation at the lowest possible levels;</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Special provisions to be used to enhance the environment;</text>
        </paragraph>
        <paragraph num="(8)">
          <text>The long-term public gain expected from the project such as:</text>
          <paragraph num="(a)">
            <text>Employment;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Tax yields;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Reduction of existing pollution; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Enhancement of public access to the water;</text>
          </paragraph>
        </paragraph>
        <paragraph num="(9)">
          <text>Estimated frequency of maintenance dredging, the volume of materials to be dredged over the life of the project, and site or sites to be used for disposal of these materials;</text>
        </paragraph>
        <paragraph num="(10)">
          <text>A description of how the speed, numbers, and directional movements of boat traffic will:</text>
          <paragraph num="(a)">
            <text>Be controlled in and out of the marina;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Impact commercial navigation; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Impact boats kept at the proposed marina facility, with the techniques to minimize the adverse impact of boat wakes on the proposed facility being addressed; and</text>
          </paragraph>
        </paragraph>
        <paragraph num="(11)">
          <text>A plan to minimize oil spillage into the basin and to identify contingencies for oil spill containment and removal.</text>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Pumpout Facilities.</text>
        <paragraph num="(1)">
          <text>A person may not construct additional slips at an existing property that would result in a total capacity of more than ten slips or construct a new marina with more than ten slips unless:</text>
          <paragraph num="(a)">
            <text>The marina has a wastewater collection and treatment system that is adequate to handle any existing and proposed flows and is approved by the local health department;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>There is a pumpout station on-site that is adequate to handle the increased sewage capacity from vessels that use the marina and that is operable and accessible at reasonable times; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The marina has a contract with a pumpout facility that is:</text>
            <paragraph num="(i)">
              <text>Located not more than 2 miles from the marina;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Adequate to handle the increased sewage capacity from vessels that use the marina, as determined by the local health department; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>Operable and accessible at reasonable times.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Wastewater collection and treatment facilities may be required, in consultation with the Department, if the marina:</text>
          <paragraph num="(a)">
            <text>Has a capacity of more than 25 slips;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Has a capacity of ten or more slips that are designed to accommodate boats of 25 feet or more in length; and</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Is located off the main stem of the major river tributaries of the Chesapeake Bay and coastal bays or in sensitive areas identified for no pollutant discharge by the State.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Vessel Mooring Facilities. The placement of buoys, group mooring buoys, and other apparatus used to secure, berth, or moor vessels in the waters of the State shall conform to the requirements of COMAR 08.04.13.</text>
      </paragraph>
      <paragraph num="F.">
        <text>Marina Management Plan. The location of all new marinas or expansion of an existing marina shall be consistent with a marina management plan, if any, that has been approved by the local government. If there is a conflict between a local marina management plan and this subtitle, the more stringent regulation takes priority.</text>
      </paragraph>
      <paragraph num="G.">
        <text>Marina Siting Guidelines.</text>
        <paragraph num="(1)">
          <text>New marina development and the expansion of existing marinas shall be located:</text>
          <paragraph num="(a)">
            <text>To avoid and minimize impacts to tidal wetlands and other aquatic resources; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>On waterways with strong flushing characterized by:</text>
            <paragraph num="(i)">
              <text>A bottom which slopes from headwaters to mouth without sumps or other features which inhibit complete water exchange;</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>The waterway has an unconstricted entrance; and</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>The waterway has few branches, coves, and other features which inhibit complete mixing.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>New marina development and expansion of existing marinas may not be located in areas where:</text>
          <paragraph num="(a)">
            <text>The natural depth is 4.5 feet or less at mean low water unless the marina basin is excavated from upland; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Their presence would adversely impact submerged aquatic vegetation, productive macroinvertebrate communities, shellfish beds, fish spawning or nursery areas, rare, threatened, or endangered species, or species in need of conservation, or historic waterfowl staging areas.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(3)">
