# COMAR Title 27 — Critical Area Commission for the Chesapeake and Atlantic Coastal Bays

## Subtitle 01 — Criteria for Local Critical Area Program Development

### Chapter 14 — Renewable Energy Generating Systems

#### Regulation .02-1 Application Requirements.

*COMAR 27.01.14.02-1*

A. To ensure compliance with the requirements of this chapter for a major solar energy generating system in a resource conservation area, a local jurisdiction shall require a site plan that addresses the requirements of COMAR 27.02.07 and includes the following:

  (1) Calculations of any required reservation of resource conservation area density development rights; and

  (2) The identification and location of property restrictions including the boundary and area of a conservation easement, restrictive covenant, or other protective instrument.

B. A local jurisdiction may require a site plan for a minor solar energy generating system.
