<?xml version='1.0' encoding='utf-8'?>
<regulation prefix="Regulation" num=".03" citation="COMAR 36.04.01.03" title_num="36" subtitle_num="04" chapter_num="01" heading="Submission of Equipment, a System, or Software for Testing and Certification.">
  <paragraph num="A.">
    <text>A manufacturer seeking Commission approval for equipment, a system, or software other than a video lottery terminal shall submit the equipment, system, or software to an independent certified testing laboratory.</text>
  </paragraph>
  <paragraph num="B.">
    <text>The submission required by §A of this regulation shall include the following:</text>
    <paragraph num="(1)">
      <text>A request for testing and certification under Regulation .02F of this chapter;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>A prototype of the equipment, system, or software identical in all mechanical, electrical, electronic, and other respects to that for which Commission approval is sought;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Technical and operator manuals;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>A description of all security methodologies incorporated into the design of the equipment, system, or software including, if applicable:</text>
      <paragraph num="(a)">
        <text>Password protection;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Encryption methodology for all alterable media;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Auto-authentication of software;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Network redundancy; and</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Back-up and recovery procedures;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(5)">
      <text>A schematic or network diagram of the major components of the equipment, system, or software with a:</text>
      <paragraph num="(a)">
        <text>Description of each component's functionality; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Software object report;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(6)">
      <text>A description of the data flow, in narrative and in schematic form, including:</text>
      <paragraph num="(a)">
        <text>Data cabling; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>If applicable, communications methodology for multi-site applications;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(7)">
      <text>A list of:</text>
      <paragraph num="(a)">
        <text>Computer operating systems;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Third-party software; and</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Available system reports;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(8)">
      <text>System software and hardware installation procedures;</text>
    </paragraph>
    <paragraph num="(9)">
      <text>A description of the method used to authenticate software;</text>
    </paragraph>
    <paragraph num="(10)">
      <text>All source code;</text>
    </paragraph>
    <paragraph num="(11)">
      <text>If applicable, a description of the features offered by the equipment, system, or software with regard to:</text>
      <paragraph num="(a)">
        <text>Player and employee card functions; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Reconciliation procedures;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(12)">
      <text>If applicable, a description of any interoperability testing conducted by the manufacturer, including test results identified by manufacturer, model, and software identification and version number, for the submitted equipment, system, or software's connection to any of the following:</text>
      <paragraph num="(a)">
        <text>Video lottery terminal;</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Video lottery terminal data system;</text>
      </paragraph>
      <paragraph num="(c)">
        <text>Casino management system;</text>
      </paragraph>
      <paragraph num="(d)">
        <text>Gaming ticket system;</text>
      </paragraph>
      <paragraph num="(e)">
        <text>Promotional play system;</text>
      </paragraph>
      <paragraph num="(f)">
        <text>Player tracking system;</text>
      </paragraph>
      <paragraph num="(g)">
        <text>Ticket redemption unit;</text>
      </paragraph>
      <paragraph num="(h)">
        <text>Automated jackpot payout machine;</text>
      </paragraph>
      <paragraph num="(i)">
        <text>External bonusing system;</text>
      </paragraph>
      <paragraph num="(j)">
        <text>Cashless funds transfer system; and</text>
      </paragraph>
      <paragraph num="(k)">
        <text>Progressive controller;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(13)">
      <text>If applicable, a description, accompanied by diagrams, schematics, and specifications, of the creation of a:</text>
      <paragraph num="(a)">
        <text>Gaming ticket and the redemption options available; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Promotional play instrument and the redemption options available; and</text>
      </paragraph>
    </paragraph>
    <paragraph num="(14)">
      <text>If requested by the Commission or an independent certified testing laboratory:</text>
      <paragraph num="(a)">
        <text>Any specialized hardware, software, or other equipment, inclusive of technical support and maintenance, required to conduct the testing and certification process; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Additional documentation pertaining to the equipment, system, or software being tested.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="C.">
    <text>A manufacturer seeking Commission approval for a modification to a Commission-approved version of equipment, a system, or software other than a video lottery terminal shall submit the proposed modification to an independent certified testing laboratory.</text>
  </paragraph>
  <paragraph num="D.">
    <text>An independent certified testing laboratory selected by a manufacturer or the Commission to test a modification may be, but need not be, the testing laboratory that performed the initial prototype testing.</text>
  </paragraph>
  <paragraph num="E.">
    <text>The submission required by §C of this regulation shall include the following:</text>
    <paragraph num="(1)">
      <text>A request for testing and certification under Regulation .02F of this chapter;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>The equipment, system, or software proposed for modification;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>A description of the proposed modification, accompanied by applicable diagrams, schematics, and specifications;</text>
    </paragraph>
    <paragraph num="(4)">
      <text>A narrative disclosing the purpose for the modification;</text>
    </paragraph>
    <paragraph num="(5)">
      <text>If requested by the Commission or an independent certified testing laboratory:</text>
      <paragraph num="(a)">
        <text>Any specialized hardware, software, or other equipment, inclusive of technical support and maintenance, required to conduct the testing and certification process; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Additional documentation pertaining to the testing of the proposed modification.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="F.">
    <text>At the conclusion of testing of a prototype or modification of equipment, a system, or software other than a video lottery terminal, an independent certified testing laboratory shall issue to the Commission a certification report in an:</text>
    <paragraph num="(1)">
      <text>Electronic form; and</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Format acceptable to the Commission.</text>
    </paragraph>
  </paragraph>
  <paragraph num="G.">
    <text>Upon receipt of a certification report from an independent certified testing laboratory, but prior to a decision to approve a prototype or modification of equipment, a system, or software other than a video lottery terminal, the Commission may require a trial period, as follows:</text>
    <paragraph num="(1)">
      <text>A trial period shall be of a scope and duration the Commission deems appropriate to assess the operation of the prototype or modification in a live gaming environment;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>A trial period shall be subject to compliance by the manufacturer and the facility operator with specific terms and conditions required by the Commission, which may include:</text>
      <paragraph num="(a)">
        <text>Development and implementation of product specific accounting and internal controls; and</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Periodic data reporting to the Commission;</text>
      </paragraph>
    </paragraph>
    <paragraph num="(3)">
      <text>The Commission may authorize the receipt of compensation by a manufacturer during a trial period; and</text>
    </paragraph>
    <paragraph num="(4)">
      <text>The Commission may order termination of a trial period at any time upon a determination by the Commission that:</text>
      <paragraph num="(a)">
        <text>A manufacturer or facility operator has not complied with the terms and conditions required by the Commission; or</text>
      </paragraph>
      <paragraph num="(b)">
        <text>Equipment, a system, or software is not performing as expected.</text>
      </paragraph>
    </paragraph>
  </paragraph>
  <paragraph num="H.">
    <text>Upon receipt of a certification report from an independent certified testing laboratory, the Commission may:</text>
    <paragraph num="(1)">
      <text>Approve the prototype or modification, with or without specific conditions;</text>
    </paragraph>
    <paragraph num="(2)">
      <text>Reject the prototype or modification;</text>
    </paragraph>
    <paragraph num="(3)">
      <text>Require additional testing; or</text>
    </paragraph>
    <paragraph num="(4)">
      <text>Require a trial period under §G of this regulation.</text>
    </paragraph>
  </paragraph>
  <paragraph num="I.">
    <text>Commission approval of a prototype or modification does not constitute a guarantee of its safety or reliability.</text>
  </paragraph>
</regulation>