          <text>Expansion of existing marinas is favored over development of new marinas.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".04" heading="Conduits, Cables, Pipes, or Other Crossings of State Tidal Wetlands.">
      <text>The construction, reconstruction, alteration, or addition to any conduit, cable, pipeline, intake or discharge pipe, trestle, or other similar device, structure, or apparatus, over, on, in, or under State tidal wetlands or waters of the State requires a license. A license issued for this construction is subject to the compensation requirements of COMAR 23.02.04 as may be assessed by the Board.</text>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, Title 16, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: February 14, 1994 (21:3 Md. R. 184)</annotation>
      <annotation type="History" subtype="Administrative History">(Wetlands regulations before February 14, 1994, appeared under COMAR 08.05.07)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .14 amended as an emergency provision effective August 1, 1995 (22:17 Md. R. 1309); amended permanently effective December 4, 1995 (22:24 Md. R. 1894)</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .01—.04 were recodified from Regulations .12, .14, .16, and .17, respectively, under COMAR 08.05.05 Tidal Wetlands, June 1996</annotation>
      <annotation type="History" subtype="Administrative History">Chapter revised as an emergency provision effective March 9, 2007 (34:7 Md. R. 695); emergency expired September 5, 2007</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01 repealed and new Regulation .01 adopted effective February 4, 2013 (40:2 Md. R. 73)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01-1 adopted effective February 4, 2013 (40:2 Md. R. 73)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01-2 adopted effective February 4, 2013 (40:2 Md. R. 73)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01-3 adopted effective February 4, 2013 (40:2 Md. R. 73)</annotation>
      <annotation type="History" subtype="Administrative History">Regulation .01-4 adopted effective February 4, 2013 (40:2 Md. R. 73)</annotation>
    </annotations>
  </chapter>
  <chapter num="05" heading="Mitigation">
    <regulation prefix="Regulation" num=".01" heading="Mitigation.">
      <paragraph num="A.">
        <text>Goal. It is the goal of the State to preserve tidal wetlands, prevent their loss and despoliation, and strive for a net resource gain in tidal wetlands acreage and function.</text>
      </paragraph>
      <paragraph num="B.">
        <text>Mitigation Requirements.</text>
        <paragraph num="(1)">
          <text>An applicant for a license or permit shall design a project to first avoid and then minimize the loss of tidal wetlands. If an applicant demonstrates that alteration of tidal wetlands cannot be avoided to accomplish the project, the Department shall:</text>
          <paragraph num="(a)">
            <text>Recommend that the Board require mitigation as a condition of a State tidal wetlands license; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Require mitigation as a condition of a private tidal wetlands permit.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Mitigation projects shall be designed to replace the values and functions associated with the wetlands to be impacted.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Mitigation projects shall be connected to existing tidal wetlands or tidal waterways. Projects may be located on multiple parcels. Projects shall be located according to the following geographic location in order of preference, unless otherwise determined by the Department:</text>
          <paragraph num="(a)">
            <text>Locations on-site;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Locations off-site in the:</text>
            <paragraph num="(i)">
              <text>Immediate watershed subsegment where the tidal wetland loss occurred,</text>
            </paragraph>
            <paragraph num="(ii)">
              <text>Watershed sub-basin where the tidal wetland loss occurred, or</text>
            </paragraph>
            <paragraph num="(iii)">
              <text>State minor basin where the tidal wetlands loss occurred.</text>
            </paragraph>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>Mitigation for the loss of tidal wetlands shall be considered in the following order of preference:</text>
          <paragraph num="(a)">
            <text>Restoration;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>In-kind creation;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Out-of-kind creation;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Enhancement of existing tidal wetlands;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Monetary compensation to the Wetlands Compensation Fund.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(5)">
          <text>Enhancement activities may be accepted in addition to tidal wetlands restoration or creation when the applicant has demonstrated to the satisfaction of the Department that enhancement provides additional protection or improves tidal wetlands functions. Activities may include:</text>
          <paragraph num="(a)">
            <text>Enhancement of degraded tidal wetlands; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Preservation of existing tidal wetlands.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(6)">
