<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".01-2" citation="COMAR 27.01.09.01-2" title_num="27" subtitle_num="01" chapter_num="09" heading="Mitigation and Planting Standards.">
  <paragraph num="A.">
    <text>Applicability. The requirements of this regulation are applicable to a development or redevelopment activity that occurs on a lot or parcel that includes a buffer when that development or redevelopment activity is located inside the buffer.</text>
  </paragraph>
  <paragraph num="B.">
    <text>As applicable to a site, a local jurisdiction shall require that a buffer management plan in accordance with Regulation .01-3 of this chapter satisfy the planting and mitigation standards of this regulation and satisfy the buffer establishment standards required under Regulation .01-1 of this chapter so as to:</text>
    <paragraph num="(1)">
      <text>Prohibit the installation or cultivation of new lawn or turf on-site in the buffer;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Ensure the planting of native species in compliance with the amounts specified under §§C, D, H, J, and K of this regulation;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Ensure coverage of the buffer with mulch or native ground cover or both until buffer plantings are established; and</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Ensure plantings are distributed throughout the buffer to provide optimum habitat and water quality benefits.</text>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>Permanent Disturbance. As applicable to a site, a local jurisdiction shall calculate the cumulative amount of buffer mitigation required for permanent disturbance in accordance with the following standards:</text>
    <paragraph num="(1)">
      <text>Except as specified under §C(2) and (3) of this regulation, mitigation for a development or redevelopment activity in the buffer or for the removal of an individual tree, developed woodland, or forest shall be calculated:</text>
      <paragraph num="(a)">
        <text>According to the ratios under §H of this regulation; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Based on the square footage of the area of the canopy coverage removed, as determined by the local jurisdiction.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(2)">
      <text>For removal of a diseased, dying, invasive, or hazardous tree:</text>
      <paragraph num="(a)">
        <text>Mitigation shall be one tree of at least a 3/4-inch caliper for each tree removed; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>The affected area shall be stabilized in native woody vegetation, if a tree cannot be replanted due to space constraints.</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>For removal of a dead tree, the affected area shall be stabilized with native groundcover or other native vegetation as necessary.</text>
    </paragraph>
  </paragraph>
  <paragraph num="D.">
    <text>Temporary Disturbance. As applicable to a site, a local jurisdiction shall require that an area in the buffer that is temporarily disturbed by a development activity be restored to pre-disturbance conditions.</text>
  </paragraph>
  <paragraph num="E.">
    <text>Except as authorized under §F of this regulation, if mitigation planting cannot be located on-site within the buffer because of site constraints, a local jurisdiction shall require planting in the following order of priority:</text>
    <paragraph num="(1)">
      <text>On-site and adjacent to the buffer; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>On-site elsewhere in the Critical Area.</text>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>A local jurisdiction may authorize payment of a fee in lieu of buffer mitigation under Regulation .01-5 of this chapter, but only if there is no feasible alternative.</text>
  </paragraph>
  <paragraph num="G.">
    <text>A local jurisdiction may authorize off-site planting in the buffer if this option is part of a local Critical Area program approved by the Commission or the subject of a written agreement between the local jurisdiction and the Commission.</text>
  </paragraph>
  <paragraph num="H.">
    <text>Permanent Disturbance. In accordance with the applicable activity, a local jurisdiction shall require the following ratios of mitigation for each permanent disturbance:</text>
  </paragraph>
  <paragraph num="I.">
    <text>A local jurisdiction may authorize an applicant to deduct from the total mitigation requirement an area of lot coverage removed from the buffer if:</text>
    <paragraph num="(1)">
      <text>The lot coverage existed before the date of local program adoption or was allowed by local procedures; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The total area is stabilized.</text>
    </paragraph>
  </paragraph>
  <paragraph num="J.">
    <text>A local jurisdiction may authorize a combination of plantings for buffer mitigation in accordance with the following table:</text>
  </paragraph>
  <paragraph num="K.">
    <text>A local jurisdiction may authorize a combination of plantings and natural regeneration for buffer establishment in accordance with the following table:</text>
  </paragraph>
  <paragraph num="L.">
    <text>A local jurisdiction shall apply the following planting credits for the type and size of the vegetation proposed:</text>
  </paragraph>
  <paragraph num="M.">
    <text>A local jurisdiction may authorize an applicant to increase the percentage of large shrubs, small shrubs, or herbaceous perennials in a buffer management plan if:</text>
    <paragraph num="(1)">
      <text>The buffer has existing canopy coverage of at least 50 percent; or</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Site constraints that preclude canopy planting, including severely eroding slopes, salt water intrusion, predominately sandy soils, or unconsolidated fill.</text>
    </paragraph>
  </paragraph>
  <paragraph num="N.">
    <text>All landscaping stock planted in accordance with §L of this regulation shall be 100 percent guaranteed for at least 2 years after planting is completed.</text>
  </paragraph>
  <paragraph num="O.">
    <text>A local jurisdiction may use the following table to allow flexible stocking size when authorized under §§J and K of this regulation:</text>
  </paragraph>
  <paragraph num="P.">
    <text>A local jurisdiction may not:</text>
    <paragraph num="(1)">
      <text>Authorize a variance to the planting and mitigation standards under this regulation; or</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Issue a final use and occupancy permit for an application under Regulation .01-3B(2) of this chapter unless the applicant:</text>
      <paragraph num="(a)">
        <text>Completes the planting required under an approved buffer management plan; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Pending completion of the planting required under an approved buffer management plan during the next planting season, provides financial assurance to cover the costs for:</text>
        <paragraph num="(i)">
          <text>Materials and installation; and</text>
        </paragraph>
        <paragraph num="(ii)">
          <text>In the case of a mitigation or establishment requirement that is at least 5,000 square feet, long-term survivability in accordance with the requirements of Regulation .01-3J(2)(d) of this chapter.</text>
        </paragraph>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="Q.">
    <text>Before recordation of a final subdivision or final approval of a site plan for a multifamily, commercial, industrial, or institutional use, an applicant shall:</text>
    <paragraph num="(1)">
      <text>Post permanent signs delineating the upland boundary of the buffer at a ratio of at least one sign per lot or per 200 linear feet of shoreline, whichever is applicable; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Design each sign required under §Q(1) of this regulation so that it:</text>
      <paragraph num="(a)">
        <text>Is at least 6 inches in width and 8 inches in height;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Is placed at a height of 4.5 feet, but not attached to a tree; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Clearly states “Critical Area Buffer” No clearing or disturbance permitted".</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="R.">
    <text>Concurrent with the recordation of a final plat and in accordance with Regulation .01-3 of this chapter, an applicant shall record an easement or similar instrument for a buffer management plan.</text>
  </paragraph>
  <paragraph num="S.">
    <text>A local jurisdiction may not approve a final subdivision application until the jurisdiction has reviewed and approved the buffer management plan submitted under Regulation .01-3 of this chapter.</text>
  </paragraph>
</regulation>