<regulation prefix="Regulation" num=".04" citation="COMAR 26.24.03.04" title_num="26" subtitle_num="24" chapter_num="03" heading="Guidelines for Upland Disposal of Dredged Material.">
  <paragraph num="A.">
    <text>Disposal sites shall be designed to have the least impact on:</text>
    <paragraph num="(1)">
      <text>Public safety;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Adjacent properties; and</text>
    </paragraph>
    <paragraph num="(3)">
      <text>The environment.</text>
    </paragraph>
  </paragraph>
  <paragraph num="B.">
    <text>Dredged Material Placement Facilities.</text>
    <paragraph num="(1)">
      <text>Dredged material placement facilities shall be designed with the specifications set forth in §B(2)—(12) of this regulation unless otherwise determined by the Department.</text>
    </paragraph>
    <paragraph num="(2)">
      <text>All plans, reports, and supporting documentation shall be dated, sealed, and signed by a professional engineer licensed to practice in Maryland. All revisions shall be noted on the plans.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Soils shall be classified using the unified soil classification system.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>The minimum top width of an embankment is as follows:</text>
      <paragraph num="(a)">
        <text>Less than 5 feet high embankment, top width = 4 feet;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>6—10 feet high, top width = 6 feet; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Greater than 10 feet, top width shall be determined by the engineer approving the design.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>A weir box and antiflotation devices shall have a minimum safety factor of 1.2.</text>
    </paragraph>
    <paragraph num="(6)">
      <text>There shall be a minimum 2-foot freeboard to the settled top of an embankment.</text>
    </paragraph>
    <paragraph num="(7)">
      <text>Embankment cross-section side slopes dimensions shall be a minimum of 2 horizontal:1 vertical inside and 3 horizontal:1 vertical outside.</text>
    </paragraph>
    <paragraph num="(8)">
      <text>The placement facility shall have a controlled overflow structure design that removes excess ponded water from the facility and that is capable of completely stopping the flow of any effluent. The weir overflow shall have an adjustable crest elevation to remove surface water while assuring that the effluent is in compliance with water quality requirements under COMAR 26.08.02—.04, as established by the Department.</text>
    </paragraph>
    <paragraph num="(9)">
      <text>The placement shall have a pipe outlet design that:</text>
      <paragraph num="(a)">
        <text>Specifies that the minimum size is 8 inches in diameter;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Includes measures to control scour and erosion;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Provides an outlet channel that withstands the maximum outlet velocity anticipated; and</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Provides watertight joints.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(10)">
      <text>Size of Disposal Facility.</text>
      <paragraph num="(a)">
        <text>The design of the disposal facility shall address effluent water quality based on surface area, embankment height, settling time, and sediment consolidation. When sizing the facility, allowances shall be incorporated in the design for ponding depth and freeboard requirements.</text>
      </paragraph>
      <paragraph num="(b)">
        <text>A stage-storage curve or table is required.</text>
      </paragraph>
      <paragraph num="(c)">
        <text>The size of the disposal facility shall be calculated using one of the procedures in §B(10)(d), (e), or (f) of this regulation.</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Formula:</text>
        <paragraph num="(i)">
          <text>V = (Qd)(B), where V equals total disposal volume required in cubic yards, Qd is the quantity of material to be dredged in cubic yards, and B is the bulking (expansion) factor.</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>Figure 1 in §B(10)(d)(iii) of this regulation shall be used when selecting a bulking factor for hydraulic dredgings. A bulking factor of 1.4 shall be used for mechanical dredging.</text>
        </paragraph>
        <paragraph num="(iii)">
          <text>Figure 1 (Hydraulic Dredged Material Bulking Factors/Percent Passing #200 Sieve).</text>
        </paragraph>
      </paragraph>
      <paragraph num="(e)">
        <text>Size calculations may be made according to the “Confined Disposal of Dredged Material, EM 1110-2-5207, U. S. Army Engineer Waterways Experiment Station, Vicksburg, MS (1987)”, which is incorporated by reference.</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Size calculations may be made according to the “Environmental Effects of Dredging Technical Notes, Confined Disposal Guidance for Small Hydraulic Maintenance Dredging Projects-Design Procedures, EEDP-02-8, U. S. Army Engineer Waterways Experiment Station, Vicksburg, MS (December, 1988)”, which is incorporated by reference.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(11)">
      <text>Soils containing organic matter shall be rejected for use in the embankment of disposal facilities.</text>
    </paragraph>
    <paragraph num="(12)">
      <text>The design of the disposal facility shall include regulating provisions for the flow of dredge material into the basin or increasing the depth of ponded water at the overflow weir if the concentration of suspended solids in the effluent increases above acceptable limits.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Construction Requirements.</text>
    <paragraph num="(1)">
      <text>The Department may require that construction of a disposal facility:</text>
      <paragraph num="(a)">
        <text>Is under the supervision of a professional engineer licensed to practice in Maryland under Business Occupations and Professions Article, Title 14, Subtitle 3, Annotated Code of Maryland; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Meets all provisions of this subtitle.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>Materials failing to meet specifications in this subtitle shall be removed.</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Design changes shall be reported to the Department for approval in accordance with COMAR 26.24.02.07 before proceeding with construction.</text>
    </paragraph>
    <paragraph num="(4)">
      <text>When construction of a disposal facility is complete, the Department may require submittal of a report that includes:</text>
      <paragraph num="(a)">
        <text>Date, location, and results of all material tests made;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Narrative of construction, including any problems and design changes; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>“As built” plans sealed and signed by a professional engineer licensed to practice in Maryland.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Conditions. Disposal facilities are prohibited in the critical area buffer unless approved in accordance with COMAR 27.01.03.04B, COMAR 27.02.05.04B, and a State-approved critical area program of a local jurisdiction.</text>
  </paragraph>
</regulation>