          <text>The Department may recommend that the Board accept monetary compensation only if the Department determines that creation, restoration, or enhancement of tidal wetlands are not feasible alternatives.</text>
        </paragraph>
        <paragraph num="(7)">
          <text>Mitigation requirements may be reduced or eliminated:</text>
          <paragraph num="(a)">
            <text>For shore erosion control projects that meet all of the requirements of COMAR 26.24.04.01; or</text>
          </paragraph>
          <paragraph num="(b)">
            <text>If the proposed project provides a significant environmental benefit as determined by the Department.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(8)">
          <text>The Department may not base a final tidal wetland permit decision or tidal wetland license recommendation solely on the environmental benefits of a mitigation proposal or the financial benefits of a monetary compensation proposal.</text>
        </paragraph>
        <paragraph num="(9)">
          <text>The Department may approve mitigation bank sites in consultation with the appropriate local, State, and federal agencies.</text>
        </paragraph>
      </paragraph>
      <paragraph num="C.">
        <text>Standards.</text>
        <paragraph num="(1)">
          <text>The Department may use acreage replacement ratios to determine the size of newly created, restored, or enhanced tidal wetlands as mitigation for the loss of existing tidal wetlands. Acreage replacement ratios are expressed as a relationship between two numbers. The first number is the acreage of tidal wetlands to be mitigated and the second is the acreage of tidal wetlands lost. Acreage replacement ratios for in-kind creation and restoration are as follows:</text>
          <paragraph num="(a)">
            <text>Open water tidal wetlands—1:1;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Emergent tidal wetlands—2:1;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Scrub-shrub tidal wetlands—2:1;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Forested tidal wetlands—2:1; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Tidal wetlands habitat for rare, threatened, or endangered species, or species in need of conservation—3:1.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>Out-of-kind creation and enhancement ratios are increased by a factor of 2.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A mitigation project, as built, shall meet the following plant survival criteria:</text>
          <paragraph num="(a)">
            <text>After 5 years, greater than 85 percent of the mitigation site shall be vegetated by planted species approved by the Department; and</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Allowances shall be made for natural species changes as long as the plant communities are similar to those lost.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(4)">
          <text>In determining if mitigation activities will replace tidal wetlands acreage and functional losses, the Department shall consider the following:</text>
          <paragraph num="(a)">
            <text>Degree to which the mitigation activity replaces the functions of the lost tidal wetlands;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Benefits of the mitigation activity in rehabilitating or maintaining tidal wetlands;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Scope and extent of the mitigation activity;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Proximity of the mitigation activity to the tidal wetlands loss;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Technical merits of the mitigation activity and its likelihood of long-term success;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>Adverse impact of the mitigation activity on natural resources;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Relationship of the mitigation activity to ongoing natural resource management activities; and</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Compatibility of the mitigation activity with approved comprehensive river or watershed management plans, if applicable.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="D.">
        <text>Mitigation Plan.</text>
        <paragraph num="(1)">
          <text>At a minimum, a mitigation plan shall contain the following information:</text>
          <paragraph num="(a)">
            <text>A plan view of the mitigation area drawn at a scale not smaller than 1 inch equals 50 feet, including the delineation of all existing and adjacent tidal and nontidal wetlands, submerged aquatic vegetation, and shellfish resources;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Existing and proposed elevations of the ground contours referenced to mean low water at the site;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Cross-section views if elevation changes are required to provide adequate substrate to support plant species;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The location and description of all existing and proposed tidal wetlands plants by species;</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Photographs of the affected tidal wetlands, including the types of vegetation;</text>
          </paragraph>
          <paragraph num="(f)">
            <text>The proposed method of construction, including temporary or permanent access roads;</text>
          </paragraph>
          <paragraph num="(g)">
            <text>Location, type, and characteristics of all borrow or fill materials and method of site grading;</text>
          </paragraph>
          <paragraph num="(h)">
            <text>Construction schedule;</text>
          </paragraph>
          <paragraph num="(i)">
            <text>Method of final site stabilization;</text>
          </paragraph>
          <paragraph num="(j)">
            <text>A description of how the proposed mitigation project will replace the functions of lost tidal wetlands; and</text>
          </paragraph>
          <paragraph num="(k)">
            <text>Monitoring plan.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>A licensee or permittee shall implement the mitigation plan before or concurrent with the construction of the project unless otherwise directed by the Department.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>A bond shall be recommended as a condition of a license or required as a permit condition to assure that mitigation is performed. The Department shall approve the form of the bond in accordance with Regulation .02 of this chapter.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Monitoring Report.</text>
        <paragraph num="(1)">
          <text>A permittee or licensee shall submit annual monitoring reports for 5 years from the completion of the construction of the mitigation project, unless the permittee or licensee has received written notice from the Department that the monitoring requirements have been fulfilled in less than 5 years. The monitoring report shall include the following:</text>
          <paragraph num="(a)">
            <text>A description of how the mitigation project meets the mitigation project standards in this regulation;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Photographs of the mitigation project;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The commercial source of planting stock whenever planting is required;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>A description of modifications which have been made or need to be made to implement the mitigation plan necessary to meet this regulation; and</text>
          </paragraph>
          <paragraph num="(e)">
            <text>An “as-built” site design plan shall be included in the first annual report, and subsequent reports shall detail any modifications to the “as built” plan.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The Department reserves the right to inspect the mitigation project at any reasonable time during the construction and required monitoring period, and any time after that to assess the long-term viability of the mitigation site.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>Through written notification to the permittee or licensee, the Department may extend the required monitoring period for not more than an additional 3-year period, for a total of 8 years, if the mitigation project fails to comply with the standards in §C of this regulation.</text>
        </paragraph>
      </paragraph>
    </regulation>
    <regulation prefix="Regulation" num=".02" heading="Bonding for Mitigation Purposes.">
      <paragraph num="A.">
        <text>This regulation does not apply to any State, county, or municipal government, or to projects licensed by the Board.</text>
      </paragraph>
      <paragraph num="B.">
        <text>This regulation only applies to those projects proposed and permitted by the Department in private tidal wetlands.</text>
      </paragraph>
      <paragraph num="C.">
        <text>The bond is payable to the Department and conditioned upon fulfillment of mitigation monitoring requirements.</text>
      </paragraph>
      <paragraph num="D.">
        <text>Alternative Forms of Security.</text>
        <paragraph num="(1)">
          <text>Instead of a surety bond, the Department may accept one of the following forms of security:</text>
          <paragraph num="(a)">
            <text>A deposit of cash or negotiable bonds of the federal government having a market value equal to the bond amount accompanied by a written agreement of the bank to pay the State on demand in the event of forfeiture;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>A certificate of deposit equal to the required bond amount, issued by a bank in the State and with a written agreement from the bank to pay the State on demand in the event of forfeiture;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>An irrevocable letter of credit equal to the bond amount, issued by a bank or financial institution organized to do business in the State, that expressly states that the total sum is guaranteed to be available and payable directly to the State on demand in the event of forfeiture;</text>
          </paragraph>
          <paragraph num="(d)">
            <text>The grant to the Department, in trust, of a deed, easement, or other interest in upland property owned by the permittee that has the same or greater monetary value than the selected mitigation site; or</text>
          </paragraph>
          <paragraph num="(e)">
            <text>Fulfillment of mitigation requirements before completion of the permitted activity which results in the loss of tidal wetlands.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The permittee shall submit to the Department the alternative form of security under this regulation, until authorized by the Department for release. Alternative forms of security may not be released until monitoring of the mitigation project has been successfully completed.</text>
        </paragraph>
      </paragraph>
      <paragraph num="E.">
        <text>Amount of Bond.</text>
        <paragraph num="(1)">
          <text>The amount of the bond for a permittee is $50,000 per acre of tidal wetlands mitigation required under the permit, or in an amount determined by the Department.</text>
        </paragraph>
        <paragraph num="(2)">
          <text>The permittee may request reduction of the bond amount by submitting a written request to the Department with a justification for reducing the bond amount, including estimated or actual costs to complete the mitigation project, and any other relevant information.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The Department shall determine whether a lesser amount is sufficient to cover the cost of the mitigation project, taking into account the following:</text>
          <paragraph num="(a)">
            <text>Number of acres to be mitigated;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>The cost of land in the area of the mitigation site;</text>
          </paragraph>
          <paragraph num="(c)">
            <text>The proposed method of mitigation; and</text>
          </paragraph>
          <paragraph num="(d)">
            <text>Any other relevant factors, including the likelihood of success of the project.</text>
          </paragraph>
        </paragraph>
      </paragraph>
      <paragraph num="F.">
        <text>Liability under the bond continues until the Department determines that the monitoring requirements have been fulfilled, and the surety or financial institution receives written notice from the Department that the mitigation project was successfully completed.</text>
      </paragraph>
      <paragraph num="G.">
        <text>A surety bond or other alternative form of security may be cancelled by the surety, bank, or other issuing entity when both of the following conditions are satisfied:</text>
        <paragraph num="(1)">
          <text>The surety notifies the Department and the permittee of its intent to cancel the bond, in writing, by certified mail, not less than 90 days before cancellation; and</text>
        </paragraph>
        <paragraph num="(2)">
          <text>At least 45 days before the cancellation date indicated in the notice, the permittee files a replacement bond from a surety, bank, or other issuing entity to provide a substitute security which will be effective on the cancellation date indicated in the notice.</text>
        </paragraph>
      </paragraph>
      <paragraph num="H.">
        <text>Bond Forfeiture.</text>
        <paragraph num="(1)">
          <text>The bond or other instrument securing compliance with the mitigation plan may be subject to forfeiture upon:</text>
          <paragraph num="(a)">
            <text>Revocation of a tidal wetlands license or permit;</text>
          </paragraph>
          <paragraph num="(b)">
            <text>Failure to comply with an administrative order; or</text>
          </paragraph>
          <paragraph num="(c)">
            <text>Failure to comply with any element of the approved mitigation plan.</text>
          </paragraph>
        </paragraph>
        <paragraph num="(2)">
          <text>The Department, in writing and by certified mail, shall notify the permittee, surety, or other financial institution of the Department's intention to initiate forfeiture proceedings and the grounds for forfeiture.</text>
        </paragraph>
        <paragraph num="(3)">
          <text>The permittee, surety, or other financial institution has 30 days from receipt of the notice of forfeiture to show cause why the bond or other instrument may not be forfeited.</text>
        </paragraph>
        <paragraph num="(4)">
          <text>On showing cause, the Department shall provide for a reasonable time for the permittee, surety, or other financial institution to correct the problem.</text>
        </paragraph>
        <paragraph num="(5)">
          <text>If the permittee, surety, or other financial institution fails to show cause, the bond is forfeited nisi and the Department shall notify the permittee, surety, or other financial institution. If a showing of an intention to correct the problem in compliance with the mitigation plan is not submitted within 30 days from forfeiture nisi, the bond shall be forfeited absolute.</text>
        </paragraph>
      </paragraph>
      <paragraph num="I.">
        <text>If tidal wetlands are adequately protected, the Department may allow an applicant to post one bond under Environment Article, §15-823, Annotated Code of Maryland, or another Department program requiring bonding.</text>
      </paragraph>
      <paragraph num="J.">
        <text>A permittee may not conduct a regulated activity in a tidal wetland if the permittee previously forfeited a bond under this subtitle, unless the permittee repays the Department the cost of completing the mitigation project in excess of the forfeited bond, plus interest at the rate set in Courts and Judicial Proceedings Article, §11-107(a), Annotated Code of Maryland. If the mitigation project is still not completed, the permittee shall complete the mitigation project at the permittee's expense according to the approved mitigation plan.</text>
      </paragraph>
    </regulation>
    <annotations>
      <annotation type="Authority">Environment Article, Title 16, Annotated Code of Maryland</annotation>
      <annotation type="History" subtype="Administrative History">Effective date: February 14, 1994 (21:3 Md. R. 184)</annotation>
      <annotation type="History" subtype="Administrative History">(Wetlands regulations before February 14, 1994, appeared under COMAR 08.05.07)</annotation>
      <annotation type="History" subtype="Administrative History">Regulations .01 and .02 were recodified from Regulations .21 and .22, respectively, under COMAR 08.05.05 Tidal Wetlands, June 1996</annotation>
    </annotations>
  </chapter>
</subtitle>